Entry  Sat May 22 14:53:34 2021, Beatriz et al., General, DSSD Movement, 2021 
DSSSD moved to the most in position in order to try to scrape the beam with the scraper.
Entry  Sat May 22 16:28:10 2021, Laszlo, General, DSSSD movement, 2021 
The DSSSD is moved back to its measurement position(-25mm).
Entry  Sat May 22 16:29:07 2021, Laszlo et al., General, coolers are back, 2021 
we can measure again.

(please write a detailed description if needed)
Entry  Sat May 22 17:01:33 2021, Pierre-Michel & Enis, Runs, Run 0072, 2021 
open file : e127b_run0072.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 3e7
ESR particles after decel.: 3e6
Target ON density: 1.0e14
Entry  Sat May 22 17:13:48 2021, Laszlo, Detectors, Si position changed, 2021 
Si was moved from -25 mm to -19 mm before run 0072.
Entry  Sat May 22 17:15:26 2021, Laszlo, General, Scraper position, 2021 
We found the beam axis with the scraper to be -17.5 mm.
The Scraper position set to +12.5 mm, 30 mm relative from the beam.
Entry  Sat May 22 18:05:22 2021, Pierre-Michel & Enis, Runs, Run 0073, 2021 
open file : e127b_run0073.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 2e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14
Entry  Sat May 22 19:05:13 2021, Pierre-Michel & Enis, Runs, Run 0074, 2021 
Note: SIS lost HF, no beam since 19:21. Stopped run early

open file : e127b_run0074.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 8e7
ESR current at injection: 3e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14
Entry  Sat May 22 19:32:28 2021, Pierre-Michel & Enis, Runs, Run 0075, 2021 
open file : e127b_run0075.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +12.5 mm

run start: 1:: 22-05-2021
run stop: 1:: 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1.1e8
ESR current at injection: 2.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
Entry  Sat May 22 20:46:19 2021, Laszlo, Pierre.Michel, Enis, General, new scraper position, 2021 
The scraper was moved into 2.5mm in absolute which corresponds to 20mm away from the beam axis.

Pressluft Antriebe

Position 1
GE01DD1IG (SC12) 2.5 mm

Position 2
GE01DD1IG (SC9) 2.5 mm
Entry  Sat May 22 20:47:39 2021, Pierre-Michel & Enis, Runs, Run 0076, 2021 
open file : e127b_run0076.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +2.5 mm (20mm away from beam)

run start: 1:: 22-05-2021
run stop: 21:21:38 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1.3e8
ESR current at injection: 4.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
Entry  Sat May 22 21:33:22 2021, Laszlo, Detectors, Xray detectors are filled at 90 and 35, 2021 
 
Entry  Sat May 22 21:40:09 2021, Pierre-Michel & Enis, Runs, Run 0077, 2021 
open file : e127b_run0077.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +2.5 mm (20mm away from beam)

run start: 21:39:33 22-05-2021
run stop: 22:20:22 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1.2e8
ESR current at injection: 4e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
Entry  Sat May 22 22:25:42 2021, Pierre-Michel & Enis, Runs, Run 0078, 2021 
open file : e127b_run0078.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 22:25:23 22-05-2021
run stop: 23:27:16 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 2.2e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14

Info: Dipole MU2 did no longer work, reset during the run, tried to reset at 23:12 Uhr. Problem not solved at the end of the run. Problematic injection structure
Entry  Sat May 22 22:29:48 2021, Laszlo, Pierre.Michel, Enis, General, new scraper position, 2021 
The scraper was moved into 7.5 mm in absolute which corresponds to 25 mm away from the beam axis.

Pressluft Antriebe

Position 1
GE01DD1IG (SC12) 7.5 mm

Position 2
GE01DD1IG (SC9) 7.5 mm
Entry  Sat May 22 23:28:08 2021, Philipp, Benny, Runs, Run 0079, 2021 
open file : e127b_run0079.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 23:35:43 22.05.2021
run stop: 00:34:46 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1e8
ESR current at injection: 3.5e7
ESR particles after decel.: 3e6
Target ON density: 1.0e14
Entry  Sun May 23 00:35:33 2021, Philipp, Benny, Runs, Run 0080, 2021 
open file : e127b_run0080.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 00:35:16 23.05.2021
run stop: 01:35:21 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: xxxxx scaling problem, value negative, seem to be a visual problem only
ESR current at injection: 1.6e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14
Entry  Sun May 23 01:36:04 2021, Philipp, Benny, Runs, Run 0081, 2021 
open file : e127b_run0081.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 01:36:06 23.05.2021
run stop: 02:35:37 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 5.5e7
ESR current at injection: 1.2e7
ESR particles after decel.: 2.2e6
Target ON density: 1.0e14
Entry  Sun May 23 02:16:47 2021, Laszlo, General, quick comparison between different scraping positions, 2021 scraping_30.pngscraping_25.pngscraping_20.png
So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
- 20mm away from beam axis (lmd76-77)

below one can see the comparison of the scrapings for the DSSSD spectrum. Please mind the different amount of data collected
Entry  Sun May 23 02:36:07 2021, Philipp, Benny, Runs, Run 0082, 2021 
open file : e127b_run0082.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 02:36:02 23.05.2021
run stop: 03:34:08 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 4.5e7
ESR current at injection: 8e6
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14