HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 6 of 29  Not logged in ELOG logo
ID Date Author Category Subject Yeardown
  386   Sat May 22 14:53:34 2021 Beatriz et al.GeneralDSSD Movement2021
DSSSD moved to the most in position in order to try to scrape the beam with the scraper.
  387   Sat May 22 16:28:10 2021 LaszloGeneralDSSSD movement2021
The DSSSD is moved back to its measurement position(-25mm).
  388   Sat May 22 16:29:07 2021 Laszlo et al.Generalcoolers are back2021
we can measure again.

(please write a detailed description if needed)
  389   Sat May 22 17:01:33 2021 Pierre-Michel & EnisRunsRun 00722021
open file : e127b_run0072.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 3e7
ESR particles after decel.: 3e6
Target ON density: 1.0e14
  390   Sat May 22 17:13:48 2021 LaszloDetectorsSi position changed2021
Si was moved from -25 mm to -19 mm before run 0072.
  391   Sat May 22 17:15:26 2021 LaszloGeneralScraper position2021
We found the beam axis with the scraper to be -17.5 mm.
The Scraper position set to +12.5 mm, 30 mm relative from the beam.
  392   Sat May 22 18:05:22 2021 Pierre-Michel & EnisRunsRun 00732021
open file : e127b_run0073.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 2e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14
  393   Sat May 22 19:05:13 2021 Pierre-Michel & EnisRunsRun 00742021
Note: SIS lost HF, no beam since 19:21. Stopped run early

open file : e127b_run0074.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 8e7
ESR current at injection: 3e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14
  394   Sat May 22 19:32:28 2021 Pierre-Michel & EnisRunsRun 00752021
open file : e127b_run0075.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1.1e8
ESR current at injection: 2.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
  395   Sat May 22 20:46:19 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021
The scraper was moved into 2.5mm in absolute which corresponds to 20mm away from the beam axis.

Pressluft Antriebe

Position 1
GE01DD1IG (SC12) 2.5 mm

Position 2
GE01DD1IG (SC9) 2.5 mm
  396   Sat May 22 20:47:39 2021 Pierre-Michel & EnisRunsRun 00762021
open file : e127b_run0076.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +2.5 mm (20mm away from beam)

run start: 1:: 22-05-2021
run stop: 21:21:38 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1.3e8
ESR current at injection: 4.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
  397   Sat May 22 21:33:22 2021 LaszloDetectorsXray detectors are filled at 90 and 352021
  398   Sat May 22 21:40:09 2021 Pierre-Michel & EnisRunsRun 00772021
open file : e127b_run0077.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +2.5 mm (20mm away from beam)

run start: 21:39:33 22-05-2021
run stop: 22:20:22 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1.2e8
ESR current at injection: 4e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
  399   Sat May 22 22:25:42 2021 Pierre-Michel & EnisRunsRun 00782021
open file : e127b_run0078.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 22:25:23 22-05-2021
run stop: 23:27:16 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 2.2e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14

Info: Dipole MU2 did no longer work, reset during the run, tried to reset at 23:12 Uhr. Problem not solved at the end of the run. Problematic injection structure
  400   Sat May 22 22:29:48 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021
The scraper was moved into 7.5 mm in absolute which corresponds to 25 mm away from the beam axis.

Pressluft Antriebe

Position 1
GE01DD1IG (SC12) 7.5 mm

Position 2
GE01DD1IG (SC9) 7.5 mm
  401   Sat May 22 23:28:08 2021 Philipp, BennyRunsRun 00792021
open file : e127b_run0079.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 23:35:43 22.05.2021
run stop: 00:34:46 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1e8
ESR current at injection: 3.5e7
ESR particles after decel.: 3e6
Target ON density: 1.0e14
  402   Sun May 23 00:35:33 2021 Philipp, BennyRunsRun 00802021
open file : e127b_run0080.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 00:35:16 23.05.2021
run stop: 01:35:21 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: xxxxx scaling problem, value negative, seem to be a visual problem only
ESR current at injection: 1.6e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14
  403   Sun May 23 01:36:04 2021 Philipp, BennyRunsRun 00812021
open file : e127b_run0081.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 01:36:06 23.05.2021
run stop: 02:35:37 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 5.5e7
ESR current at injection: 1.2e7
ESR particles after decel.: 2.2e6
Target ON density: 1.0e14
  404   Sun May 23 02:16:47 2021 LaszloGeneralquick comparison between different scraping positions2021
So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
- 20mm away from beam axis (lmd76-77)

below one can see the comparison of the scrapings for the DSSSD spectrum. Please mind the different amount of data collected
  405   Sun May 23 02:36:07 2021 Philipp, BennyRunsRun 00822021
open file : e127b_run0082.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 02:36:02 23.05.2021
run stop: 03:34:08 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 4.5e7
ESR current at injection: 8e6
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
ELOG V3.1.5-fc6679b