|  Tue May 25 07:51:48 2021, Jan, Accelerator, ESR stacking cycle length, 2021 | 
| The full cycle length of ESR with 30 stacks is about 7:45 minutes, out of which 15.5 sec are with target switched ON.
This is without CMB/HTD in parallel. | 
|  Tue May 25 07:46:39 2021, Oliver, Diego, Runs, Run 0111, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0111.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 07:46:02 25.05.2021
 run stop:  08:51:14 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 100 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  390 uA
 
 
 SIS particles before:      3.0e9
 ESR current at injection:  4.3e6 (stacked)
 ESR particles after decel.: 1.2e6 (more or less)
 Target ON density:          1.0e14
 | 
|  Tue May 25 06:42:39 2021, Cobus, Michele, Runs, Run 0110, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0110.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 06:42:05 25.05.2021
 run stop:  07:45:55 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 140 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  390 uA
 
 
 SIS particles before:      3.6e9
 ESR current at injection:  5.5e6 (stacked)
 ESR particles after decel.: 1.5e6 (more or less)
 Target ON density:          1.0e14
 | 
|  Tue May 25 05:36:31 2021, Cobus, Michele, Runs, Run 0109, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0109.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 05:35:52 25.05.2021
 run stop:  06:41:53 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 140 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  390 uA
 
 
 SIS particles before:      3.6e9
 ESR current at injection:  5.5e6 (stacked)
 ESR particles after decel.: 1.5e6 (more or less)
 Target ON density:          1.0e14
 | 
|  Tue May 25 04:32:39 2021, Cobus, Michele, Runs, Run 0108, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0108.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 04:32:00 25.05.2021
 run stop:  05:35:48 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 120 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  390 uA
 
 
 SIS particles before:      3.6e9
 ESR current at injection:  5.0e6 (stacked)
 ESR particles after decel.: 1.5e6
 Target ON density:          1.0e14
 
 Comments:
 
 ~40% less ESR current at injection ~04:38 - end of run
 No beam in SIS, 05:24 - 05:31
 | 
|  Tue May 25 03:34:11 2021, Cobus, Michele, Runs, Run 0107, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0107.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 03:33:12 25.05.2021
 run stop:  04:31:57 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 120 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      3.6e9 (-ish)
 ESR current at injection:  4.7e6 (stacked)
 ESR particles after decel.: 1.5e6
 Target ON density:          1.0e14
 | 
|  Tue May 25 02:32:22 2021, Cobus, Michele, Runs, Run 0106, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0106.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 02:31:52 25.05.2021
 run stop:  03:33:08 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 120 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      3.6e9 (-ish)
 ESR current at injection:  5.0e6 (stacked)
 ESR particles after decel.: 1.5e6
 Target ON density:          1.0e14
 
 Comment:
 
 02:22 - 02:49 40% lower ESR current at injection
 
 | 
|  Tue May 25 01:29:18 2021, Cobus, Michele, Runs, Run 0105, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0105.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 01:28:31 25.05.2021
 run stop: 02:31:49  25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 120 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      3.6e9 (-ish)
 ESR current at injection:  4.6e6 (stacked)
 ESR particles after decel.: 1.5e6
 Target ON density:          1.0e14
 
 Comment:
 
 02:22 - 02:49 40% lower ESR current at injection
 
 | 
|  Tue May 25 00:25:27 2021, Cobus, Michele, Runs, Run 0104, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0104.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 00:24:40 25.05.2021
 run stop:  01:28:20 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 120 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      3.5e9 (-ish)
 ESR current at injection:  4.5e6 (stacked)
 ESR particles after decel.: 1.3e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 23:00:32 2021, Pierre-Michel, Enis, Cobus, Michele, Runs, Run 0103, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0103.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 23:00:10 24.05.2021
 run stop:  00:24:34 25.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 120 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      2.2e9 (-ish)
 ESR current at injection:  4.5e6 (stacked)
 ESR particles after decel.: 1.3e6
 Target ON density:          9.0e13
 | 
|  Mon May 24 21:53:47 2021, Pierre-Michel, Enis, Runs, Run 0102, 2021 | 
| No. of stacks: 30 (before 20) length SC10: 3x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0102.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 21:53:27 24.05.2021
 run stop:  22:59:52 24.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 110 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      1.75e9 (-ish)
 ESR current at injection:  4e6 (stacked)
 ESR particles after decel.: 1.25e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 21:08:25 2021, Pierre-Michel, Enis, Runs, Run 0101, 2021 | 
| No. of stacks: 20 (before 10) length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0101.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 21:07:50 24.05.2021
 run stop:  21:46:08 24.05.2021 (3rd measurement, to accommodate for lost time in previous measurement)
 Measured after refilling of target cooling
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 100 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  390 uA
 
