Entry  Sun May 23 03:34:44 2021, Philipp, Benny, Runs, Run 0083, 2021 
open file : e127b_run0083.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 03:34:50 23.05.2021
run stop: 04:35:42 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: bug in display
ESR current at injection: 1e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
Entry  Sun May 23 04:36:15 2021, Philipp, Benny, Runs, Run 0084, 2021 
open file : e127b_run0084.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 04:36:12 23.05.2021
run stop: 05:34:45 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: bug in display
ESR current at injection: 1.2e7
ESR particles after decel.: 3.0e6
Target ON density: 1.0e14
Entry  Sun May 23 05:35:07 2021, Philipp, Benny, Runs, Run 0085, 2021 
open file : e127b_run0085.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 05:35:04 23.05.2021
run stop: 06:33:22 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 3.8e7
ESR current at injection: 1.3e7
ESR particles after decel.: 2.0e6
Target ON density: 1.0e14
Entry  Sun May 23 06:33:46 2021, Philipp, Benny, Runs, Run 0086, 2021 
open file : e127b_run0086.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 06:33:41 23.05.2021
run stop: 07:39:40 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 800 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 2.8e7
ESR current at injection: 1.3e7
ESR particles after decel.: 2.2e6
Target ON density: 1.0e14
Entry  Sun May 23 07:40:48 2021, Michele, Beatriz, Runs, Run 0087, 2021 
open file : e127b_run0086.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 07:40:25 23.05.2021
run stop: 08:07:46 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 3.3e7
ESR current at injection: 1.0e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
Entry  Sun May 23 15:36:10 2021, Rui-Jiu Chen& Alex, General, All shifts until Monday morning (24th May) have been cancelled. , 2021 
All shifts until Monday morning (24th May) have been cancelled. 
Next update on further situation (in particular concerning the morning shift on Monday) will be given tonight .
Entry  Sun May 23 23:44:37 2021, Jan, Runs, Run 0088 - background BaF/Xray, 2021 
open file : e127b_run0088.lmd

no beam

purpose:
BG measurement for Xray and BaF

run start: 23:44:09 23.05.2021
run stop:
_______________________________________________________________________________

ON Rates
Si_OFF_bdt: Hz
Xray_ON_bdt: 60Hz
BaF_OR: 3000Hz
Entry  Mon May 24 05:20:36 2021, Helmut, Yuri, Faraz, Sergey, Accelerator, FRS setup, 2021 14x
Logbook from start of FRS until 118Te injection
Entry  Mon May 24 06:30:42 2021, Ragan, DAQ, NTCAP, 2021 
NTCAP started for recording Schottky data

SC_2021-05-24_06-29-31
\IQ_2021-05-24_06-29-31

Reference level: -30 dBm
Carrier frequency: 245 M
IQ Rate: 20 MS/s

RF attenuation (dB): 40
IF attenuation (dB): 19.9288

masterpath:
o:\E143\iq


ESR settings:
We recorded 3-4 full cycles with 5 stacks.
Then we recorded in SC5 manipulation for 10 min and afterwards in SC3 manipulation for 10 min.
Entry  Mon May 24 11:12:38 2021, Sophia, Mario, Runs, Run 0090, 2021 
DAQ node 2 was not started!


open file : e127b_run0090.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 11:10:18 23.05.2021
run stop:
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 11:25:46 2021, Sophia, Mario, Runs, Run 0091, 2021 
open file : e127b_run0091.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 11:25:08 25.05.2021
run stop: 12:26:31 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 12:29:20 2021, Sophia, Mario, Runs, Run 0092, 2021 
20 stacks now

open file : e127b_run0092.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 12:28:57 24.05.2021
run stop: 13:13:56 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 13:14:59 2021, Sophia, Mario, Runs, Run 0093, 2021 
No. of stacks: 5
length SC10: 2x 5.5s

open file : e127b_run0093.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 13:14:44 24.05.2021
run stop: 14:10:55 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 14:12:14 2021, Sophia, Mario, Runs, Run 0094, 2021 
No. of stacks: 5
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -10 mm (before -20 mm)

open file : e127b_run0094.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 14:15:47 24.05.2021
run stop: 15:20:37 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 15:24:52 2021, Jan, Laszlo, Piere-Michel, Enis, Runs, Run 0096, 2021 
No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)

open file : e127b_run0096.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 15:24:51 24.05.2021
run stop: 15:51:56 24.05.2021 (stopped early, due to radiation alarm)
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 410 uA


SIS particles before: 7.6e8
ESR current at injection: 2e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 16:06:39 2021, Jan, Laszlo, Piere-Michel, Enis, Runs, Run 0097, 2021 
Changed trafo offset during this file !!

No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)

open file : e127b_run0097.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 16:05:44 24.05.2021
run stop: 17:22:36 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 410 uA


SIS particles before: 1.3e8
ESR current at injection: 1.3e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 17:23:41 2021, Pierre-Michel, Enis, General, Status of gas-target cooling, 2021 
Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status 6"

At 18:16 "unkown status 0"
At 18:21 "ok"

At 19:26 "unknown status 0"
At 19:31 "ok"
Entry  Mon May 24 17:25:56 2021, Pierre-Michel, Enis, Runs, Run 0098, 2021 
No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)

open file : e127b_run0098.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 17:25:37 24.05.2021
run stop: 18:05:33 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 400 uA


SIS particles before: 1.5e9
ESR current at injection: 1.25e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
Entry  Mon May 24 17:48:04 2021, Erika, General, FRS shiftplan, name abbreviations and phone list, 2021 FRS_shiftplan.pngFRS_name_abbreviations.PNGFRS_phone_list.PNG
FRS shift plan for this week:


Name abbreviations:


Phone numbers:
Entry  Mon May 24 18:10:33 2021, Pierre-Michel, Enis, Runs, Run 0099, 2021 
No. of stacks: 20 (before 10)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)

open file : e127b_run0099.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 18:10:17 24.05.2021
run stop: 19:10:19 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 400 uA


SIS particles before: 1.3e9
ESR current at injection: 1.75e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14