HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
proton-capture on 118Te, Page 29 of 29
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
Simulations
Accelerator
572 Entries
Goto page
Previous
1
,
2
,
3
...
27
,
28
, 29
ID
Date
Author
Category
Subject
Year
Text
198
Sun Mar 22 17:45:07 2020
Laszlo
General
switching to primary beam
We have finished the measurement with the
fragments.
361
Fri May 21 10:00:51 2021
Jan
Accelerator
target bump
2021
The target overlap was optimized on xray and
si rates.
The setting now is -10mm in SC9
201
Sun Mar 22 18:35:43 2020
Laszlo
target dropped aagain
there was a drop again from 8.6e13 to 7e13
in the target density
147
Sat Mar 21 21:36:06 2020
Jan
Runs
target incident
in run 66 or 67 we had a single ESR cycle
for which the target didn't switch off for
new injection and deceleration etc.
68
Fri Mar 20 01:21:00 2020
Laszlo
General
target is switched on event based
130
Sat Mar 21 14:52:05 2020
Laszlo
General
target optimization
previous position of the beam at target was
-3mm (for the night position)
max. intensity position of the beam at target
291
Thu Apr 22 10:56:20 2021
Jan
Detectors
target-chamber det. distances
2021
This is the lookup table for the distance
of each x-ray detector to the target.
See attached foto for explanation.
48
Sun Mar 15 17:13:21 2020
Laszlo, Jan
Calibration
the x-ray gate issue
We found a strange behaviour of our ADC gates
for the x-ray detectors.
The setting as shown in the foto below corresponds
277
Thu Apr 23 19:09:58 2020
Laszlo
Calibration
theoretical K-REC cross sections
Find attached Andrey Surzhykov's calculations
for the theta angle in respect to the beam
direction (in lab. frame) vs. cross section
9x
62
Wed Mar 18 09:53:28 2020
Laszlo, Jan
General
vacuum after opening gate valve
Gate valve to DSSSD setup was opened on Tue
17.03. ~9:00
241
Mon Mar 23 12:30:39 2020
laszlo
Analysis
with and without scraper
38
Tue Mar 10 09:41:26 2020
Jan
Detectors
x-ray background from BaF
The BaF2 detectors planned to be installed
at the target induce an additional background
in the x-ray detectors sitting below inside
Goto page
Previous
1
,
2
,
3
...
27
,
28
, 29
ELOG V3.1.5-fc6679b