| ID | 
Date | 
Author  | 
Category | 
Subject | 
Year | 
| 
  184  
 | 
Sun Mar 22 12:26:15 2020 | 
Esther, Ragan | Runs | run entry - run082, Uli working with gas jet target |   | 
Uli is still working with gas jet target however the vacuum problem with the SIS is resolved now. 
open file : run082
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 12:25 , first file: run082_0001.lmd
run stop  at  , last file:  run_0xxx.lmd
_______________________________________________________________________________
time: 12:25 pm.
ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz
Si voltage:          60.01 V  
Si leakage current:  4.06 uA
SIS particles before:           ~3.3e9
ESR current at injection:        uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes  | 
| 
  187  
 | 
Sun Mar 22 13:22:44 2020 | 
Esther, Ragan | Runs | run entry - run083, Uli working with gas jet target |   | 
Uli is still working with gas jet target. 
open file : run083
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 13:25 , first file: run083_0001.lmd
run stop  at  , last file:  run_0xxx.lmd
_______________________________________________________________________________
time: 13:25 pm.
ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz
Si voltage:          60.01 V  
Si leakage current:  4.05 uA
SIS particles before:           ~2.5e9
ESR current at injection:        11 uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes  | 
| 
  190  
 | 
Sun Mar 22 14:40:14 2020 | 
Esther, Michael, Laszlo | Runs | run entry - run085, gas jet is back in business! |   | 
open file : run085
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 14:39 , first file: run085_0001.lmd
run stop  at  , last file:  run_0xxx.lmd
_______________________________________________________________________________
time: 14:40 pm.
ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    63 Hz
Xray_145:   30 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.05 uA
SIS particles before:           ~2.5e9
ESR current at injection:        9 uA
ESR particles after decel.:     
Target ON density:              1e14
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes  | 
| 
  173  
 | 
Sun Mar 22 08:22:57 2020 | 
Esther | Runs | run entry - run077 |   | 
open file : run077
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 07:54 , first file: run077_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd
_______________________________________________________________________________
time: 08:25 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   46 Hz
Xray_145:  24 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.08 uA
SIS particles before:           ~3.8e9
ESR current at injection:       11 uA
ESR particles after decel.:     
Target ON density:              1.6e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes  | 
| 
  174  
 | 
Sun Mar 22 08:52:45 2020 | 
Esther | Runs | run entry - run078 |   | 
open file : run078
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 08:55 , first file: run078_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd
_______________________________________________________________________________
time: 08:55 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   7 Hz
Xray_90:   46 Hz
Xray_145:  23 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.09 uA
SIS particles before:           ~2.1e9
ESR current at injection:       8 uA
ESR particles after decel.:     
Target ON density:              2.6e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes  | 
| 
  175  
 | 
Sun Mar 22 09:21:55 2020 | 
Esther | Runs | run entry - run078 |   | 
open file : run078
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 08:55 , first file: run078_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd
_______________________________________________________________________________
time: 09:23 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   58 Hz
Xray_145:  15 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.04 uA
SIS particles before:           ~2.2e9
ESR current at injection:       8 uA
ESR particles after decel.:     
Target ON density:              2.5e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes  | 
| 
  424  
 | 
Mon May 24 17:48:04 2021 | 
Erika | General | FRS shiftplan, name abbreviations and phone list | 2021 | 
FRS shift plan for this week: 
  
 
Name abbreviations: 
  
 
Phone numbers: 
  | 
| 
  350  
 | 
Tue May 18 21:08:16 2021 | 
ESR team | General | Beam stacking | 2021 | 
Beam stacking. 3 pulses, stochastically cooled and stacked on an inner orbit  | 
| Attachment 1: 5B6943AF-DF56-4B0F-A77E-1E3C65B3B0C0.jpeg
 | 
 
