HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te, Page 29 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subjectup Year Text Attachments
  198   Sun Mar 22 17:45:07 2020 LaszloGeneralswitching to primary beam We have finished the measurement with the
fragments.
  
  361   Fri May 21 10:00:51 2021 JanAcceleratortarget bump2021The target overlap was optimized on xray and
si rates.
The setting now is -10mm in SC9
  
  201   Sun Mar 22 18:35:43 2020 Laszlo target dropped aagain there was a drop again from 8.6e13 to 7e13
in the target density
 target_density_after_118Te_afternoon_runs.png 
  147   Sat Mar 21 21:36:06 2020 JanRunstarget incident in run 66 or 67 we had a single ESR cycle
for which the target didn't switch off for
new injection and deceleration etc.
 run67_target_incident.png 
  68   Fri Mar 20 01:21:00 2020 LaszloGeneraltarget is switched on event based     
  130   Sat Mar 21 14:52:05 2020 LaszloGeneraltarget optimization previous position of the beam at target was
-3mm (for the night position)
max. intensity position of the beam at target
 IMG_20200321_145105.jpgIMG_20200321_145059.jpg 
  291   Thu Apr 22 10:56:20 2021 JanDetectorstarget-chamber det. distances2021This is the lookup table for the distance
of each x-ray detector to the target.
See attached foto for explanation.
 E127_xray_distances.jpg 
  48   Sun Mar 15 17:13:21 2020 Laszlo, JanCalibrationthe x-ray gate issue We found a strange behaviour of our ADC gates
for the x-ray detectors.
The setting as shown in the foto below corresponds
 IMG_20200315_172129.jpg 
  277   Thu Apr 23 19:09:58 2020 LaszloCalibrationtheoretical K-REC cross sections  Find attached Andrey Surzhykov's calculations
for the theta angle in respect to the beam
direction (in lab. frame) vs. cross section
 9x 
  62   Wed Mar 18 09:53:28 2020 Laszlo, JanGeneralvacuum after opening gate valve Gate valve to DSSSD setup was opened on Tue
17.03. ~9:00
 vacuum_ESR1.jpgvacuum_setup1.jpg 
  241   Mon Mar 23 12:30:39 2020 laszloAnalysiswith and without scraper    124Xe_with_scraper_3D.png124Xe_with_scraper_2D.png124Xe_without_scraper_2D.png124Xe_without_scraper_3D.png 
  38   Tue Mar 10 09:41:26 2020 JanDetectorsx-ray background from BaF The BaF2 detectors planned to be installed
at the target induce an additional background
in the x-ray detectors sitting below inside
  
ELOG V3.1.5-fc6679b