HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 3 of 29  Not logged in ELOG logo
ID Date Authordown Category Subject Year
  69   Fri Mar 20 01:22:23 2020 ShahabRunsSetting for Gas target 
Setting for the machines.
  72   Fri Mar 20 04:32:22 2020 ShahabRunsrun entry - run046 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 04:31 , first file: run046_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 04:31:44

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:   3 Hz
Xray_90:   33 Hz
Xray_145:   23 Hz
BaF_OR:    2463 Hz

Si voltage:          60.02 V  
Si leakage current:  3.93 uA


SIS particles before:           2e9
ESR particles at injection:     5e7
ESR particles after decel.:     2e6
Target ON density:              1.8e13


copy and repeat the above (below the line) every 30 minutes
  73   Fri Mar 20 05:03:03 2020 ShahabRunsrun entry - run046 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 04:31 , first file: run046_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 05:00

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:   3 Hz
Xray_90:   28 Hz
Xray_145:   24 Hz
BaF_OR:    2452 Hz

Si voltage:          60.02 V  
Si leakage current:  3.93 uA


SIS particles before:           2e9
ESR particles at injection:     5e7
ESR particles after decel.:     2e6
Target ON density:              1.8e13


copy and repeat the above (below the line) every 30 minutes
  74   Fri Mar 20 05:32:44 2020 ShahabRunsrun entry - run047 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 05:30 , first file: run047_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 05:30

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:   2 Hz
Xray_90:   27 Hz
Xray_145:   20 Hz
BaF_OR:    2379 Hz

Si voltage:          60.02 V  
Si leakage current:  3.93 uA


SIS particles before:           2e9
ESR particles at injection:     5e7
ESR particles after decel.:     5e6
Target ON density:              1.97e13


copy and repeat the above (below the line) every 30 minutes
  75   Fri Mar 20 06:00:26 2020 ShahabRunsrun entry - run047 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 05:30 , first file: run047_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 06:00

ON Rates
Si_X:      1 Hz
Si_Y:       1 Hz
Xray_35:   3 Hz
Xray_90:   33 Hz
Xray_145:   23 Hz
BaF_OR:    2512 Hz

Si voltage:          60.02 V  
Si leakage current:  3.94 uA


SIS particles before:           2e9
ESR particles at injection:     5.3e7
ESR particles after decel.:     5.8e6
Target ON density:              1.97e13


copy and repeat the above (below the line) every 30 minutes
  76   Fri Mar 20 06:34:40 2020 ShahabRunsrun entry - run048 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 06:33 , first file: run048_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 06:36

ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:   0 Hz
Xray_90:   39 Hz
Xray_145:   16 Hz
BaF_OR:    2590 Hz

Si voltage:          60.02 V  
Si leakage current:  4.0 uA


SIS particles before:           2e9
ESR particles at injection:     5.8e7
ESR particles after decel.:     5.2e6
Target ON density:              1.55e13


copy and repeat the above (below the line) every 30 minutes
  77   Fri Mar 20 07:01:06 2020 ShahabRunsrun entry - run048 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 06:33 , first file: run048_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 07:00

ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  1 Hz
Xray_90:   39 Hz
Xray_145:   38 Hz
BaF_OR:    2498 Hz

Si voltage:          60.02 V  
Si leakage current:  4.03 uA


SIS particles before:           2e9
ESR particles at injection:     5.8e7
ESR particles after decel.:     5.4e6
Target ON density:              1.57e13


copy and repeat the above (below the line) every 30 minutes
  140   Sat Mar 21 18:13:22 2020 ShahabGeneralrough comparison gas target off and on 
rough comparison of life time at 10 MeV/u when target off with on. more noise in background means weaker signal.
  185   Sun Mar 22 12:50:00 2020 ShahabRunsLife time of 10 MeV/u Tail of 118-Te-52+ 
The life time of 10 MeV/u Tail of cycle 118-Te-52+ was analyzed using Schottky peak intensity. Schottky signal was taken from the parallel plate Schottky monitor at  using the:

Tektronix RSA5103B analyzer parameters:
Frequency = 39.8380 MHz
span = 50 kHz
RBW = 100 Hz
AcqBW = 78.12 kHz

The peak intensity is integrated power of the resolution bandwidth. 

Trigger was set to machine 12, same as gas target "on" signal. Each file contains 40 seconds of recorded signal. Spectra were calculated using sensitive multitaper method with additional averaging of every 10 time frames.

After evaluation of several Schottky spectra, except from some fluctuations, there was no significant change in beam lifetime with or without gas target. They are in the same order of magnitude, that is, it seems that target interaction is not so prominent compared to the rest of the ring. with a xenon target the situation would be much different.


