  216   Mon Mar 23 03:04:56 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:04

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    3 Hz
Xray_90:    34 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.18 uA


SIS particles before:           4.9e8
ESR current at injection:      
ESR particles after decel.:     8.7e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
  217   Mon Mar 23 03:07:11 2020 ShahabRunsSIS Kicker problem 
After calling ESR on-call duty (M. Steck) he confirmed that the ESR is fine and suspected the SIS kicker modules.

SIS operators then checked and could confirm that module 5 is out of order and module 4 sometimes works sometimes not.

They asked me I said better to run as good as possible with lower number of modules until the end of experiment, then later change the module. because otherwise changing module might take time.

they tried to increase the kick angle to check if they can move the spot to the center.

some shots went well but mostly failed.

they decided to call the Rufbereitschaft.

meanwhile I started the run number 93 to at least collect some data from some of the correct shots.

if counts are too high I will stop it.

let's see.
Attachment 1: IMG_20200323_021051.jpg
IMG_20200323_021051.jpg
  218   Mon Mar 23 03:38:01 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:36

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    1 Hz
Xray_90:    45 Hz
Xray_145:   19 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.29 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     8.64e6
Target ON density:              4.35e13

copy and repeat the above (below the line) every 30 minutes
  219   Mon Mar 23 03:53:41 2020 ShahabRunsReduced intensity inspite of faulty kicker 
SIS Kicker is still faulty. but we managed to reduce again the intensity to around 2e6 particles in ring to reduce scattering on scraper.
  220   Mon Mar 23 03:58:25 2020 ShahabGeneralKicker guy arrived 
Kicker Guy (U. Blell) arrived in order to fix modules.
  221   Mon Mar 23 04:08:12 2020 ShahabRunsrun 93 stopped 
run 93 which was during faulty kicker was stopped so that the kicker module can be repaired.
  222   Mon Mar 23 05:55:24 2020 ShahabRunsKicker problem not solved yet 
no solution to kicker problem. 
  223   Mon Mar 23 05:59:01 2020 ShahabRunsSIS Kicker  
SIS Kicker seems to be working properly. but we have to see how regularly it will work.
  224   Mon Mar 23 06:20:06 2020 ShahabRunsPosition on scintillator corrected sitll no beam in ESR 
position on the scintillator was corrected by the OPs to center, but beam is still not in ESR.
Attachment 1: IMG_20200323_061337.jpg
IMG_20200323_061337.jpg
  225   Mon Mar 23 06:40:17 2020 ShahabRunsno beam in SIS nor in ESR 
manic Monday morning.
  226   Mon Mar 23 06:49:46 2020 ShahabRunsESR kicker also has some problems 
  572   Tue Jun 8 15:06:17 2021 ShahabAnalysisBeam lifetime2021
measured beam lifetime after the second deceleration using parallel plate Schottky detector and the RSA5103 spectrum analyser. Analysis code can be found here:

https://github.com/xaratustrah/e127_scripts/

The plots here were produced using the script:

https://nbviewer.ipython.org/github/xaratustrah/e127_scripts/blob/main/lifetime_calculator.ipynb


UPDATE 2022-06-30:

Life times have been slightly corrected. Please see attachment.


Filename	Start Frame	Correct Lifetime [s]	Mean [s]
pgamma_lifetime-2021.05.25.21.56.37.593_on.tiq	29500	1.43	
pgamma_lifetime-2021.05.25.22.02.16.618_on.tiq	29500	1.55	1.49
pgamma_lifetime-2021.05.25.22.07.22.369_off.tiq	53500	1.75	
pgamma_lifetime-2021.05.25.22.13.24.787_off.tiq	34900	1.89	1.82
Attachment 1: pgamma_lifetime.001.png
pgamma_lifetime.001.png
Attachment 2: pgamma_lifetime.002.png
pgamma_lifetime.002.png
  228   Mon Mar 23 08:04:07 2020 Shahab, Laszlo,YuryRunsrun entry - run0942020
open file : run094

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

at the 3. shoot counting backwards from the end of this file the TARGET LEFT ON for the whole cycle --> got a burst of particles on the detector in 
Target ON Mode as well. --> CUT OUT THIS ONE 1min PHASE!

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:15, first file: run094_0001.lmd
run stop  at 08:17, last file:  run_094.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    5 Hz
Xray_90:    84 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA


SIS particles before:           2.5e8
ESR current at injection:       4.5e7
ESR particles after decel.:     1e7
Target ON density:              3.8e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: 2020-03-23_08-13-00-443.png
2020-03-23_08-13-00-443.png
  229   Mon Mar 23 08:20:31 2020 Shahab, Laszlo,YuryRunsrun entry - run095 
open file : run095

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:17, first file: run095_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    5 Hz
Xray_90:    84 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     ~8.64e6
Target ON density:              3.8e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: 2020-03-23_08-31-45-715.png
2020-03-23_08-31-45-715.png
  570   Mon May 31 14:38:33 2021 SophiaCalibrationRunlist for X-ray detector calibrations after the experiment2021
The by Jacobus Swartz created table in entry 335 extended by the calibration after the experiment.
Attachment 1: Kopie_von_E127_Runlist-calibrations-4-3-1.xlsx
  415   Mon May 24 11:12:38 2021 Sophia, MarioRunsRun 00902021
DAQ node 2 was not started!


open file : e127b_run0090.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 11:10:18 23.05.2021
run stop:
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  416   Mon May 24 11:25:46 2021 Sophia, MarioRunsRun 00912021
open file : e127b_run0091.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 11:25:08 25.05.2021
run stop: 12:26:31 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  417   Mon May 24 12:29:20 2021 Sophia, MarioRunsRun 00922021
20 stacks now

open file : e127b_run0092.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 12:28:57 24.05.2021
run stop: 13:13:56 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  418   Mon May 24 13:14:59 2021 Sophia, MarioRunsRun 00932021
No. of stacks: 5
length SC10: 2x 5.5s

open file : e127b_run0093.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 13:14:44 24.05.2021
run stop: 14:10:55 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  419   Mon May 24 14:12:14 2021 Sophia, MarioRunsRun 00942021
No. of stacks: 5
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -10 mm (before -20 mm)

open file : e127b_run0094.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 14:15:47 24.05.2021
run stop: 15:20:37 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14