HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 15 of 29  Not logged in ELOG logo
Entry  Fri Mar 20 19:37:43 2020, Jan, Calibration, Xray energies - rough 1. calibration ,  
-- E calibration seems to have changed! ---

This calibration is based on the source data taken before the experiment:
Entry  Sun Apr 5 20:34:42 2020, Laszlo, Calibration, Xray energies - 1. calibration,  8x
30angle:  E[keV] = 0.0158507 *ch-2.07456
90angle:  E[keV] = 0.01950*ch-2.76
145angle: E[keV] = 0.017988  *ch-1.809
Entry  Sat May 22 21:33:22 2021, Laszlo, Detectors, Xray detectors are filled at 90 and 35, 2021 
 
Entry  Sat Mar 21 01:25:07 2020, Laszlo, General, Vacuum while moving in the detector for fragment measurement,  DSSSD_moving_vacuum_change1.JPG
Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11
Entry  Fri Mar 20 23:43:26 2020, Laszlo, General, Vacuum while moving in the detector at yesterday evening,  DSSSD_moving_vacuum_change.JPGIMG_20200320_021131.jpg
Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11
Entry  Sun Mar 22 12:01:44 2020, Esther, Ragan, General, Vacuum problem with SIS,  
There is some problem with the vacuum in SIS and thus data recording is stopped.
Entry  Thu May 20 18:13:55 2021, Laszlo, General, Vacuum change while Si movement, 2021 IMG_20210520_174632.jpg
The vacuum remained in the E-10 range after moving the dsssd. The oscillation in the vacuum.values are due to the 
magnets ramping up and down
Entry  Wed Oct 23 14:51:43 2019, Jan, Laszlo, DAQ, VME modules & main.cfg,  main.cfg
Here is the current list of VME modules in our DRASI daq including HW addresses:

Slot    <module>        [HW addr.]
Entry  Thu Jun 24 09:43:01 2021, Jan Glorius, DAQ, Unpacker, 2021 
The unpacker used for the production runs of E127b is located at 
/u/litv-exp/unpacker/unpackexps/e127_TO_2021_with_ECL
Entry  Wed Apr 28 09:12:47 2021, Jan, Yuri, Detectors, UI-diagram, 2021 UI_meas_curve.pdf
The UI-curve of the detector
U I
10 0.11
Entry  Tue May 25 15:56:48 2021, Robert/Shahab, Accelerator, Trafo, 2021 
Trafo was set to 0
Entry  Thu May 20 18:11:24 2021, Laszlo, General, Touching the beam with Dsssd - current change, 2021 IMG_20210520_180857.jpg
 
Entry  Mon Jul 8 14:57:07 2019, Yuanming Xing, Detectors, The measurement of the tilting angle,  TiltingAngle.png
As shown in the figure, the detector is tilted by a certain angle which is about 45 degree. 
The tilted angle is defined as angle B.
We measured angle A using the vertical laser line (red) and papers with a straight line edge. So we can marked
Entry  Fri Oct 23 12:58:12 2020, Jan, Detectors, Test of 2nd DSSSD (gen2), 2021 Si2_run001.jpgSi2_run002.jpg
This is the documentation of the source tests with the 2nd micron DSSSD of 2nd generation (label 3288-17, thickness 529um)

The detector is put into vacuum (~5e-6 mbar) in our test chamber. The source is positioned a few cm above (see fotos).
    Reply  Fri Nov 20 15:53:37 2020, Jan, Analysis, Test of 2nd DSSSD (gen2), 2021 quick_si_plots.ce127.hSi2_run001.ana.rootSi2_run002.ana.root
Here is the analysis of the test runs with the 2nd DSSD (gen2) using the quick_si_plots.c script attached.

All 32 Si channels are working with acceptable performance. 
Entry  Wed Jun 2 09:14:04 2021, Jan, General, Telegram Chat Export, 2021 E127_TelegramChat.pdfE127_TelegramChat_json.zip
Attached is the exported Telegram chat.
There is the simple PDF and the zip-file containing the chat in json-format as well as all media files.
Entry  Sun Mar 22 01:36:14 2020, Pierre-Michel, Analysis, Target overlap,  10x
Here are the data file for the rates of the recoil detector for different values of the target bump. The average rate over background is proportional to
the target overlap. 
Entry  Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,  IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg
From the previous settings:
JetOn
  mashine number 11
Entry  Sat Mar 21 10:20:27 2020, Ragan, Alex, General, Target LN2,  
The LN2 Dewar on the ESR roof has been refilled.
Entry  Fri Mar 20 01:11:58 2020, Laszlo, General, Target - beam jntersection,  IMG_20200320_011008.jpg
We have managed to find the target position with the beam by looking at the xray spectra. The trick was that at 10mev we 
only have a low increase in the xray rates, so.we went for 400Mev/u where the rate change was dramatic (see in the 
picture)
ELOG V3.1.5-fc6679b