ID |
Date |
Author |
Category |
Subject |
Year |
Text |
|
289
|
Wed Mar 31 13:57:27 2021 |
Jan | Detectors | BaF HV settings | 2021 | The setting below is a start value for final
gain matching with a full ADC range of 12MeV:
|
|
290
|
Wed Apr 14 09:42:50 2021 |
Jan | Detectors | BaF HV gain matching | 2021 | The preliminary gain matching settings for
a full ADC range of ~12MeV:
|
|
291
|
Thu Apr 22 10:56:20 2021 |
Jan | Detectors | target-chamber det. distances | 2021 | This is the lookup table for the distance
of each x-ray detector to the target.
See attached foto for explanation.
|
|
292
|
Wed Apr 28 09:12:47 2021 |
Jan, Yuri | Detectors | UI-diagram | 2021 | The UI-curve of the detector
U I
10 0.11
|
|
307
|
Tue May 4 14:34:51 2021 |
Jan Glorius | Detectors | Xray weight control induces signals | 2021 | When the readout/control of the det. weight
control via serial connection is active,
there is a clear signal induced in the Xray |
|
363
|
Fri May 21 11:55:24 2021 |
Jan | Detectors | SI MSCF settings v1 | 2021 | attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not
BaF! |
|
390
|
Sat May 22 17:13:48 2021 |
Laszlo | Detectors | Si position changed | 2021 | Si was moved from -25 mm to -19 mm before
run 0072. |
|
397
|
Sat May 22 21:33:22 2021 |
Laszlo | Detectors | Xray detectors are filled at 90 and 35 | 2021 | |
|
478
|
Wed May 26 20:34:50 2021 |
Ragan, Thanassis | Detectors | Detector filling | 2021 | Jan is filling the detector after run0137. |
|
567
|
Sun May 30 14:40:55 2021 |
Jan, Sophia | Detectors | real detector assignment | 2021 | ************************************
GEM1800 @ 90deg (xray1)
GLP2000 @ 35deg (xray2)
|
|
577
|
Wed Jul 14 14:46:05 2021 |
Jan, Sophia | Detectors | collimator geometry | 2021 | We have measured the collimator geometry.
The annotations of the variables can be found
in the attached sketch
|
10x |
4
|
Wed Feb 6 10:16:09 2019 |
Laszlo Varga | General | Study on scraping | | A publication on scraping systems suggested
by Siegbert.
In the study they have used cylindrical "high-quality" |
|
Draft
|
Fri Jun 28 14:06:28 2019 |
Jan | General | CAD of (p,g) setup | | |
|
23
|
Wed Sep 25 13:58:24 2019 |
Laszlo | General | Gamow window energies for 118Te(p,g) | | # Z A Iso Re Rc T9 upper width mxpos
shift
52 118 te118 pg 20 0.5 1.39 0.58 1.06 |
|
35
|
Fri Feb 21 11:29:02 2020 |
Laszlo | General | Shift plan | | https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0 |
|
40
|
Wed Mar 11 14:33:44 2020 |
Laszlo | General | beam time manual | | Here you can find the digital version of the
E127 beam time manual. |
|
60
|
Tue Mar 17 08:15:49 2020 |
Jan | General | current grids & screen in TE | | measured beam diagnosis with 124Xe48+ at 326
MeV/u |
|
62
|
Wed Mar 18 09:53:28 2020 |
Laszlo, Jan | General | vacuum after opening gate valve | | Gate valve to DSSSD setup was opened on Tue
17.03. ~9:00
|
|
63
|
Thu Mar 19 09:43:28 2020 |
Laszlo | General | Status of the ESR | | After two days of tuning the beam, yesterday
evening (~8pm), it was found out that within
one ESR pattern using the new control system |
|
64
|
Thu Mar 19 15:09:29 2020 |
Jan | General | starting off with DSSSD | | here is my short guide how to start with the
measurement as soon as we have a beam available.
|
|