216
|
Mon Mar 23 03:04:56 2020 |
Shahab | Runs | run entry - run093 | | RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
|
|
217
|
Mon Mar 23 03:07:11 2020 |
Shahab | Runs | SIS Kicker problem | | After calling ESR on-call duty (M. Steck)
he confirmed that the ESR is fine and suspected
the SIS kicker modules.
|
|
218
|
Mon Mar 23 03:38:01 2020 |
Shahab | Runs | run entry - run093 | | RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
|
|
219
|
Mon Mar 23 03:53:41 2020 |
Shahab | Runs | Reduced intensity inspite of faulty kicker | | SIS Kicker is still faulty. but we managed
to reduce again the intensity to around 2e6
particles in ring to reduce scattering on |
|
220
|
Mon Mar 23 03:58:25 2020 |
Shahab | General | Kicker guy arrived | | Kicker Guy (U. Blell) arrived in order to
fix modules. |
|
221
|
Mon Mar 23 04:08:12 2020 |
Shahab | Runs | run 93 stopped | | run 93 which was during faulty kicker was
stopped so that the kicker module can be
repaired. |
|
222
|
Mon Mar 23 05:55:24 2020 |
Shahab | Runs | Kicker problem not solved yet | | no solution to kicker problem. |
|
223
|
Mon Mar 23 05:59:01 2020 |
Shahab | Runs | SIS Kicker | | SIS Kicker seems to be working properly. but
we have to see how regularly it will work. |
|
224
|
Mon Mar 23 06:20:06 2020 |
Shahab | Runs | Position on scintillator corrected sitll no beam in ESR | | position on the scintillator was corrected
by the OPs to center, but beam is still not
in ESR. |
|
225
|
Mon Mar 23 06:40:17 2020 |
Shahab | Runs | no beam in SIS nor in ESR | | manic Monday morning. |
|
226
|
Mon Mar 23 06:49:46 2020 |
Shahab | Runs | ESR kicker also has some problems | | |
|
572
|
Tue Jun 8 15:06:17 2021 |
Shahab | Analysis | Beam lifetime | 2021 | measured beam lifetime after the second deceleration
using parallel plate Schottky detector and
the RSA5103 spectrum analyser. Analysis code |
|
228
|
Mon Mar 23 08:04:07 2020 |
Shahab, Laszlo,Yury | Runs | run entry - run094 | 2020 | open file : run094
beam: 124Xe54+
|
|
229
|
Mon Mar 23 08:20:31 2020 |
Shahab, Laszlo,Yury | Runs | run entry - run095 | | open file : run095
beam: 124Xe54+
|
|
570
|
Mon May 31 14:38:33 2021 |
Sophia | Calibration | Runlist for X-ray detector calibrations after the experiment | 2021 | The by Jacobus Swartz created table in entry
335 extended by the calibration after the
experiment. |
|
415
|
Mon May 24 11:12:38 2021 |
Sophia, Mario | Runs | Run 0090 | 2021 | DAQ node 2 was not started!
|
|
416
|
Mon May 24 11:25:46 2021 |
Sophia, Mario | Runs | Run 0091 | 2021 | open file : e127b_run0091.lmd
beam: 118Te52+
|
|
417
|
Mon May 24 12:29:20 2021 |
Sophia, Mario | Runs | Run 0092 | 2021 | 20 stacks now
open file : e127b_run0092.lmd
|
|
418
|
Mon May 24 13:14:59 2021 |
Sophia, Mario | Runs | Run 0093 | 2021 | No. of stacks: 5
length SC10: 2x 5.5s
|
|
419
|
Mon May 24 14:12:14 2021 |
Sophia, Mario | Runs | Run 0094 | 2021 | No. of stacks: 5
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -10 mm (before -20 |
|