 | 
| Attachment 2: B590F232-450A-4ACF-BBA4-DB31B7B35FDA.jpeg
 | 
 
 | 
| 
  248  
 | 
Mon Mar 23 14:12:18 2020 | 
E127 team | Runs | run entry - run103, scrapper is inserted |   | 
open file : run103
Scrapper is inserted  | 
| 
  154  
 | 
Sat Mar 21 23:24:09 2020 | 
Dima, Pierre | Runs | run entry - run068 |   | 
open file : run068
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 22:54 , first file: run068_0001.lmd
run stop  at : , last file:  run067_0xxx.lmd
_______________________________________________________________________________
time: 23:24 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   53 Hz
Xray_145:  16 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.05 uA
SIS particles before:           ~2.3e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.41e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  155  
 | 
Sat Mar 21 23:54:36 2020 | 
Dima, Pierre | Runs | run entry - run069 |   | 
open file : run069
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 23:54 , first file: run069_0001.lmd
run stop  at : , last file:  run068_0xxx.lmd
_______________________________________________________________________________
time: 23:54 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   65 Hz
Xray_145:  23 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.10 uA
SIS particles before:           ~2.3e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.37e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  156  
 | 
Sun Mar 22 00:24:39 2020 | 
Dima, Pierre | Runs | run entry - run069 |   | 
open file : run069
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 23:54 , first file: run069_0001.lmd
run stop  at : , last file:  run068_0xxx.lmd
_______________________________________________________________________________
time: 23:54 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   56 Hz
Xray_145:  26 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.10 uA
SIS particles before:           ~2.2e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.36e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  157  
 | 
Sun Mar 22 00:55:00 2020 | 
Dima, Pierre | Runs | run entry - run070 |   | 
open file : run070
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 00:54 , first file: run070_0001.lmd
run stop  at : , last file:  run069_0xxx.lmd
_______________________________________________________________________________
time: 00:54 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   70 Hz
Xray_145:  15 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.08 uA
SIS particles before:           ~1.6e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.6e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  158  
 | 
Sun Mar 22 01:25:02 2020 | 
Dima, Pierre | Runs | run entry - run070 |   | 
open file : run070
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 00:54 , first file: run070_0001.lmd
run stop  at : , last file:  run069_0xxx.lmd
_______________________________________________________________________________
time: 01:24 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   3 Hz
Xray_90:   48 Hz
Xray_145:  24 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.08 uA
SIS particles before:           ~1.6e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.71e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  160  
 | 
Sun Mar 22 01:54:49 2020 | 
Dima, Pierre | Runs | run entry - run071 |   | 
open file : run071
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 01:54 , first file: run071_0001.lmd
run stop  at : , last file:  run070_0xxx.lmd
_______________________________________________________________________________
time: 01:54 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   57 Hz
Xray_145:  22 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.08 uA
SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.4e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  161  
 | 
Sun Mar 22 02:24:07 2020 | 
Dima, Pierre | Runs | run entry - run071 |   | 
open file : run071
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 01:54 , first file: run071_0001.lmd
run stop  at : , last file:  run070_0xxx.lmd
_______________________________________________________________________________
time: 02:24 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   5 Hz
Xray_90:   63 Hz
Xray_145:  18 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.08 uA
SIS particles before:           ~1.9e9
ESR current at injection:       20 uA
ESR particles after decel.:     
Target ON density:              5.3e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  162  
 | 
Sun Mar 22 02:55:35 2020 | 
Dima, Pierre | Runs | run entry - run072 |   | 
open file : run072
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 02:54 , first file: run072_0001.lmd
run stop  at : , last file:  run071_0xxx.lmd
_______________________________________________________________________________
time: 02:54 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   46 Hz
Xray_145:  25 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.16 uA
SIS particles before:           ~1.75e9
ESR current at injection:       20 uA
ESR particles after decel.:     
Target ON density:              4e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  163  
 | 
Sun Mar 22 03:24:39 2020 | 
Dima, Pierre | Runs | run entry - run072 |   | 
open file : run072
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 02:54 , first file: run072_0001.lmd
run stop  at : , last file:  run071_0xxx.lmd
_______________________________________________________________________________
time: 03:24 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   48 Hz
Xray_145:  25 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.09 uA
SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.6e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  164  
 | 
Sun Mar 22 03:54:24 2020 | 
Dima, Pierre | Runs | run entry - run073 |   | 
open file : run073
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 03:54 , first file: run073_0001.lmd
run stop  at : , last file:  run072_0xxx.lmd
_______________________________________________________________________________
time: 03:54 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   53 Hz
Xray_145:  19 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.09 uA
SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.6e13
copy and repeat the above (below the line) every 30 minutes  | 
| 
  165  
 | 
Sun Mar 22 04:31:45 2020 | 
Dima, Pierre | Runs | run entry - run073 |   | 
open file : run073
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 03:54 , first file: run073_0001.lmd
run stop  at : , last file:  run072_0xxx.lmd
_______________________________________________________________________________
time: 04:24 pm.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   54 Hz
Xray_145:  20 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.06 uA
SIS particles before:           ~1.7e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.8e13
copy and repeat the above (below the line) every 30 minutes  |