HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Bound beta decay experiment on Tl-205, Page 5 of 9  Not logged in ELOG logo
Entry  Mon Mar 30 08:00:40 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 08:32:05 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 08:56:04 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  
I_cooler = 10 mA

beam: 206Pb81+
Entry  Mon Mar 30 10:01:31 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 10:32:01 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 10:57:43 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 12:16:04 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 12:33:04 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 13:02:49 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 13:31:58 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 14:02:41 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Thu Apr 2 05:00:44 2020, Ragan, Esther, Oliver, Runs, Second measurement with 2 hrs storage time 734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg
Electron cooler was off here. Thus, this measurement is not what we needed.
(in the picture below, it can be seen that the beam is not cooled)
Entry  Wed Aug 25 15:13:41 2021, Jan, DAQ, SC13 clock frequency 
The frequency of the clock used as reference in scaler channel 13 has been measured precisely.
In contrast to what was expected (1.5MHz precisely), it is: 
Entry  Tue Mar 31 00:47:18 2020, Yuri, Runs, S2 slits 0/+35 mm, target bump +13 mm 
Run start: 0276.lmd
Entry  Mon Mar 30 09:34:02 2020, Tino, Runs, Restart of second measurement with 206Pb81+ beam at I_cooler = 10 mA  
Stopped Data recording for Restart of the measurement

I_cooler = 10 mA
Entry  Thu Feb 27 14:04:12 2020, Ruijiu Chen, Detectors, Remote control of HV module 20180711ChargeParticleDetectorV8.jpg
Be careful. The voltage value on user interface is 10 times of real value. e.g. if the real value is 32V, the voltage value on UI has to be 320V. 
[IMG]elog:17/1[/IMG]
Entry  Sat Mar 28 11:20:10 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, Reducing beam intensity in ESR 
Yuri reduces beam intensity in the ESR to reduce the countrate on the detectors.
Entry  Sun Mar 29 18:41:31 2020, ruijiu, Analysis, Ratio between MPWC rate and DSSD rate ratio.png
slit Ratio error
-1 18.64 0.4
-2 18.18 0.38
Entry  Thu Sep 13 11:32:17 2018, Jan Glorius, Collaboration, Proposal E121_Litvinov.pdfE121_Approval.pdf
Attached is the beam time proposal submitted and accepted by the G-PAC in 2017.
Entry  Mon Mar 30 01:07:29 2020, Ragan, General, Problem with SIS runstop: 0256 
There is problem with SIS
Run stop: 0257.lmd (at1:06)
ELOG V3.1.5-fc6679b