ID |
Date |
Author |
Category |
Subject |
Year |
398
|
Sat May 22 21:40:09 2021 |
Pierre-Michel & Enis | Runs | Run 0077 | 2021 |
open file : e127b_run0077.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +2.5 mm (20mm away from beam)
run start: 21:39:33 22-05-2021
run stop: 22:20:22 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 1.2e8
ESR current at injection: 4e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14 |
397
|
Sat May 22 21:33:22 2021 |
Laszlo | Detectors | Xray detectors are filled at 90 and 35 | 2021 |
|
396
|
Sat May 22 20:47:39 2021 |
Pierre-Michel & Enis | Runs | Run 0076 | 2021 |
open file : e127b_run0076.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +2.5 mm (20mm away from beam)
run start: 1:: 22-05-2021
run stop: 21:21:38 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 1.3e8
ESR current at injection: 4.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14 |
395
|
Sat May 22 20:46:19 2021 |
Laszlo, Pierre.Michel, Enis | General | new scraper position | 2021 |
The scraper was moved into 2.5mm in absolute which corresponds to 20mm away from the beam axis.
Pressluft Antriebe
Position 1
GE01DD1IG (SC12) 2.5 mm
Position 2
GE01DD1IG (SC9) 2.5 mm |
394
|
Sat May 22 19:32:28 2021 |
Pierre-Michel & Enis | Runs | Run 0075 | 2021 |
open file : e127b_run0075.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm
run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 1.1e8
ESR current at injection: 2.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14 |
393
|
Sat May 22 19:05:13 2021 |
Pierre-Michel & Enis | Runs | Run 0074 | 2021 |
Note: SIS lost HF, no beam since 19:21. Stopped run early
open file : e127b_run0074.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm
run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 8e7
ESR current at injection: 3e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14 |
392
|
Sat May 22 18:05:22 2021 |
Pierre-Michel & Enis | Runs | Run 0073 | 2021 |
open file : e127b_run0073.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm
run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 9e7
ESR current at injection: 2e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14 |
391
|
Sat May 22 17:15:26 2021 |
Laszlo | General | Scraper position | 2021 |
We found the beam axis with the scraper to be -17.5 mm.
The Scraper position set to +12.5 mm, 30 mm relative from the beam. |
390
|
Sat May 22 17:13:48 2021 |
Laszlo | Detectors | Si position changed | 2021 |
Si was moved from -25 mm to -19 mm before run 0072. |
389
|
Sat May 22 17:01:33 2021 |
Pierre-Michel & Enis | Runs | Run 0072 | 2021 |
open file : e127b_run0072.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm
run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 9e7
ESR current at injection: 3e7
ESR particles after decel.: 3e6
Target ON density: 1.0e14 |
388
|
Sat May 22 16:29:07 2021 |
Laszlo et al. | General | coolers are back | 2021 |
we can measure again.
(please write a detailed description if needed) |
387
|
Sat May 22 16:28:10 2021 |
Laszlo | General | DSSSD movement | 2021 |
The DSSSD is moved back to its measurement position(-25mm). |
386
|
Sat May 22 14:53:34 2021 |
Beatriz et al. | General | DSSD Movement | 2021 |
DSSSD moved to the most in position in order to try to scrape the beam with the scraper. |
384
|
Sat May 22 11:22:02 2021 |
Beatriz, Yury, Jan | Runs | Run 0071 | 2021 |
open file : e127b_run0071.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used
run start: 11:21:40 22-05-2021
run stop: 11:56:31 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 50 Hz
Xray_ON_bdt: 500 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 9e7
ESR current at injection: 3e7
ESR particles after decel.: 3e6
Target ON density: 1.0e14
We close file so that Jan and Jury can go into the ESR to try to solve the problem with the control system of the scraper. |
383
|
Sat May 22 09:42:20 2021 |
Beatriz, Yury, Jan | Runs | Run 0070 | 2021 |
open file : e127b_run0070.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used
run start: 09:41:54 22-05-2021
run stop: 11:20:39 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 50 Hz
Xray_ON_bdt: 500 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 6e7
ESR current at injection: 3.1e7
ESR particles after decel.: 4.1e6
Target ON density: 1.0e14
No beam or low intensity for quite some while... |
382
|
Sat May 22 09:07:55 2021 |
Beatriz, Yury | Runs | Run 0069 | 2021 |
open file : e127b_run0069.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used
run start: 09:07:16 22-05-2021
run stop: 09:20:24 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 30 Hz
Xray_ON_bdt: 200 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 330 uA
SIS particles before: 2e7
ESR current at injection: 6e6
ESR particles after decel.: ~1e6
Target ON density: 1.0e14
|
381
|
Sat May 22 08:00:52 2021 |
Beatriz, Yury | Runs | Run 0068 | 2021 |
open file : e127b_run0068.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used
run start: 08:00:43 22-05-2021
run stop: 09:06:54 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 30 Hz
Xray_ON_bdt: 200 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 330 uA
SIS particles before: 2e7
ESR current at injection: 6e6
ESR particles after decel.: ~1e6
Target ON density: 1.0e14
The intensity is lower because they are preparing a 4He beam for R3B.
For a few minutes there were no particles in SIS.
We have quite some fluctuations in intensity in this run. |
380
|
Sat May 22 06:53:08 2021 |
Cobus, Michele, Beatriz, Yury | Runs | Run 0067 | 2021 |
open file : e127b_run0067.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used
run start: 06:52:32 22-05-2021
run stop: 08:00 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 50 Hz
Xray_ON_bdt: 450 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 7.3e7
ESR current at injection: 1.9e7
ESR particles after decel.: 2.0e6
Target ON density: 1.0e14
For some minutes there was no beam in the ESR because Yuri was trying to move the scraper. |
379
|
Sat May 22 05:49:31 2021 |
Cobus, Michele | Runs | Run 0066 | 2021 |
open file : e127b_run0066.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used
run start: 05:48:52 22-05-2021
run stop: 06:52:28 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 70 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 1.25e8
ESR current at injection: 3.75e7
ESR particles after decel.: 3.5e6
Target ON density: 1.0e14
|
378
|
Sat May 22 04:50:21 2021 |
Cobus, Michele | Runs | Run 0065 | 2021 |
open file : e127b_run0065.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used
run start: 04:49:47 22-05-2021
run stop: 04:48:41 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 70 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 1.1e8
ESR current at injection: 3.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
|