HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 16 of 29  Not logged in ELOG logo
Entry  Wed Feb 6 10:16:09 2019, Laszlo Varga, General, Study on scraping,  1-s2.0-0168583X88900122-main.pdf
A publication on scraping systems suggested by Siegbert. 
In the study they have used cylindrical "high-quality" slits. "High-quality" stands for well polished surface
with surface roughness <50nm. The material of the slit is Tungsten Carbide. 
Entry  Fri May 21 15:20:54 2021, Rui-Jiu Chen, Runs, Stop DAQ, 2021 
Sergey is optimizing beam cycle. 
Entry  Thu Mar 19 09:43:28 2020, Laszlo, General, Status of the ESR,  
After two days of tuning the beam, yesterday evening (~8pm), it was found out that within one ESR pattern using the new control system the harmonics of
the cavities cannot be changed. This gives us a fatal limitation, that we cannot go lower 
than 10MeV/u with the beam energy.
Entry  Mon May 24 17:23:41 2021, Pierre-Michel, Enis, General, Status of gas-target cooling, 2021 
Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status 6"
Entry  Tue Mar 24 10:59:18 2020, Jan, Calibration, Sources - Specifications,  Pb-210-1.pdf241Am_Uwe.pdf133Ba_low.pdf133Ba_hi.pdf
We used the following sources:

[B]Am241[/B] (OM666) [GSI - Uwe]
Entry  Tue Jul 9 15:26:59 2019, Yuanming Xing, Simulations, Simulated Rutherford scattering distribution on detector,  6MeV.png7MeV.png8MeV.png
Simulated Rutherford scattering distribution on detector

   Beam: 111Sn
Entry  Sun Mar 22 17:47:27 2020, Laszlo, , Si, Xrays target density spectra during 118Te afternoon measurement,  End_of_118Te_runs.pngtarget_density_during_118Te_afternoon_runs.png
We got 30 counts out of this afternoon 118Te run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.
Entry  Sat May 22 17:13:48 2021, Laszlo, Detectors, Si position changed, 2021 
Si was moved from -25 mm to -19 mm before run 0072.
Entry  Sun Mar 22 19:15:03 2020, Laszlo, , Si moved out of the ring, high voltage is switched off,  
 
Entry  Fri Feb 21 11:29:02 2020, Laszlo, General, Shift plan,  
https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0
Entry  Fri Mar 20 01:22:23 2020, Shahab, Runs, Setting for Gas target,  IMG_20200320_012048.jpg
Setting for the machines.
Entry  Sat May 22 17:15:26 2021, Laszlo, General, Scraper position, 2021 
We found the beam axis with the scraper to be -17.5 mm.
The Scraper position set to +12.5 mm, 30 mm relative from the beam.
Entry  Mon Mar 23 11:32:42 2020, Laszlo, General, SIS went down again,  
run101 is stopped
Entry  Mon Mar 23 09:33:11 2020, Laszlo, General, SIS failure again!,  
run096 is stopped
Entry  Mon Mar 23 00:13:25 2020, Laszlo, General, SIS and ESR beam currents,  2020-03-23_00-09-48-737.png2020-03-23_00-21-43-581.png
 
Entry  Sun May 30 00:14:58 2021, Oliver, Diego, General, SIS Pattern changed, 2021 
The pattern in SIS was changed so that we get more injections into ESR. Before HTD had 9 seconds which resulted in a timeout in the ESR. Now HTD has 10
seconds which improved a lot...
Entry  Mon Mar 23 03:07:11 2020, Shahab, Runs, SIS Kicker problem,  IMG_20200323_021051.jpg
After calling ESR on-call duty (M. Steck) he confirmed that the ESR is fine and suspected the SIS kicker modules.

SIS operators then checked and could confirm that module 5 is out of order and module 4 sometimes works sometimes not.
Entry  Mon Mar 23 05:59:01 2020, Shahab, Runs, SIS Kicker ,  
SIS Kicker seems to be working properly. but we have to see how regularly it will work.
Entry  Fri May 21 11:55:24 2021, Jan, Detectors, SI MSCF settings v1, 2021 setting_test.1621590878
attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not BaF!
Entry  Sat Mar 21 15:26:49 2020, Laszlo, General, SCRAPER is ON use again,  
Yuri puts back the scraper (Egelhof 1 - GE01DD1IG) into position = +19. (where it was in the evening)
ELOG V3.1.5-fc6679b