  Bound beta decay experiment on Tl-205, Page 2 of 9  Not logged in ELOG logo
Entry  Sat Mar 28 18:11:13 2020, Alex, Yuri, General, no beam in the ESR 
Yuri and Sergey (on phone) have investigated extensively the problem with having no beam in the ESR. The FRS has been checked and seems OK. The ESR is fine
as well.
The problem seems to be the timing. Ths SIS and the ESR seem to be completely out of synchronization. The on-call service for the control system has been
Entry  Tue Dec 8 15:47:07 2020, Jan, Detectors, manual preamp & shaper settings for CsISiPhos amp_settings.pdf
attached is a document showing fotos of all involved amplifiers in the chain to document the manual settings active during the experiment.

Summary:
Entry  Tue Mar 12 12:54:58 2019, Chen, Sidhu, DAQ, how to start DAQ and plot histogram. 000000000001_edit.png55_PM.pngdrawing-1.png
[B]1. login litv-exp account[/B]
rchen@lxg1254:/data.local2/2002_238UIMS$ ssh -X litv-exp@lxg0155.gsi.de
(don't login on lx-pool.)
Entry  Thu Oct 1 22:20:03 2020, Jan, DAQ, final unpacker config E121.specdet_mapping.hh
We identified an issue with randomly missing adc channels in all lmd-files before run 0273.
This led to errors in the unpacking process. 
Entry  Mon Nov 2 16:45:55 2020, Jan, DAQ, f_user & mbslog f_user.cmbslog.l
Attached is the f_user.c and the mbslog.l files.
The readout function is for the following setup:
3x ADC CAEN V785 
Entry  Sat Mar 28 16:12:25 2020, ruijiu, ragan, DAQ, enter ESR and turn on the HV crate. 
 
Entry  Sun Mar 29 14:29:13 2020, ruijiu, , e121_run_00240.lmd 
s6 positon at 50mm.
Entry  Wed Apr 1 01:05:36 2020, ruijiu, Detectors, detector position fixed at 60 mm VID_20200401_010416.mp4
The detector cable was disconnected . We entered and reconnected the cable.
Entry  Sun Mar 29 21:02:43 2020, ruijiu, Analysis, decay line of 205Tl beam main_s6_neg8_202003292059.pngmain_s6_neg8_202003292059.root
decay line of 205Tl beam with Ar gas jet target on and S6 slit at -8mm
Ar gas density~1e12 atoms/cm2
Entry  Mon Mar 29 16:31:09 2021, Pierre-Michel, DAQ, cross section Pb81onAr.png
(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8 = 1.29595
Entry  Sat Apr 4 13:41:04 2020, Shahab, Runs, cooler down 
cooler is down. only one device is off GECEBG2T. updated now it is working.
Entry  Mon Apr 6 14:57:04 2020, Shahab, Runs, cooler down 
cooler component GECEBG2T again had to be reset.
Entry  Tue Feb 25 15:49:58 2020, ruijiu chen, DAQ, changing scaling factor. 
How to change scaling factor?
The parameters is in f_user.c file:
1. open the f_user.C with emacs :
Entry  Sun Mar 29 14:01:45 2020, ruijiu, , beam position on DSSD IMG_20200329_140003.jpg
move the detector 1cm 
outside.from 60mm to 
70mm.
Entry  Sat Mar 28 15:23:05 2020, Alex, Ragan, Mei Bai , General, beam lifetime measurement 15854053877798703970476301545600.jpg
We see two species in the Schottky spectra during the beam lifetime measurement without the target. The one (probably the primiary beam) is significantly
better cooled than the other.
So, we were wondering what is the other beam? Maybe the recombined ones?
Entry  Thu Apr 9 11:47:28 2020, ruijiu, , backup data IMG_20200409_113155.jpg
2020.4.8  12:00Started copying 
data。
2020.4.9    11:52 Copied 6.3TB 
Entry  Fri Apr 17 18:27:34 2020, ruijiu, Analysis, backup data IMG_20200417_162202.jpg
1.connect USB harddisk  to computer lxg1254 and  copy data to sever.

sync -rtmv --progress --checkSUD  /media/sdgl/data/ litv-exp@sbk0l9:/lustre/ap/litv-exp/2020-
Entry  Tue Mar 31 23:31:41 2020, Shahab, Runs, alpha_p calibration ap_calibration.jpg
Vc = 212849.9349
Ic = 0.2
Entry  Sun Apr 5 13:05:43 2020, Ragan, Shahab, Runs, Zero measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-05_13-04-08-686.png22A1BDA0-CAC3-4CB3-951E-F99ACD9CAED6.jpeg2020-04-05_13-58-21-916.pngCC28F701-F809-4100-982D-25E67770CAA7.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Thu Apr 2 21:03:40 2020, Ragan, Yuri, Sergey, Nikos, Runs, Zero hour measurement (S2:-10/35 mm) 
beam: 205Tl81+ (no scraping, Al ~1g/cm2)
energy: 400 MeV/u
storage time: zero hrs