HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 16 of 29  Not logged in ELOG logo
Entry  Wed Feb 6 10:16:09 2019, Laszlo Varga, General, Study on scraping,  1-s2.0-0168583X88900122-main.pdf
A publication on scraping systems suggested by Siegbert. 
In the study they have used cylindrical "high-quality" slits. "High-quality" stands for well polished surface
with surface roughness <50nm. The material of the slit is Tungsten Carbide. 
Entry  Fri May 21 15:20:54 2021, Rui-Jiu Chen, Runs, Stop DAQ, 2021 
Sergey is optimizing beam cycle. 
Entry  Thu Mar 19 09:43:28 2020, Laszlo, General, Status of the ESR,  
After two days of tuning the beam, yesterday evening (~8pm), it was found out that within one ESR pattern using the new control system the harmonics of the cavities cannot be changed. This gives us a fatal limitation, that we cannot go lower 
than 10MeV/u with the beam energy.
-As a first attempt we try to reach this 10MeV/u with two steps deceleration (first to 30MeV/u). At this 10MeV/u we have the p,n channel opened as well, which based on TALYS gives significant, weird shaped background in the spot of the p,g 
peak both in xy and xE histos.
-A second option would be that we inject the beam to ESR roughly at 330MeV/u. Then we can decelerate until 5MeV/u, but there is no stochastic, neither e-cooling available. This result to a "hot" decelerated beam with intensity factor 5 less 
(in optimistic scenario). But for this the whole tuning phase (the first two days of the beam time) must be remade, we have to start basically from scratch. 




It is "funny" that we have a very limited 5 days of beam time which is spent estimately >99% with, from the physics point of view, completely useless beam manipulation issues, which in a normal world must be done already in the engineering 
beam time... 
It is quite challenging to stay positive at the current status (not positive in the sense of the growing Corona-virus). 
Entry  Mon May 24 17:23:41 2021, Pierre-Michel, Enis, General, Status of gas-target cooling, 2021 
Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status 6"

At 18:16 "unkown status 0"
At 18:21 "ok"

At 19:26 "unknown status 0"
At 19:31 "ok"
Entry  Tue Mar 24 10:59:18 2020, Jan, Calibration, Sources - Specifications,  Pb-210-1.pdf241Am_Uwe.pdf133Ba_low.pdf133Ba_hi.pdf
We used the following sources:

Am241 (OM666) [GSI - Uwe]
Reference Activity: 430 kBq
Uncertainty: 3%
Reference Date: 19.09.2006

Ba133 hi (AN-5868) [GSI - Kozuharov]
Reference Activity: 438 kBq
Uncertainty: 3%
Reference Date: 01.06.2019

Ba133 low (OL 918) [GSI - Angela]
Reference Activity: 39.7 kBq
Uncertainty: 3%
Reference Date: 08.09.2006

Pb210 (2015-1552) [GUF - Rene]
Reference Activity: 7.42 (15) kBq
Uncertainty: 0.15/7.42 = 2%
Reference Date: 01.01.2016
Entry  Tue Jul 9 15:26:59 2019, Yuanming Xing, Simulations, Simulated Rutherford scattering distribution on detector,  6MeV.png7MeV.png8MeV.png
Simulated Rutherford scattering distribution on detector

   Beam: 111Sn
   Luminosity: 3.08 /mb/s
   
   Distance between the detector and central orbit: 2.80cm

   Particle Number in the simulation: 5 Million

   Beam quality used in MOCADI input file:
4,
0.27386, 0.182573, 0, -4.0, 0
4,
0.131477, 0.383186, 0, 0.0,  0
1,
0.02, 0, 0, 0.0, 0


1. Beam Energy: 6MeV/u
   
2. Beam Energy: 7MeV/u 

3. Beam Energy: 8MeV/u 
Entry  Sun Mar 22 17:47:27 2020, Laszlo, , Si, Xrays target density spectra during 118Te afternoon measurement,  End_of_118Te_runs.pngtarget_density_during_118Te_afternoon_runs.png
We got 30 counts out of this afternoon 118Te run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.

Now i can see peaks both at the 35 and 90 angle Xray spectra but not much on the 145 one.
At the end the target density stayed at 8.6E13.
Entry  Sat May 22 17:13:48 2021, Laszlo, Detectors, Si position changed, 2021 
Si was moved from -25 mm to -19 mm before run 0072.
Entry  Sun Mar 22 19:15:03 2020, Laszlo, , Si moved out of the ring, high voltage is switched off,  
 
Entry  Fri Feb 21 11:29:02 2020, Laszlo, General, Shift plan,  
https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0
Entry  Fri Mar 20 01:22:23 2020, Shahab, Runs, Setting for Gas target,  IMG_20200320_012048.jpg
Setting for the machines.
Entry  Sat May 22 17:15:26 2021, Laszlo, General, Scraper position, 2021 
We found the beam axis with the scraper to be -17.5 mm.
The Scraper position set to +12.5 mm, 30 mm relative from the beam.
Entry  Mon Mar 23 11:32:42 2020, Laszlo, General, SIS went down again,  
run101 is stopped
Entry  Mon Mar 23 09:33:11 2020, Laszlo, General, SIS failure again!,  
run096 is stopped
Entry  Mon Mar 23 00:13:25 2020, Laszlo, General, SIS and ESR beam currents,  2020-03-23_00-09-48-737.png2020-03-23_00-21-43-581.png
 
Entry  Sun May 30 00:14:58 2021, Oliver, Diego, General, SIS Pattern changed, 2021 
The pattern in SIS was changed so that we get more injections into ESR. Before HTD had 9 seconds which resulted in a timeout in the ESR. Now HTD has 10 seconds which improved a lot...
Entry  Mon Mar 23 03:07:11 2020, Shahab, Runs, SIS Kicker problem,  IMG_20200323_021051.jpg
After calling ESR on-call duty (M. Steck) he confirmed that the ESR is fine and suspected the SIS kicker modules.

SIS operators then checked and could confirm that module 5 is out of order and module 4 sometimes works sometimes not.

They asked me I said better to run as good as possible with lower number of modules until the end of experiment, then later change the module. because otherwise changing module might take time.

they tried to increase the kick angle to check if they can move the spot to the center.

some shots went well but mostly failed.

they decided to call the Rufbereitschaft.

meanwhile I started the run number 93 to at least collect some data from some of the correct shots.

if counts are too high I will stop it.

let's see.
Entry  Mon Mar 23 05:59:01 2020, Shahab, Runs, SIS Kicker ,  
SIS Kicker seems to be working properly. but we have to see how regularly it will work.
Entry  Fri May 21 11:55:24 2021, Jan, Detectors, SI MSCF settings v1, 2021 setting_test.1621590878
attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not BaF!
Entry  Sat Mar 21 15:26:49 2020, Laszlo, General, SCRAPER is ON use again,  
Yuri puts back the scraper (Egelhof 1 - GE01DD1IG) into position = +19. (where it was in the evening)
ELOG V3.1.5-fc6679b