HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 15 of 29  Not logged in ELOG logo
ID Date Authordown Category Subject Year Text Attachments
  55   Sun Mar 15 19:46:34 2020 LaszloCalibrationrun042 - Xray35 calib Ba133 - high rate Detector: 35
Source: Ba133, strong source
Distance: 334mm
  
  56   Sun Mar 15 20:26:08 2020 LaszloCalibrationrun043 - Xray35 calib Am241 Detector: 35
Source: Am241
Distance: 334mm
 run043_241Am_35.png 
  58   Sun Mar 15 21:01:23 2020 LaszloCalibrationrun044 - Xray35 calib Ba133 - a night long run  Detector: 35
Source: Ba133
Distance: 334mm
 run044_133Ba_high_35.png 
  63   Thu Mar 19 09:43:28 2020 LaszloGeneralStatus of the ESR After two days of tuning the beam, yesterday
evening (~8pm), it was found out that within
one ESR pattern using the new control system
  
  65   Thu Mar 19 19:14:40 2020 LaszloGeneralprimary beam measurement Now our aim is to decelerate the primary beam
(naked 124Xe) down to 10MeV/u. At this energy
we can test our detectors and that how the
  
  66   Thu Mar 19 23:48:56 2020 LaszloGeneral124Xe primary beam at 10Mev TargetOFF Beam lifetime is estimated to be 11sec at
least (hard to.see with the cursor the corrct
values on the shottky monitor) 
 IMG_20200319_232647.jpgIMG_20200319_232704.jpgIMG_20200319_234450.jpg 
  67   Fri Mar 20 01:11:58 2020 LaszloGeneralTarget - beam jntersection We have managed to find the target position
with the beam by looking at the xray spectra.
The trick was that at 10mev we 
 IMG_20200320_011008.jpg 
  68   Fri Mar 20 01:21:00 2020 LaszloGeneraltarget is switched on event based     
  70   Fri Mar 20 01:36:48 2020 LaszloGeneral124Xe primary beam at 10Mev TargetON We didmt see any effect on the lifetime if
the target is switched on. It is because
we use only hydrogen target (but why 
  
  84   Fri Mar 20 16:48:00 2020 LaszloGeneralflipped Si shaper output in x and y Yesterday evening we have found out that the
energy signals from the silicon are negative
--> wrong polarity of the shapers was chosen
  
  89   Fri Mar 20 22:51:36 2020 LaszloGeneralTarget on signal change From the previous settings:
JetOn
  mashine number 11
 IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg 
  90   Fri Mar 20 22:54:30 2020 LaszloGeneralFirst view of the beam Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible.
However we could.catch it somehow with Shottky
 IMG_20200320_222748.jpgIMG_20200320_223424.jpg 
  91   Fri Mar 20 23:43:26 2020 LaszloGeneralVacuum while moving in the detector at yesterday evening Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11
 DSSSD_moving_vacuum_change.JPGIMG_20200320_021131.jpg 
  92   Sat Mar 21 01:25:07 2020 LaszloGeneralVacuum while moving in the detector for fragment measurement Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11
 DSSSD_moving_vacuum_change1.JPG 
  93   Sat Mar 21 01:44:57 2020 LaszloGeneral  from the SIS side they could optimize the
intensity. we gained a factor ~3. Now the
SIS intensity is at 
  
  97   Sat Mar 21 02:36:44 2020 LaszloGeneraldetector and scraper position For the 124Xe primary beam measurement:
-with the DSSSD we scraped the beam at position
-40
 IMG_20200321_025644.jpg 
  118   Sat Mar 21 11:25:47 2020 Laszlo possible misalignement between target and fragment beam after 9hours of measurement we see only 19
counts on our targetON silicon detector histo.
this low count rate can indicate two scenarios:
 Te_measurement_after_first_night.png 
  119   Sat Mar 21 11:30:04 2020 LaszloGeneralMWPC movement now we try to move the capture detector (MWPC
in the 1. dipol before our Si setup) inside
the ring while the DAQ was ON
 MWPC_movement.png 
  123   Sat Mar 21 12:06:50 2020 LaszloGeneralrun61 - SCRAPER moved out we want to see any change on the Silicon count
rate, because we will have now also Rutherford
scattering. 
  
  125   Sat Mar 21 12:32:00 2020 LaszloGeneralEstimated target thickness Target thickness must be like 5mm (was measured
with a moving thin wire)
The beam thickness is small because of the
  
ELOG V3.1.5-fc6679b