Attached are some plots. Also here are the results of the analyzed files in text form:



Target off: average 9.21 sec

118Te52+_-2020.03.21.08.35.40.854.tiq t= 9.24733015363724
118Te52+_-2020.03.21.08.36.50.173.tiq t= 8.070302067046537
118Te52+_-2020.03.21.08.37.58.916.tiq t= 9.309208734357618
118Te52+_-2020.03.21.08.39.07.690.tiq t= 7.94474492655749
118Te52+_-2020.03.21.08.40.16.459.tiq t= 11.510487780556794


Target on: average 10.9 secs

118Te52+_-2020.03.21.08.28.48.246.tiq t= 9.80012584127354
118Te52+_-2020.03.21.08.29.56.985.tiq t= 11.751070659928155
118Te52+_-2020.03.21.08.31.05.750.tiq t= 10.719205394679026
118Te52+_-2020.03.21.08.32.14.509.tiq t= 13.722763765411063
118Te52+_-2020.03.21.08.33.23.269.tiq t= 8.513007281444073
  209   Sun Mar 22 23:59:12 2020 ShahabRunsrun entry - run091 
Taking data again with primary beam.

open file : run090

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run091_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 23:57:53

ON Rates
Si_X:      1 Hz
Si_Y:      1 Hz
Xray_35:   5 Hz
Xray_90:   102 Hz
Xray_145:  35 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.23 uA


SIS particles before:           4.6e8
ESR current at injection:      
ESR particles after decel.:     1.12e7
Target ON density:              5e13

copy and repeat the above (below the line) every 30 minutes
  211   Mon Mar 23 00:36:51 2020 ShahabRunsrun entry - run091 
Taking data again with primary beam.

open file : run091

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run091_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 00:36

ON Rates
Si_X:      3 Hz
Si_Y:      3 Hz
Xray_35:   1 Hz
Xray_90:   57 Hz
Xray_145:  16 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.25 uA


SIS particles before:           7e8
ESR current at injection:      
ESR particles after decel.:     8.5e6
Target ON density:              5e13

copy and repeat the above (below the line) every 30 minutes
  212   Mon Mar 23 00:39:52 2020 ShahabGeneralRamping cycle picture and data 
Complete ramping cycle recorded from Oscilloscope Tektronix MSOX2024A.
 Stored as XLS file.
  213   Mon Mar 23 01:17:26 2020 ShahabGeneralLife time measurements using Schottky 
Did Schottky measurements using 5 shots with and without gas target each
restarting the DAQ
  214   Mon Mar 23 01:18:16 2020 ShahabRunsrun entry - run092 
Taking data again with primary beam.

open file : run092

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run092_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 01:16

ON Rates
Si_X:      2 Hz
Si_Y:      2 Hz
Xray_35:   0 Hz
Xray_90:   92 Hz
Xray_145:  36 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.12 uA


SIS particles before:           7.6e8
ESR current at injection:      
ESR particles after decel.:     2.3e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
  215   Mon Mar 23 01:53:59 2020 ShahabRunsEmpty shots in ESR 
since about 01:40 AM, there is no beam in ESR. .
stopped data acquisition
OPs are working on it. After searching, OPs decided that something is wrong with ESR.
  216   Mon Mar 23 03:04:56 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:04

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    3 Hz
Xray_90:    34 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.18 uA


SIS particles before:           4.9e8
ESR current at injection:      
ESR particles after decel.:     8.7e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
  217   Mon Mar 23 03:07:11 2020 ShahabRunsSIS Kicker problem 
After calling ESR on-call duty (M. Steck) he confirmed that the ESR is fine and suspected the SIS kicker modules.

SIS operators then checked and could confirm that module 5 is out of order and module 4 sometimes works sometimes not.

They asked me I said better to run as good as possible with lower number of modules until the end of experiment, then later change the module. because otherwise changing module might take time.

they tried to increase the kick angle to check if they can move the spot to the center.

some shots went well but mostly failed.

they decided to call the Rufbereitschaft.

meanwhile I started the run number 93 to at least collect some data from some of the correct shots.

if counts are too high I will stop it.

let's see.
  218   Mon Mar 23 03:38:01 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:36

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    1 Hz
Xray_90:    45 Hz
Xray_145:   19 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.29 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     8.64e6
Target ON density:              4.35e13

copy and repeat the above (below the line) every 30 minutes
  219   Mon Mar 23 03:53:41 2020 ShahabRunsReduced intensity inspite of faulty kicker 
SIS Kicker is still faulty. but we managed to reduce again the intensity to around 2e6 particles in ring to reduce scattering on scraper.
  220   Mon Mar 23 03:58:25 2020 ShahabGeneralKicker guy arrived 
Kicker Guy (U. Blell) arrived in order to fix modules.
ELOG V3.1.5-fc6679b