HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 4 of 29  Not logged in ELOG logo
Entry  Sat Mar 21 21:41:29 2020, Sergiy,Ruijiu , Runs, run entry - run067,  
open file : run067

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 20:41 , first file: run067_0001.lmd
run stop  at 21:40 , last file:  run066_0xxx.lmd

_______________________________________________________________________________

time: 21:12 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   29 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.08 uA


SIS particles before:           ~2.5e9
ESR particles at injection:     n.n.
ESR particles after decel.:     
Target ON density:              6.e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sat Mar 21 22:59:09 2020, Sergiy,Ruijiu , Runs, run entry - run068,  
open file : run068

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:54 , first file: run068_0001.lmd
run stop  at : , last file:  run067_0xxx.lmd

_______________________________________________________________________________

time: 22:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   48 Hz
Xray_145:  17 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.06 uA


SIS particles before:           ~3.0e9
ESR particles at injection:     n.n.
ESR particles after decel.:     
Target ON density:              5.23e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sat Mar 21 23:24:09 2020, Dima, Pierre, Runs, run entry - run068,  
open file : run068

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:54 , first file: run068_0001.lmd
run stop  at : , last file:  run067_0xxx.lmd

_______________________________________________________________________________

time: 23:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   53 Hz
Xray_145:  16 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.3e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.41e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sat Mar 21 23:54:36 2020, Dima, Pierre, Runs, run entry - run069,  
open file : run069

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 23:54 , first file: run069_0001.lmd
run stop  at : , last file:  run068_0xxx.lmd

_______________________________________________________________________________

time: 23:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   65 Hz
Xray_145:  23 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.10 uA


SIS particles before:           ~2.3e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.37e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 00:24:39 2020, Dima, Pierre, Runs, run entry - run069,  
open file : run069

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 23:54 , first file: run069_0001.lmd
run stop  at : , last file:  run068_0xxx.lmd

_______________________________________________________________________________

time: 23:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   56 Hz
Xray_145:  26 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.10 uA


SIS particles before:           ~2.2e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.36e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 00:55:00 2020, Dima, Pierre, Runs, run entry - run070,  
open file : run070

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 00:54 , first file: run070_0001.lmd
run stop  at : , last file:  run069_0xxx.lmd

_______________________________________________________________________________

time: 00:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   70 Hz
Xray_145:  15 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.6e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.6e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 01:25:02 2020, Dima, Pierre, Runs, run entry - run070,  
open file : run070

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 00:54 , first file: run070_0001.lmd
run stop  at : , last file:  run069_0xxx.lmd

_______________________________________________________________________________

time: 01:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   3 Hz
Xray_90:   48 Hz
Xray_145:  24 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.6e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.71e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 01:54:49 2020, Dima, Pierre, Runs, run entry - run071,  
open file : run071

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 01:54 , first file: run071_0001.lmd
run stop  at : , last file:  run070_0xxx.lmd

_______________________________________________________________________________

time: 01:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   57 Hz
Xray_145:  22 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              5.4e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 02:24:07 2020, Dima, Pierre, Runs, run entry - run071,  
open file : run071

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 01:54 , first file: run071_0001.lmd
run stop  at : , last file:  run070_0xxx.lmd

_______________________________________________________________________________

time: 02:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   5 Hz
Xray_90:   63 Hz
Xray_145:  18 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.9e9
ESR current at injection:       20 uA
ESR particles after decel.:     
Target ON density:              5.3e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 02:55:35 2020, Dima, Pierre, Runs, run entry - run072,  
open file : run072

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 02:54 , first file: run072_0001.lmd
run stop  at : , last file:  run071_0xxx.lmd

_______________________________________________________________________________

time: 02:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   46 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.16 uA


SIS particles before:           ~1.75e9
ESR current at injection:       20 uA
ESR particles after decel.:     
Target ON density:              4e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 03:24:39 2020, Dima, Pierre, Runs, run entry - run072,  
open file : run072

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 02:54 , first file: run072_0001.lmd
run stop  at : , last file:  run071_0xxx.lmd

_______________________________________________________________________________

time: 03:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   48 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.6e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 03:54:24 2020, Dima, Pierre, Runs, run entry - run073,  
open file : run073

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 03:54 , first file: run073_0001.lmd
run stop  at : , last file:  run072_0xxx.lmd

_______________________________________________________________________________

time: 03:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   53 Hz
Xray_145:  19 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.6e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 04:31:45 2020, Dima, Pierre, Runs, run entry - run073,  
open file : run073

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 03:54 , first file: run073_0001.lmd
run stop  at : , last file:  run072_0xxx.lmd

_______________________________________________________________________________

time: 04:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   4 Hz
Xray_90:   54 Hz
Xray_145:  20 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.06 uA


SIS particles before:           ~1.7e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.8e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 04:57:44 2020, Dima, Pierre, Runs, run entry - run074,  
open file : run074

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 04:57 , first file: run074_0001.lmd
run stop  at : , last file:  run073_0xxx.lmd

_______________________________________________________________________________

time: 04:57 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   64 Hz
Xray_145:  28 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~1.7e9
ESR current at injection:       22 uA
ESR particles after decel.:     
Target ON density:              3.8e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 05:26:47 2020, Dima, Pierre, Runs, run entry - run074,  
open file : run074

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 04:57 , first file: run074_0001.lmd
run stop  at : , last file:  run073_0xxx.lmd

_______________________________________________________________________________

time: 05:25 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   70 Hz
Xray_145:  17 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~1.9e9
ESR current at injection:       22 uA
ESR particles after decel.:     
Target ON density:              3.7e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 05:54:34 2020, Dima, Pierre, Runs, run entry - run075,  
open file : run075

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 05:54 , first file: run075_0001.lmd
run stop  at : , last file:  run074_0xxx.lmd

_______________________________________________________________________________

time: 05:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   3 Hz
Xray_90:   46 Hz
Xray_145:  18 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.07 uA


SIS particles before:           ~1.9e9
ESR current at injection:       22 uA
ESR particles after decel.:     
Target ON density:              3.3e13


copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 06:23:43 2020, Dima, Pierre, Runs, run entry - run075,  
open file : run075

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 05:54 , first file: run075_0001.lmd
run stop  at : , last file:  run074_0xxx.lmd

_______________________________________________________________________________

time: 06:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   58 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.07 uA


SIS particles before:           ~1.9e9
ESR current at injection:       22 uA
ESR particles after decel.:     
Target ON density:              3.4e13

run 075 has been stopped because two brave warriors went to ESR for filling the LN in our detectors in the name of Physics!

copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 06:54:42 2020, Dima, Pierre, Runs, run entry - run076,  
open file : run076

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 06:54 , first file: run076_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 06:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   8 Hz
Xray_90:   48 Hz
Xray_145:  16 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.5e9
ESR current at injection:       10 uA
ESR particles after decel.:     
Target ON density:              3.2e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 07:23:44 2020, Dima, Esther, Runs, run entry - run076,  
open file : run076

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 06:54 , first file: run076_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 07:26 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   56 Hz
Xray_145:  21 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.6e9
ESR current at injection:       10 uA
ESR particles after decel.:     
Target ON density:              2.9e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
Entry  Sun Mar 22 07:53:30 2020, Dima, Esther, Runs, run entry - run077,  
open file : run077

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 07:54 , first file: run077_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 07:54 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   38 Hz
Xray_145:  17 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.07 uA


SIS particles before:           ~2.5e9
ESR current at injection:       10 uA
ESR particles after decel.:     
Target ON density:              2.8e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b