Entry  Sat Mar 21 21:41:29 2020, Sergiy,Ruijiu , Runs, run entry - run067,  
open file : run067

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 20:41 , first file: run067_0001.lmd
run stop  at 21:40 , last file:  run066_0xxx.lmd

_______________________________________________________________________________

time: 21:12 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   29 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.08 uA


SIS particles before:           ~2.5e9
ESR particles at injection:     n.n.
ESR particles after decel.:     
Target ON density:              6.e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sat Mar 21 22:57:28 2020, Laszlo, Jan, DAQ, changing cables of the Xray 90 and 145,  
Energy signals of 90 and 145 degree detector have been checked and exchanged
They were connected to the wrong ADC channel.

Now 
E_Xray2 and t_Xray2 should belong to 90 degree
E_Xray3 and t_Xray3 belong to 145 degree
Entry  Sat Mar 21 22:59:09 2020, Sergiy,Ruijiu , Runs, run entry - run068,  
open file : run068

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:54 , first file: run068_0001.lmd
run stop  at : , last file:  run067_0xxx.lmd

_______________________________________________________________________________

time: 22:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   48 Hz
Xray_145:  17 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.06 uA


SIS particles before:           ~3.0e9
ESR particles at injection:     n.n.
ESR particles after decel.:     
Target ON density:              5.23e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sat Mar 21 23:07:00 2020, Laszlo, General, 1672. MCP file was (recoils) was not closed,  
1672. MCP file was  (recoils) was not closed when we refilled the Xrays and did the cable change of 90 and 145 xrays
These stored in lxg1299 local disk
Entry  Sat Mar 21 23:12:38 2020, Jan, Detectors, removed BaF detectors,  
After run 67 and before run 68, the BaF detectors have been removed in order to reduce the Compton background in the x-ray detectors.
Entry  Sat Mar 21 23:19:14 2020, Jan, Analysis, 118Te52+ on H2-target - Xray spectrum 90 degree,  90_deg_118Te_runs64to66.png
The attached spectrum is for the 90 degree X-ray detector taken for about 3 hours with 118Te52+.
We see two peaks at ~29 keV (K-alpha) and 44 keV (K-REC).

The resolution is about 1.5 keV, and the signal-to-background ratio is also really bad.

The increase of background events at higher E might be induced by Compton scattering of a high E gamma ray from the BaF detectors, which are active and sit close by (not anymore).
Entry  Sat Mar 21 23:24:09 2020, Dima, Pierre, Runs, run entry - run068,  
open file : run068

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:54 , first file: run068_0001.lmd
run stop  at : , last file:  run067_0xxx.lmd

_______________________________________________________________________________

time: 23:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   53 Hz
Xray_145:  16 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.3e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.41e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sat Mar 21 23:54:36 2020, Dima, Pierre, Runs, run entry - run069,  
open file : run069

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 23:54 , first file: run069_0001.lmd
run stop  at : , last file:  run068_0xxx.lmd

_______________________________________________________________________________

time: 23:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   65 Hz
Xray_145:  23 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.10 uA


SIS particles before:           ~2.3e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.37e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 00:24:39 2020, Dima, Pierre, Runs, run entry - run069,  
open file : run069

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 23:54 , first file: run069_0001.lmd
run stop  at : , last file:  run068_0xxx.lmd

_______________________________________________________________________________

time: 23:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   56 Hz
Xray_145:  26 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.10 uA


SIS particles before:           ~2.2e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.36e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 00:55:00 2020, Dima, Pierre, Runs, run entry - run070,  
open file : run070

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 00:54 , first file: run070_0001.lmd
run stop  at : , last file:  run069_0xxx.lmd

_______________________________________________________________________________

time: 00:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   70 Hz
Xray_145:  15 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.6e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.6e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 01:25:02 2020, Dima, Pierre, Runs, run entry - run070,  
open file : run070

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 00:54 , first file: run070_0001.lmd
run stop  at : , last file:  run069_0xxx.lmd

_______________________________________________________________________________

time: 01:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   3 Hz
Xray_90:   48 Hz
Xray_145:  24 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.6e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.71e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 01:36:14 2020, Pierre-Michel, Analysis, Target overlap,  10x
Here are the data file for the rates of the recoil detector for different values of the target bump. The average rate over background is proportional to the target overlap. 

The MCP was operated at a voltage of 2500 V, where it sees mostly photons, so not really recoil ions.

Column "X" is time in seconds, Column "Content" is rate in Hz.
Entry  Sun Mar 22 01:54:49 2020, Dima, Pierre, Runs, run entry - run071,  
open file : run071

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 01:54 , first file: run071_0001.lmd
run stop  at : , last file:  run070_0xxx.lmd

_______________________________________________________________________________

time: 01:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   57 Hz
Xray_145:  22 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.4e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 02:24:07 2020, Dima, Pierre, Runs, run entry - run071,  
open file : run071

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 01:54 , first file: run071_0001.lmd
run stop  at : , last file:  run070_0xxx.lmd

_______________________________________________________________________________

time: 02:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   5 Hz
Xray_90:   63 Hz
Xray_145:  18 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.9e9
ESR current at injection:       20 uA
ESR particles after decel.:     
Target ON density:              5.3e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 02:55:35 2020, Dima, Pierre, Runs, run entry - run072,  
open file : run072

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 02:54 , first file: run072_0001.lmd
run stop  at : , last file:  run071_0xxx.lmd

_______________________________________________________________________________

time: 02:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   46 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.16 uA


SIS particles before:           ~1.75e9
ESR current at injection:       20 uA
ESR particles after decel.:     
Target ON density:              4e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 03:24:39 2020, Dima, Pierre, Runs, run entry - run072,  
open file : run072

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 02:54 , first file: run072_0001.lmd
run stop  at : , last file:  run071_0xxx.lmd

_______________________________________________________________________________

time: 03:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   48 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.6e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 03:54:24 2020, Dima, Pierre, Runs, run entry - run073,  
open file : run073

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 03:54 , first file: run073_0001.lmd
run stop  at : , last file:  run072_0xxx.lmd

_______________________________________________________________________________

time: 03:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   53 Hz
Xray_145:  19 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.6e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 04:31:45 2020, Dima, Pierre, Runs, run entry - run073,  
open file : run073

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 03:54 , first file: run073_0001.lmd
run stop  at : , last file:  run072_0xxx.lmd

_______________________________________________________________________________

time: 04:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   54 Hz
Xray_145:  20 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.06 uA


SIS particles before:           ~1.7e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.8e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 04:57:44 2020, Dima, Pierre, Runs, run entry - run074,  
open file : run074

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 04:57 , first file: run074_0001.lmd
run stop  at : , last file:  run073_0xxx.lmd

_______________________________________________________________________________

time: 04:57 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   64 Hz
Xray_145:  28 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.7e9
ESR current at injection:       22 uA
ESR particles after decel.:     
Target ON density:              3.8e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 05:26:47 2020, Dima, Pierre, Runs, run entry - run074,  
open file : run074

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 04:57 , first file: run074_0001.lmd
run stop  at : , last file:  run073_0xxx.lmd

_______________________________________________________________________________

time: 05:25 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   70 Hz
Xray_145:  17 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~1.9e9
ESR current at injection:       22 uA
ESR particles after decel.:     
Target ON density:              3.7e13


copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b