HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 3 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Category Subject Year Text Attachments
  69   Fri Mar 20 01:22:23 2020 ShahabRunsSetting for Gas target Setting for the machines.  IMG_20200320_012048.jpg 
  72   Fri Mar 20 04:32:22 2020 ShahabRunsrun entry - run046 beam: 124Xe54+
energy: 10 MeV/u
  
  73   Fri Mar 20 05:03:03 2020 ShahabRunsrun entry - run046 beam: 124Xe54+
energy: 10 MeV/u
  
  74   Fri Mar 20 05:32:44 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
  75   Fri Mar 20 06:00:26 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
  76   Fri Mar 20 06:34:40 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  77   Fri Mar 20 07:01:06 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  140   Sat Mar 21 18:13:22 2020 ShahabGeneralrough comparison gas target off and on rough comparison of life time at 10 MeV/u
when target off with on. more noise in background
means weaker signal.
 target_effect.jpg 
  185   Sun Mar 22 12:50:00 2020 ShahabRunsLife time of 10 MeV/u Tail of 118-Te-52+ The life time of 10 MeV/u Tail of cycle 118-Te-52+
was analyzed using Schottky peak intensity.
Schottky signal was taken from the parallel
 target_off.jpgtarget_on.jpg 
  209   Sun Mar 22 23:59:12 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run090
  
  211   Mon Mar 23 00:36:51 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run091
  
  212   Mon Mar 23 00:39:52 2020 ShahabGeneralRamping cycle picture and data Complete ramping cycle recorded from Oscilloscope
Tektronix MSOX2024A.
 Stored as XLS file.
 2020-03-23_machine_cycle_ramping.bmp2020-03-23_machine_cycle_ramping.xlsx 
  213   Mon Mar 23 01:17:26 2020 ShahabGeneralLife time measurements using Schottky Did Schottky measurements using 5 shots with
and without gas target each
restarting the DAQ
  
  214   Mon Mar 23 01:18:16 2020 ShahabRunsrun entry - run092 Taking data again with primary beam.

open file : run092
  
  215   Mon Mar 23 01:53:59 2020 ShahabRunsEmpty shots in ESR since about 01:40 AM, there is no beam in
ESR. .
stopped data acquisition
  
  216   Mon Mar 23 03:04:56 2020 ShahabRunsrun entry - run093 RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
  
  217   Mon Mar 23 03:07:11 2020 ShahabRunsSIS Kicker problem After calling ESR on-call duty (M. Steck)
he confirmed that the ESR is fine and suspected
the SIS kicker modules.
 IMG_20200323_021051.jpg 
  218   Mon Mar 23 03:38:01 2020 ShahabRunsrun entry - run093 RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
  
  219   Mon Mar 23 03:53:41 2020 ShahabRunsReduced intensity inspite of faulty kicker SIS Kicker is still faulty. but we managed
to reduce again the intensity to around 2e6
particles in ring to reduce scattering on
  
  220   Mon Mar 23 03:58:25 2020 ShahabGeneralKicker guy arrived Kicker Guy (U. Blell) arrived in order to
fix modules.
  
ELOG V3.1.5-fc6679b