 
 SIS particles before:      1.75e9
 ESR current at injection:  3e6 (stacked)
 ESR particles after decel.: 4e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 19:21:52 2021, Pierre-Michel, Enis, Runs, Run 0100, 2021 | 
| No. of stacks: 20 (before 10) length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0100.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 19:21:36 24.05.2021
 run stop:  19:46:13 24.05.2021 (Stopped early to refill target-cooling)
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 75 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      1.3e9
 ESR current at injection:  1.75e6 (stacked)
 ESR particles after decel.: 4e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 18:10:33 2021, Pierre-Michel, Enis, Runs, Run 0099, 2021 | 
| No. of stacks: 20 (before 10) length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0099.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 18:10:17 24.05.2021
 run stop:  19:10:19 24.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 75 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      1.3e9
 ESR current at injection:  1.75e6 (stacked)
 ESR particles after decel.: 4e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 17:48:04 2021, Erika, General, FRS shiftplan, name abbreviations and phone list, 2021     | 
| FRS shift plan for this week: 
  
 Name abbreviations:
 
  
 Phone numbers:
 
  | 
|  Mon May 24 17:25:56 2021, Pierre-Michel, Enis, Runs, Run 0098, 2021 | 
| No. of stacks: 10 (before 5) length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0098.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 17:25:37 24.05.2021
 run stop:  18:05:33 24.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 75 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  400 uA
 
 
 SIS particles before:      1.5e9
 ESR current at injection:  1.25e6 (stacked)
 ESR particles after decel.: 4e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 17:23:41 2021, Pierre-Michel, Enis, General, Status of gas-target cooling, 2021 | 
| Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status 6"
At 18:16 "unkown status 0"
At 18:21 "ok"
At 19:26 "unknown status 0"
At 19:31 "ok" | 
|  Mon May 24 16:06:39 2021, Jan, Laszlo, Piere-Michel, Enis, Runs, Run 0097, 2021 | 
| Changed trafo offset during this file !! 
 No. of stacks: 10 (before 5)
 length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0097.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 16:05:44 24.05.2021
 run stop:  17:22:36 24.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 75 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  410 uA
 
 
 SIS particles before:      1.3e8
 ESR current at injection:  1.3e6 (stacked)
 ESR particles after decel.: 4e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 15:24:52 2021, Jan, Laszlo, Piere-Michel, Enis, Runs, Run 0096, 2021 | 
| No. of stacks: 10 (before 5) length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -20 mm (before -10 mm)
 
 open file : e127b_run0096.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 15:24:51 24.05.2021
 run stop:  15:51:56 24.05.2021 (stopped early, due to radiation alarm)
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:   ~0 Hz
 Xray_ON_bdt: 75 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  410 uA
 
 
 SIS particles before:      7.6e8
 ESR current at injection:  2e6 (stacked)
 ESR particles after decel.: 4e6
 Target ON density:          1.0e14
 | 
|  Mon May 24 14:12:14 2021, Sophia, Mario, Runs, Run 0094, 2021 | 
| No. of stacks: 5 length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -10 mm (before -20 mm)
 
 open file : e127b_run0094.lmd
 
 beam: 118Te52+
 energy: 7 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
 
 run start: 14:15:47 24.05.2021
 run stop:  15:20:37 24.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:    0 Hz
 Xray_ON_bdt: 0  Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  340 uA
 
 
 SIS particles before:      7.6e8
 ESR current at injection:  1e6 (stacked)
 ESR particles after decel.: 4e6
 Target ON density:          1.0e14
 |