HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 11 of 29  Not logged in ELOG logo
ID Date Author Category Subjectdown Year Text Attachments
  94   Sat Mar 21 02:00:08 2020 Laszlo, Tino, OliverRunsrun entry - run051 Beam is back at 01:59 am.
Open file: runstart051
  
  95   Sat Mar 21 02:15:19 2020 Laszlo, Tino, OliverRunsrun entry - run051 Open file: runstart051

beam: 118Te52+
  
  96   Sat Mar 21 02:31:48 2020 Laszlo, Tino, OliverRunsrun entry - run051 Open file: runstart051

beam: 118Te52+
  
  98   Sat Mar 21 03:01:22 2020 Tino, OliverRunsrun entry - run051 Open file: runstart051

beam: 118Te52+
  
  81   Fri Mar 20 10:28:31 2020 Ragan, RuiJiuRunsrun entry - run050 Beam is back at 10:27 am.
Open file: runstart050
  
  82   Fri Mar 20 11:00:25 2020 Ragan, RuiJiuRunsrun entry - run050 Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
 IMG_20200320_111413.jpg 
  78   Fri Mar 20 07:30:16 2020 Ragan, RuiJiuRunsrun entry - run049 beam: 124Xe54+
energy: 10 MeV/u
  
  79   Fri Mar 20 08:01:40 2020 Ragan, RuiJiuRunsrun entry - run049 beam: 124Xe54+
energy: 10 MeV/u
  
  80   Fri Mar 20 08:30:52 2020 Ragan, RuiJiuRunsrun entry - run049 There is no beam due to water leakage in the
transfer channel of SIS.
  
  76   Fri Mar 20 06:34:40 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  77   Fri Mar 20 07:01:06 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  74   Fri Mar 20 05:32:44 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
  75   Fri Mar 20 06:00:26 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
  72   Fri Mar 20 04:32:22 2020 ShahabRunsrun entry - run046 beam: 124Xe54+
energy: 10 MeV/u
  
  73   Fri Mar 20 05:03:03 2020 ShahabRunsrun entry - run046 beam: 124Xe54+
energy: 10 MeV/u
  
  221   Mon Mar 23 04:08:12 2020 ShahabRunsrun 93 stopped run 93 which was during faulty kicker was
stopped so that the kicker module can be
repaired.
  
  140   Sat Mar 21 18:13:22 2020 ShahabGeneralrough comparison gas target off and on rough comparison of life time at 10 MeV/u
when target off with on. more noise in background
means weaker signal.
 target_effect.jpg 
  579   Wed Oct 13 15:15:53 2021 JanDAQroot-file header for analysis2021Attached is the header file needed for root
analysis.
 e127b.h 
  152   Sat Mar 21 23:12:38 2020 JanDetectorsremoved BaF detectors After run 67 and before run 68, the BaF detectors
have been removed in order to reduce the
Compton background in the x-ray detectors.
  
  567   Sun May 30 14:40:55 2021 Jan, SophiaDetectorsreal detector assignment2021************************************
GEM1800 @ 90deg (xray1) 
GLP2000 @ 35deg (xray2)
  
ELOG V3.1.5-fc6679b