HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 6 of 29  Not logged in ELOG logo
Entry  Sat May 22 14:53:34 2021, Beatriz et al., General, DSSD Movement, 2021 
DSSSD moved to the most in position in order to try to scrape the beam with the scraper.
Entry  Sat May 22 16:28:10 2021, Laszlo, General, DSSSD movement, 2021 
The DSSSD is moved back to its measurement position(-25mm).
Entry  Sat May 22 16:29:07 2021, Laszlo et al., General, coolers are back, 2021 
we can measure again.

(please write a detailed description if needed)
Entry  Sat May 22 17:01:33 2021, Pierre-Michel & Enis, Runs, Run 0072, 2021 
open file : e127b_run0072.lmd

beam: 124Xe54+
Entry  Sat May 22 17:13:48 2021, Laszlo, Detectors, Si position changed, 2021 
Si was moved from -25 mm to -19 mm before run 0072.
Entry  Sat May 22 17:15:26 2021, Laszlo, General, Scraper position, 2021 
We found the beam axis with the scraper to be -17.5 mm.
The Scraper position set to +12.5 mm, 30 mm relative from the beam.
Entry  Sat May 22 18:05:22 2021, Pierre-Michel & Enis, Runs, Run 0073, 2021 
open file : e127b_run0073.lmd

beam: 124Xe54+
Entry  Sat May 22 19:05:13 2021, Pierre-Michel & Enis, Runs, Run 0074, 2021 
Note: SIS lost HF, no beam since 19:21. Stopped run early

open file : e127b_run0074.lmd
Entry  Sat May 22 19:32:28 2021, Pierre-Michel & Enis, Runs, Run 0075, 2021 
open file : e127b_run0075.lmd

beam: 124Xe54+
Entry  Sat May 22 20:46:19 2021, Laszlo, Pierre.Michel, Enis, General, new scraper position, 2021 
The scraper was moved into 2.5mm in absolute which corresponds to 20mm away from the beam axis.

Pressluft Antriebe
Entry  Sat May 22 20:47:39 2021, Pierre-Michel & Enis, Runs, Run 0076, 2021 
open file : e127b_run0076.lmd

beam: 124Xe54+
Entry  Sat May 22 21:33:22 2021, Laszlo, Detectors, Xray detectors are filled at 90 and 35, 2021 
 
Entry  Sat May 22 21:40:09 2021, Pierre-Michel & Enis, Runs, Run 0077, 2021 
open file : e127b_run0077.lmd

beam: 124Xe54+
Entry  Sat May 22 22:25:42 2021, Pierre-Michel & Enis, Runs, Run 0078, 2021 
open file : e127b_run0078.lmd

beam: 124Xe54+
Entry  Sat May 22 22:29:48 2021, Laszlo, Pierre.Michel, Enis, General, new scraper position, 2021 
The scraper was moved into 7.5 mm in absolute which corresponds to 25 mm away from the beam axis.

Pressluft Antriebe
Entry  Sat May 22 23:28:08 2021, Philipp, Benny, Runs, Run 0079, 2021 
open file : e127b_run0079.lmd

beam: 124Xe54+
Entry  Sun May 23 00:35:33 2021, Philipp, Benny, Runs, Run 0080, 2021 
open file : e127b_run0080.lmd

beam: 124Xe54+
Entry  Sun May 23 01:36:04 2021, Philipp, Benny, Runs, Run 0081, 2021 
open file : e127b_run0081.lmd

beam: 124Xe54+
Entry  Sun May 23 02:16:47 2021, Laszlo, General, quick comparison between different scraping positions, 2021 scraping_30.pngscraping_25.pngscraping_20.png
So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
Entry  Sun May 23 02:36:07 2021, Philipp, Benny, Runs, Run 0082, 2021 
open file : e127b_run0082.lmd

beam: 124Xe54+
ELOG V3.1.5-fc6679b