HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205, Page 4 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Mar 29 23:48:12 2020, Jan, Analysis, run0251: E_spectra for CsISiPhos  14x
Entry  Mon Mar 30 00:32:32 2020, Ragan, Runs, First measurement with 206Pb81+ beam 
Entry  Mon Mar 30 01:01:53 2020, Ragan, Runs, First measurement with 206Pb81+ beam 
Entry  Mon Mar 30 01:07:29 2020, Ragan, General, Problem with SIS runstop: 0256 
Entry  Mon Mar 30 01:25:57 2020, Ragan, Runs, First measurement with 206Pb81+ beam 
Entry  Mon Mar 30 01:43:58 2020, Ragan, General, First measurement with 206Pb81+ beam pattern details 90FC7D41-6C97-4760-B5A3-3CF60643A405.jpegBF20DBD8-1672-4817-8412-13B29CBF2E0A.jpeg
Entry  Mon Mar 30 02:00:46 2020, Ragan, Runs, First measurement with 206Pb81+ beam 
Entry  Mon Mar 30 02:27:44 2020, Ragan, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Mon Mar 30 02:58:51 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Mon Mar 30 03:30:03 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Mon Mar 30 04:00:19 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Mon Mar 30 04:15:29 2020, Ragan, General, Second measurement with 206Pb81+ beam at I_cooler = 200 mA 1A7AE154-6A88-4AED-BA5D-748025FCD226.jpeg
Entry  Mon Mar 30 04:30:17 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Mon Mar 30 06:15:13 2020, Ragan, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 06:30:52 2020, Ragan, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 06:34:47 2020, Ragan, General, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  C7A2736D-9C0A-4531-A768-85A55943EB5A.jpeg
Entry  Mon Mar 30 07:02:15 2020, tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 07:34:06 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 08:00:40 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 08:32:05 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
ELOG V3.1.5-fc6679b