Sat Mar 21 21:41:29 2020, Sergiy,Ruijiu , Runs, run entry - run067,
|
open file : run067
beam: 118Te52+
|
Sat Mar 21 22:57:28 2020, Laszlo, Jan, DAQ, changing cables of the Xray 90 and 145,
|
Energy signals of 90 and 145 degree detector have been checked and exchanged
They were connected to the wrong ADC channel.
|
Sat Mar 21 22:59:09 2020, Sergiy,Ruijiu , Runs, run entry - run068,
|
open file : run068
beam: 118Te52+
|
Sat Mar 21 23:07:00 2020, Laszlo, General, 1672. MCP file was (recoils) was not closed,
|
1672. MCP file was (recoils) was not closed when we refilled the Xrays and did the cable change of 90 and 145 xrays
These stored in lxg1299 local disk |
Sat Mar 21 23:12:38 2020, Jan, Detectors, removed BaF detectors,
|
After run 67 and before run 68, the BaF detectors have been removed in order to reduce the Compton background in the x-ray detectors. |
Sat Mar 21 23:19:14 2020, Jan, Analysis, 118Te52+ on H2-target - Xray spectrum 90 degree,
|
The attached spectrum is for the 90 degree X-ray detector taken for about 3 hours with 118Te52+.
We see two peaks at ~29 keV (K-alpha) and 44 keV (K-REC).
|
Sat Mar 21 23:24:09 2020, Dima, Pierre, Runs, run entry - run068,
|
open file : run068
beam: 118Te52+
|
Sat Mar 21 23:54:36 2020, Dima, Pierre, Runs, run entry - run069,
|
open file : run069
beam: 118Te52+
|
Sun Mar 22 00:24:39 2020, Dima, Pierre, Runs, run entry - run069,
|
open file : run069
beam: 118Te52+
|
Sun Mar 22 00:55:00 2020, Dima, Pierre, Runs, run entry - run070,
|
open file : run070
beam: 118Te52+
|
Sun Mar 22 01:25:02 2020, Dima, Pierre, Runs, run entry - run070,
|
open file : run070
beam: 118Te52+
|
Sun Mar 22 01:36:14 2020, Pierre-Michel, Analysis, Target overlap, 10x
|
Here are the data file for the rates of the recoil detector for different values of the target bump. The average rate over background is proportional to
the target overlap.
|
Sun Mar 22 01:54:49 2020, Dima, Pierre, Runs, run entry - run071,
|
open file : run071
beam: 118Te52+
|
Sun Mar 22 02:24:07 2020, Dima, Pierre, Runs, run entry - run071,
|
open file : run071
beam: 118Te52+
|
Sun Mar 22 02:55:35 2020, Dima, Pierre, Runs, run entry - run072,
|
open file : run072
beam: 118Te52+
|
Sun Mar 22 03:24:39 2020, Dima, Pierre, Runs, run entry - run072,
|
open file : run072
beam: 118Te52+
|
Sun Mar 22 03:54:24 2020, Dima, Pierre, Runs, run entry - run073,
|
open file : run073
beam: 118Te52+
|
Sun Mar 22 04:31:45 2020, Dima, Pierre, Runs, run entry - run073,
|
open file : run073
beam: 118Te52+
|
Sun Mar 22 04:57:44 2020, Dima, Pierre, Runs, run entry - run074,
|
open file : run074
beam: 118Te52+
|
Sun Mar 22 05:26:47 2020, Dima, Pierre, Runs, run entry - run074,
|
open file : run074
beam: 118Te52+
|
|