ID |
Date |
Author |
Category |
Subject |
Year |
406
|
Sun May 23 03:34:44 2021 |
Philipp, Benny | Runs | Run 0083 | 2021 |
open file : e127b_run0083.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)
run start: 03:34:50 23.05.2021
run stop: 04:35:42 23.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: bug in display
ESR current at injection: 1e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14 |
407
|
Sun May 23 04:36:15 2021 |
Philipp, Benny | Runs | Run 0084 | 2021 |
open file : e127b_run0084.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)
run start: 04:36:12 23.05.2021
run stop: 05:34:45 23.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: bug in display
ESR current at injection: 1.2e7
ESR particles after decel.: 3.0e6
Target ON density: 1.0e14 |
408
|
Sun May 23 05:35:07 2021 |
Philipp, Benny | Runs | Run 0085 | 2021 |
open file : e127b_run0085.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)
run start: 05:35:04 23.05.2021
run stop: 06:33:22 23.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 3.8e7
ESR current at injection: 1.3e7
ESR particles after decel.: 2.0e6
Target ON density: 1.0e14 |
409
|
Sun May 23 06:33:46 2021 |
Philipp, Benny | Runs | Run 0086 | 2021 |
open file : e127b_run0086.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)
run start: 06:33:41 23.05.2021
run stop: 07:39:40 23.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 800 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 2.8e7
ESR current at injection: 1.3e7
ESR particles after decel.: 2.2e6
Target ON density: 1.0e14 |
410
|
Sun May 23 07:40:48 2021 |
Michele, Beatriz | Runs | Run 0087 | 2021 |
open file : e127b_run0086.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)
run start: 07:40:25 23.05.2021
run stop: 08:07:46 23.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 3.3e7
ESR current at injection: 1.0e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14 |
411
|
Sun May 23 15:36:10 2021 |
Rui-Jiu Chen& Alex | General | All shifts until Monday morning (24th May) have been cancelled. | 2021 |
All shifts until Monday morning (24th May) have been cancelled.
Next update on further situation (in particular concerning the morning shift on Monday) will be given tonight . |
412
|
Sun May 23 23:44:37 2021 |
Jan | Runs | Run 0088 - background BaF/Xray | 2021 |
open file : e127b_run0088.lmd
no beam
purpose:
BG measurement for Xray and BaF
run start: 23:44:09 23.05.2021
run stop:
_______________________________________________________________________________
ON Rates
Si_OFF_bdt: Hz
Xray_ON_bdt: 60Hz
BaF_OR: 3000Hz |
413
|
Mon May 24 05:20:36 2021 |
Helmut, Yuri, Faraz, Sergey | Accelerator | FRS setup | 2021 |
Logbook from start of FRS until 118Te injection |
414
|
Mon May 24 06:30:42 2021 |
Ragan | DAQ | NTCAP | 2021 |
NTCAP started for recording Schottky data
SC_2021-05-24_06-29-31
\IQ_2021-05-24_06-29-31
Reference level: -30 dBm
Carrier frequency: 245 M
IQ Rate: 20 MS/s
RF attenuation (dB): 40
IF attenuation (dB): 19.9288
masterpath:
o:\E143\iq
ESR settings:
We recorded 3-4 full cycles with 5 stacks.
Then we recorded in SC5 manipulation for 10 min and afterwards in SC3 manipulation for 10 min. |
415
|
Mon May 24 11:12:38 2021 |
Sophia, Mario | Runs | Run 0090 | 2021 |
DAQ node 2 was not started!
open file : e127b_run0090.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 11:10:18 23.05.2021
run stop:
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
416
|
Mon May 24 11:25:46 2021 |
Sophia, Mario | Runs | Run 0091 | 2021 |
open file : e127b_run0091.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 11:25:08 25.05.2021
run stop: 12:26:31 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
417
|
Mon May 24 12:29:20 2021 |
Sophia, Mario | Runs | Run 0092 | 2021 |
20 stacks now
open file : e127b_run0092.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 12:28:57 24.05.2021
run stop: 13:13:56 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
418
|
Mon May 24 13:14:59 2021 |
Sophia, Mario | Runs | Run 0093 | 2021 |
No. of stacks: 5
length SC10: 2x 5.5s
open file : e127b_run0093.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 13:14:44 24.05.2021
run stop: 14:10:55 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
419
|
Mon May 24 14:12:14 2021 |
Sophia, Mario | Runs | Run 0094 | 2021 |
No. of stacks: 5
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -10 mm (before -20 mm)
open file : e127b_run0094.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 14:15:47 24.05.2021
run stop: 15:20:37 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
420
|
Mon May 24 15:24:52 2021 |
Jan, Laszlo, Piere-Michel, Enis | Runs | Run 0096 | 2021 |
No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
open file : e127b_run0096.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 15:24:51 24.05.2021
run stop: 15:51:56 24.05.2021 (stopped early, due to radiation alarm)
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 410 uA
SIS particles before: 7.6e8
ESR current at injection: 2e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
421
|
Mon May 24 16:06:39 2021 |
Jan, Laszlo, Piere-Michel, Enis | Runs | Run 0097 | 2021 |
Changed trafo offset during this file !!
No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
open file : e127b_run0097.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 16:05:44 24.05.2021
run stop: 17:22:36 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 410 uA
SIS particles before: 1.3e8
ESR current at injection: 1.3e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
422
|
Mon May 24 17:23:41 2021 |
Pierre-Michel, Enis | General | Status of gas-target cooling | 2021 |
Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status 6"
At 18:16 "unkown status 0"
At 18:21 "ok"
At 19:26 "unknown status 0"
At 19:31 "ok" |
423
|
Mon May 24 17:25:56 2021 |
Pierre-Michel, Enis | Runs | Run 0098 | 2021 |
No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
open file : e127b_run0098.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 17:25:37 24.05.2021
run stop: 18:05:33 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 400 uA
SIS particles before: 1.5e9
ESR current at injection: 1.25e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |
424
|
Mon May 24 17:48:04 2021 |
Erika | General | FRS shiftplan, name abbreviations and phone list | 2021 |
FRS shift plan for this week:
Name abbreviations:
Phone numbers:
|
425
|
Mon May 24 18:10:33 2021 |
Pierre-Michel, Enis | Runs | Run 0099 | 2021 |
No. of stacks: 20 (before 10)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
open file : e127b_run0099.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 18:10:17 24.05.2021
run stop: 19:10:19 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 400 uA
SIS particles before: 1.3e9
ESR current at injection: 1.75e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |