IDdown Date Author Category Subject Year
  214   Mon Mar 23 01:18:16 2020 ShahabRunsrun entry - run092 
Taking data again with primary beam.

open file : run092

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run092_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 01:16

ON Rates
Si_X:      2 Hz
Si_Y:      2 Hz
Xray_35:   0 Hz
Xray_90:   92 Hz
Xray_145:  36 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.12 uA


SIS particles before:           7.6e8
ESR current at injection:      
ESR particles after decel.:     2.3e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
  213   Mon Mar 23 01:17:26 2020 ShahabGeneralLife time measurements using Schottky 
Did Schottky measurements using 5 shots with and without gas target each
restarting the DAQ
  212   Mon Mar 23 00:39:52 2020 ShahabGeneralRamping cycle picture and data 
Complete ramping cycle recorded from Oscilloscope Tektronix MSOX2024A.
 Stored as XLS file.
  211   Mon Mar 23 00:36:51 2020 ShahabRunsrun entry - run091 
Taking data again with primary beam.

open file : run091

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run091_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 00:36

ON Rates
Si_X:      3 Hz
Si_Y:      3 Hz
Xray_35:   1 Hz
Xray_90:   57 Hz
Xray_145:  16 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.25 uA


SIS particles before:           7e8
ESR current at injection:      
ESR particles after decel.:     8.5e6
Target ON density:              5e13

copy and repeat the above (below the line) every 30 minutes
  210   Mon Mar 23 00:13:25 2020 LaszloGeneralSIS and ESR beam currents 
  209   Sun Mar 22 23:59:12 2020 ShahabRunsrun entry - run091 
Taking data again with primary beam.

open file : run090

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run091_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 23:57:53

ON Rates
Si_X:      1 Hz
Si_Y:      1 Hz
Xray_35:   5 Hz
Xray_90:   102 Hz
Xray_145:  35 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.23 uA


SIS particles before:           4.6e8
ESR current at injection:      
ESR particles after decel.:     1.12e7
Target ON density:              5e13

copy and repeat the above (below the line) every 30 minutes
  208   Sun Mar 22 23:19:23 2020 MichaelGeneralESR Vacuum readings 
  207   Sun Mar 22 22:46:56 2020 Michael, Laszlo, YuriRunsrun entry - run090 
Taking data again with primary beam.

open file : run090

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run087_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 23:10 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   83 Hz
Xray_145:  14 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           ~2e8
ESR current at injection:       297 uA
ESR particles after decel.:     
Target ON density:              6.1e13

copy and repeat the above (below the line) every 30 minutes
  206   Sun Mar 22 22:06:21 2020 Michael, Laszlo, YuriRunsrun entry - run089 - stopped 
closed file again.

Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.

open file : run089

beam: 124Xe54+ (?)
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:00:26 , first file: run089_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 22:02 pm.

ON Rates
Si_X:        Hz
Si_Y:        Hz
Xray_35:     Hz
Xray_90:     Hz
Xray_145:    Hz
BaF_OR:      Hz

Si voltage:          off  
Si leakage current:  off

SIS particles before:           ~3.05e8
ESR current at injection:        380 uA
ESR particles after decel.:     
Target ON density:              

copy and repeat the above (below the line) every 30 minutes
  205   Sun Mar 22 22:00:49 2020 Michael, Laszlo, YuriRunsrun entry - run089 - switched to Primary beam 
Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.

open file : run089

beam: 124Xe54+ (?)
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:00:26 , first file: run089_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 22:02 pm.

ON Rates
Si_X:        Hz
Si_Y:        Hz
Xray_35:     Hz
Xray_90:     Hz
Xray_145:    Hz
BaF_OR:      Hz

Si voltage:          off  
Si leakage current:  off

SIS particles before:           ~3.05e8
ESR current at injection:        380 uA
ESR particles after decel.:     
Target ON density:              

copy and repeat the above (below the line) every 30 minutes
  204   Sun Mar 22 19:49:12 2020 Michael, Laszlo, Yuri Yuri is still tuning FRS 
We filled the Xray detectors.
Yuri is sill tuning FRS for primary beam.
  203   Sun Mar 22 19:15:03 2020 Laszlo Si moved out of the ring, high voltage is switched off 
  202   Sun Mar 22 18:41:50 2020 Michael, LaszloRunsrun entry - run088 
Closed file run088 at 17:55. No beam in ESR.
  201   Sun Mar 22 18:35:43 2020 Laszlo target dropped aagain 
there was a drop again from 8.6e13 to 7e13 in the target density
  200   Sun Mar 22 17:49:28 2020 Michael, LaszloRunsrun entry - run088 
The beam is still unchanged. We just start a run to collect all remaining data.
Data is probably scratch, expect changing conditions at the machines during the run.

No counts in Target ON phase at Silicon Detector. Probably we had only two first shoots from FRS in this run (see picture below)

open file : run088

beam: 118Te52+ (?)
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 17:48:58 , first file: run088_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 17:53 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    54 Hz
Xray_145:   28 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.3e9
ESR current at injection:        6.5 uA
ESR particles after decel.:     
Target ON density:              8.45e13

copy and repeat the above (below the line) every 30 minutes
  199   Sun Mar 22 17:47:27 2020 Laszlo Si, Xrays target density spectra during 118Te afternoon measurement 
We got 30 counts out of this afternoon 118Te run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.

Now i can see peaks both at the 35 and 90 angle Xray spectra but not much on the 145 one.
At the end the target density stayed at 8.6E13.
  198   Sun Mar 22 17:45:07 2020 LaszloGeneralswitching to primary beam 
We have finished the measurement with the fragments.

Now Yury will setup up a primary beam through the FRS, but without target in FRS.
We are hoping for increased intensity and stable gas target.
The plan is to make a measurement with and without the scraper in order to see the effect of scraping the Rutherford scattering.
  197   Sun Mar 22 17:35:39 2020 MichaelRunsrun entry - run087.  
Closing file at 17:39, stopping data taking. Yuri will switch to primary beam through FRS without target.

Also a minor observation is, that at the end of the target on phase, the X-ray count rate is going up very high. (Data acquisition was in Jet Off mode)

close file : run087

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 16:38 , first file: run087_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 17:35 pm. (This is towards the end of the run 087)

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    35 Hz
Xray_145:   21 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~2.39e9
ESR current at injection:        10 uA
ESR particles after decel.:     
Target ON density:              8.61e13

copy and repeat the above (below the line) every 30 minutes
  196   Sun Mar 22 17:09:49 2020 MichaelRunsrun entry - run087 
open file : run087

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 16:38 , first file: run087_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 17:10 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    35 Hz
Xray_145:   21 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~2.38e9
ESR current at injection:        8.9 uA
ESR particles after decel.:     
Target ON density:              8.58e13

copy and repeat the above (below the line) every 30 minutes
  195   Sun Mar 22 16:39:37 2020 MichaelRunsrun entry - run087 
Four shots at the end of 086/beginning of 87 were empty, no SIS kicker. Beam operators fixed it quickly.

open file : run087

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 16:38 , first file: run087_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 16:42 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    1 Hz
Xray_90:    52 Hz
Xray_145:   16 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.3e9
ESR current at injection:        8.4 uA
ESR particles after decel.:     
Target ON density:              8.7e13

copy and repeat the above (below the line) every 30 minutes