ID |
Date |
Author |
Category |
Subject |
Year |
Text |
 |
4
|
Wed Feb 6 10:16:09 2019 |
Laszlo Varga | General | Study on scraping | | A publication on scraping systems suggested
by Siegbert.
In the study they have used cylindrical "high-quality" |
|
367
|
Fri May 21 15:20:54 2021 |
Rui-Jiu Chen | Runs | Stop DAQ | 2021 | Sergey is optimizing beam cycle. |
|
63
|
Thu Mar 19 09:43:28 2020 |
Laszlo | General | Status of the ESR | | After two days of tuning the beam, yesterday
evening (~8pm), it was found out that within
one ESR pattern using the new control system |
|
422
|
Mon May 24 17:23:41 2021 |
Pierre-Michel, Enis | General | Status of gas-target cooling | 2021 | Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status |
|
266
|
Tue Mar 24 10:59:18 2020 |
Jan | Calibration | Sources - Specifications | | We used the following sources:
[B]Am241[/B] (OM666) [GSI - Uwe]
|
   |
17
|
Tue Jul 9 15:26:59 2019 |
Yuanming Xing | Simulations | Simulated Rutherford scattering distribution on detector | | Simulated Rutherford scattering distribution
on detector
|
  |
199
|
Sun Mar 22 17:47:27 2020 |
Laszlo | | Si, Xrays target density spectra during 118Te afternoon measurement | | We got 30 counts out of this afternoon 118Te
run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.
|
 |
390
|
Sat May 22 17:13:48 2021 |
Laszlo | Detectors | Si position changed | 2021 | Si was moved from -25 mm to -19 mm before
run 0072. |
|
203
|
Sun Mar 22 19:15:03 2020 |
Laszlo | | Si moved out of the ring, high voltage is switched off | | |
|
35
|
Fri Feb 21 11:29:02 2020 |
Laszlo | General | Shift plan | | https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0 |
|
69
|
Fri Mar 20 01:22:23 2020 |
Shahab | Runs | Setting for Gas target | | Setting for the machines. |
|
391
|
Sat May 22 17:15:26 2021 |
Laszlo | General | Scraper position | 2021 | We found the beam axis with the scraper to
be -17.5 mm.
The Scraper position set to +12.5 mm, 30 |
|
239
|
Mon Mar 23 11:32:42 2020 |
Laszlo | General | SIS went down again | | run101 is stopped |
|
232
|
Mon Mar 23 09:33:11 2020 |
Laszlo | General | SIS failure again! | | run096 is stopped |
|
210
|
Mon Mar 23 00:13:25 2020 |
Laszlo | General | SIS and ESR beam currents | | |
 |
554
|
Sun May 30 00:14:58 2021 |
Oliver, Diego | General | SIS Pattern changed | 2021 | The pattern in SIS was changed so that we
get more injections into ESR. Before HTD
had 9 seconds which resulted in a timeout |
|
217
|
Mon Mar 23 03:07:11 2020 |
Shahab | Runs | SIS Kicker problem | | After calling ESR on-call duty (M. Steck)
he confirmed that the ESR is fine and suspected
the SIS kicker modules.
|
|
223
|
Mon Mar 23 05:59:01 2020 |
Shahab | Runs | SIS Kicker | | SIS Kicker seems to be working properly. but
we have to see how regularly it will work. |
|
363
|
Fri May 21 11:55:24 2021 |
Jan | Detectors | SI MSCF settings v1 | 2021 | attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not
BaF! |
|
133
|
Sat Mar 21 15:26:49 2020 |
Laszlo | General | SCRAPER is ON use again | | Yuri puts back the scraper (Egelhof 1 - GE01DD1IG)
into position = +19. (where it was in the
evening) |
|