HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te, Page 26 of 29  Not logged in ELOG logo
ID Date Author Category Subject Yeardown Text Attachments
  208   Sun Mar 22 23:19:23 2020 MichaelGeneralESR Vacuum readings    ESR_Vakuum2020-03-22-2318.PNG 
  209   Sun Mar 22 23:59:12 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run090
  
  210   Mon Mar 23 00:13:25 2020 LaszloGeneralSIS and ESR beam currents    2020-03-23_00-09-48-737.png2020-03-23_00-21-43-581.png 
  211   Mon Mar 23 00:36:51 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run091
  
  212   Mon Mar 23 00:39:52 2020 ShahabGeneralRamping cycle picture and data Complete ramping cycle recorded from Oscilloscope
Tektronix MSOX2024A.
 Stored as XLS file.
 2020-03-23_machine_cycle_ramping.bmp2020-03-23_machine_cycle_ramping.xlsx 
  213   Mon Mar 23 01:17:26 2020 ShahabGeneralLife time measurements using Schottky Did Schottky measurements using 5 shots with
and without gas target each
restarting the DAQ
  
  214   Mon Mar 23 01:18:16 2020 ShahabRunsrun entry - run092 Taking data again with primary beam.

open file : run092
  
  215   Mon Mar 23 01:53:59 2020 ShahabRunsEmpty shots in ESR since about 01:40 AM, there is no beam in
ESR. .
stopped data acquisition
  
  216   Mon Mar 23 03:04:56 2020 ShahabRunsrun entry - run093 RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
  
  217   Mon Mar 23 03:07:11 2020 ShahabRunsSIS Kicker problem After calling ESR on-call duty (M. Steck)
he confirmed that the ESR is fine and suspected
the SIS kicker modules.
 IMG_20200323_021051.jpg 
  218   Mon Mar 23 03:38:01 2020 ShahabRunsrun entry - run093 RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
  
  219   Mon Mar 23 03:53:41 2020 ShahabRunsReduced intensity inspite of faulty kicker SIS Kicker is still faulty. but we managed
to reduce again the intensity to around 2e6
particles in ring to reduce scattering on
  
  220   Mon Mar 23 03:58:25 2020 ShahabGeneralKicker guy arrived Kicker Guy (U. Blell) arrived in order to
fix modules.
  
  221   Mon Mar 23 04:08:12 2020 ShahabRunsrun 93 stopped run 93 which was during faulty kicker was
stopped so that the kicker module can be
repaired.
  
  222   Mon Mar 23 05:55:24 2020 ShahabRunsKicker problem not solved yet no solution to kicker problem.    
  223   Mon Mar 23 05:59:01 2020 ShahabRunsSIS Kicker  SIS Kicker seems to be working properly. but
we have to see how regularly it will work.
  
  224   Mon Mar 23 06:20:06 2020 ShahabRunsPosition on scintillator corrected sitll no beam in ESR position on the scintillator was corrected
by the OPs to center, but beam is still not
in ESR.
 IMG_20200323_061337.jpg 
  225   Mon Mar 23 06:40:17 2020 ShahabRunsno beam in SIS nor in ESR manic Monday morning.   
  226   Mon Mar 23 06:49:46 2020 ShahabRunsESR kicker also has some problems     
  227   Mon Mar 23 07:56:51 2020 LaszloGeneralYuri made magick and we operate again DSSSD was moved out (HV switched off)
also the scraper was mistakenly moved.
  
ELOG V3.1.5-fc6679b