HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 28 of 29  Not logged in ELOG logo
Entry  Wed May 26 15:30:03 2021, Ragan, Thanassis, General, Changing the beam energy , 2021 
The ESR team is changing the beam energy to 6 MeV/u.
Entry  Thu May 6 11:03:46 2021, Jan Glorius, DAQ, Cabling Documentation, 2021 e127b_cabling_docu_06_05_2021_.pdfe127b_2021_cabling_documentation.xlsx
 
Entry  Sun May 16 13:31:49 2021, Laszlo, DAQ, Cabling Documentation, 2021 e127b_2021_cabling_documentation.xlsx
Si HV and current was switched in the last documentation.
Entry  Fri Jun 28 14:06:28 2019, Jan, General, CAD of (p,g) setup,  
 
Entry  Tue May 18 21:08:16 2021, ESR team, General, Beam stacking, 2021 5B6943AF-DF56-4B0F-A77E-1E3C65B3B0C0.jpegB590F232-450A-4ACF-BBA4-DB31B7B35FDA.jpeg
Beam stacking. 3 pulses, stochastically cooled and stacked on an inner orbit
Entry  Tue Jun 8 15:06:17 2021, Shahab, Analysis, Beam lifetime, 2021 pgamma_lifetime.001.pngpgamma_lifetime.002.png
measured beam lifetime after the second deceleration using parallel plate Schottky detector and the RSA5103 spectrum analyser. Analysis code can be found
here:
Entry  Wed May 19 19:47:14 2021, Yuri, General, Beam Halflife at 30 AMeV, 2021 2021-05-19_17-35-00_tcl1032_lassie-monitor.png
 
Entry  Tue May 25 17:12:59 2021, Robert/Shahab, Accelerator, Beam, 2021 
Beam is back; It is now being optimized
Entry  Mon Mar 23 14:23:01 2020, Pierre-Michel, DAQ, Backup recoil files,  
Recoil detector files backup to lxg1260:/data.local2/hillenbrand/Laszlo
Entry  Wed Feb 6 10:04:23 2019, Laszlo Varga, Simulations, Background subtraction for 124Xe, 109In, 73As made by MOCADI,  template.pdf
General remarks to the MOCADI simulations:

 scraper size vertically > (p,g) spot at the scraping position --> (p,g) can be separated
by truncating the
backscattered Rutherford events in the energy.

 replacing the atomic masses to nuclear masses does not change significantly the absolute positions of the
(p,g) and the Rutherford.
Entry  Fri Mar 20 22:26:42 2020, Jan, Detectors, BaF2 deactivated,  
BaF2 detectors are deactivated nor for the following runs.
Entry  Tue Feb 11 13:20:01 2020, Jan, Detectors, BaF2 - HV settings,  BaF2_HV_settings.pngbaf_bg_ch1.png
with these HV values the 6 channels are roughly gain matched, such that the 7.83 MeV Po-decay is around channel 5000.
Entry  Fri Mar 20 16:54:53 2020, Jan, DAQ, BaF OFF downscaled red=32,  
I introduced a downscaling by a factor of 2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable x-ray counts (K-alpha, K-REC) outside target ON phase.
So i want to minimize our deadtime during target OFF, to be able to use the data efficiently if needed.
Entry  Wed Mar 31 13:52:04 2021, Jan, Detectors, BaF Na22 Testing, 2021 
On 30. and 31.03.2021 we did some testing with the 6 BaF detectors.

Trigger & threshold:
Entry  Wed Mar 31 13:57:27 2021, Jan, Detectors, BaF HV settings, 2021 
The setting below is a start value for final gain matching with a full ADC range of 12MeV:

[TABLE border="1"]
Entry  Wed Apr 14 09:42:50 2021, Jan, Detectors, BaF HV gain matching, 2021 BaF_Na22_gain_match_v1.pngbaf_gain_match_v1.dat
The preliminary gain matching settings for a full ADC range of ~12MeV:

[TABLE border="1"]
Entry  Fri May 28 14:14:31 2021, Laszlo, General, Alvarez failure at 10:30 28:05:2021, 2021 
 
Entry  Sun May 23 15:36:10 2021, Rui-Jiu Chen& Alex, General, All shifts until Monday morning (24th May) have been cancelled. , 2021 
All shifts until Monday morning (24th May) have been cancelled. 
Next update on further situation (in particular concerning the morning shift on Monday) will be given tonight .
Entry  Sun Mar 22 13:33:19 2020, Laszlo, General, 2nd storage of MCP data,  
I made a backup for the MCP data on my own GSI laptop. Looking for better solution...
the original "fresh" files stored at litv-exp@lxg1299:/data.local2/hillenbrand/Laszlo/
Entry  Mon Apr 6 04:39:19 2020, Laszlo, Calibration, 2. Xray energy calibration,  9x
30angle:  E[keV] = 0.015898 *ch-1.91
90angle:  E[keV] = 0.0211075*ch-2.39
145angle: E[keV] = 0.01663  *ch-1.758
ELOG V3.1.5-fc6679b