ID Date Author Category Subjectdown Year Text Attachments
  219   Mon Mar 23 03:53:41 2020 ShahabRunsReduced intensity inspite of faulty kicker SIS Kicker is still faulty. but we managed
to reduce again the intensity to around 2e6
particles in ring to reduce scattering on
  
  138   Sat Mar 21 17:34:10 2020 SergiyGeneralRecoils 
We started recording the data from the recoils
using the MCP from Pierre-Michael's experiment.
  
  129   Sat Mar 21 13:44:16 2020 Pierre-MichelDetectorsRecoil detector We turn on Recoil detector, to use it as a
monitor for target overlap.
 Recoil.pdf 
  212   Mon Mar 23 00:39:52 2020 ShahabGeneralRamping cycle picture and data Complete ramping cycle recorded from Oscilloscope
Tektronix MSOX2024A.
 Stored as XLS file.
 2020-03-23_machine_cycle_ramping.bmp2020-03-23_machine_cycle_ramping.xlsx 
  450   Tue May 25 18:46:04 2021 Robert/ShahabAcceleratorQuadrupoles down2021All quadrupoles went off, waiting for the
on-call service
  
  11   Fri Jun 7 14:39:36 2019 JanDetectorsPt100 installation & readout The new detector holder incorporates a Pt100
temperature sensor, which is UHV compatible.
The Pt-resistor is read out via 4 wires.
 det_connector.pngPt100_readout.JPG 
  1   Thu Sep 13 11:42:33 2018 Jan GloriusCollaborationProposal Attached is the beam time proposal submitted
and accepted by the G-PAC in 2017.    
 E127_Reifarth_pg.pdfE127_Approval.pdf 
  224   Mon Mar 23 06:20:06 2020 ShahabRunsPosition on scintillator corrected sitll no beam in ESR position on the scintillator was corrected
by the OPs to center, but beam is still not
in ESR.
 IMG_20200323_061337.jpg 
  265   Tue Mar 24 10:20:26 2020 LaszloCalibrationPictures of the xray calibration    IMG_20200324_101357.jpgIMG_20200324_101303.jpgIMG_20200324_101334.jpgIMG_20200324_100725.jpg 
  474   Wed May 26 18:37:34 2021 Ragan, ThanassisGeneralOptimization target bump/overlapp2021| bump position | X ray bdt ON | Si rate ON
|
---------------------------------------------
  
  490   Thu May 27 08:26:15 2021 Yuri, BeatrizGeneralOptimisation beam position on target and scraper position2021Optimised overlap with the target by shifting
the beam from -11.5 to 12.8 mm. This lead
to an increase of the DSSSD rate of a factor
  
  447   Tue May 25 13:49:51 2021 Oliver, Diego, JanGeneralNo Beam2021No beam from 13:49:00 until    
  552   Sat May 29 23:05:52 2021 Oliver, DiegoGeneralNo Beam2021Due to a radioprotection issue in CaveA there
is no beam. We wait for the radioprotection
shift to arrive...
  
  414   Mon May 24 06:30:42 2021 RaganDAQNTCAP2021NTCAP started for recording Schottky data

SC_2021-05-24_06-29-31
  
  2   Thu Jan 17 08:45:43 2019 JanDetectorsMicron W1 DSSSD - technical information Attached are the spec sheets and design drawings
of the new DSSSDs from Micron.
Additionally, the 3D model made by Laszlo
 6x 
  119   Sat Mar 21 11:30:04 2020 LaszloGeneralMWPC movement now we try to move the capture detector (MWPC
in the 1. dipol before our Si setup) inside
the ring while the DAQ was ON
 MWPC_movement.png 
  14   Tue Jun 25 21:19:50 2019 LaszloSimulationsMOCADI input parameters initial BEAM input parameters for MOCADI are
based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in
 template.pdfsteck2004.pdf 
  128   Sat Mar 21 13:37:53 2020 Laszlo MCP can monitor target now with the MCP we can see clearly the effect
of the target :) (scintillation?)
so we want to scan through the target thickness
  
  452   Tue May 25 22:03:22 2021 Robert/ShahabRunsLifetime measurement2021Run 0118

Gas jet target has been turned off for lifetime
  
  185   Sun Mar 22 12:50:00 2020 ShahabRunsLife time of 10 MeV/u Tail of 118-Te-52+ The life time of 10 MeV/u Tail of cycle 118-Te-52+
was analyzed using Schottky peak intensity.
Schottky signal was taken from the parallel
 target_off.jpgtarget_on.jpg 