HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 7 of 29  Not logged in ELOG logo
ID Date Author Category Subject Year Text Attachments
  458   Wed May 26 03:32:17 2021 Michele, CobusRunsRun 01242021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  457   Wed May 26 02:30:58 2021 Michele, CobusRunsRun 01232021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  456   Wed May 26 01:29:00 2021 Michele, CobusRunsRun 01222021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  455   Wed May 26 00:29:07 2021 Michele, CobusRunsRun 01212021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  454   Tue May 25 23:27:30 2021 Beatriz, CobusRunsRun 01202021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  453   Tue May 25 22:14:52 2021 Robert, ShahabRunsRun 01192021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  452   Tue May 25 22:03:22 2021 Robert/ShahabRunsLifetime measurement2021Run 0118

Gas jet target has been turned off for lifetime
  
  451   Tue May 25 20:46:29 2021 Robert, ShahabRunsRun 01182021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  450   Tue May 25 18:46:04 2021 Robert/ShahabAcceleratorQuadrupoles down2021All quadrupoles went off, waiting for the
on-call service
  
  449   Tue May 25 17:12:59 2021 Robert/ShahabAcceleratorBeam2021Beam is back; It is now being optimized   
  448   Tue May 25 15:56:48 2021 Robert/ShahabAcceleratorTrafo2021Trafo was set to 0   
  447   Tue May 25 13:49:51 2021 Oliver, Diego, JanGeneralNo Beam2021No beam from 13:49:00 until    
  446   Tue May 25 12:36:10 2021 Oliver, DiegoRunsRun 01172021No. of stacks: 30 (before 20)
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  445   Tue May 25 11:58:30 2021 JanAnalysis118(p,g) counts until run01152021The two attached plots show the collected
Si data up to run0115.
 run91to115_Si_map.pngrun91to115_Si_projection.png 
  444   Tue May 25 11:36:00 2021 Oliver, DiegoRunsRun 0116 - after ESR optimization2021No. of stacks: 30 (before 20)
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  443   Tue May 25 10:22:23 2021 Oliver, DiegoRunsRun 0115 - after ESR optimization2021DAQ node2 was on pause!

No. of stacks: 30 (before 20)
  
  442   Tue May 25 09:53:04 2021 Oliver, DiegoRuns(No)Run 01142021Run0114 was started after ESR optimization
but immedieatly again stopped...
  
  441   Tue May 25 09:11:13 2021 Oliver, DiegoRunsRun 0113 - stopped for ESR optimizations2021DAQ node2 was on pause!

No. of stacks: 30 (before 20)
  
  440   Tue May 25 08:51:50 2021 Oliver, DiegoRunsRun 0112 - stopped for filling detectors2021No. of stacks: 30 (before 20)
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  439   Tue May 25 08:36:15 2021 JanGenerallessons learned20211. before using stoch. cooling in ESR, boot
and update the windows PC
2. better diagnostics for low energy/intensity
  
ELOG V3.1.5-fc6679b