Thu Oct 14 10:21:46 2021, Rodolfo, Detectors, Dismounting Cu-Mirror
|
We have dismounted the parabolic Cu-Mirror at ESR on 13.10.2021 |
Wed Sep 8 21:44:55 2021, Rodolfo, General, Preparation
|
[TABLE border="1"]
[B]Status[/B]|[B]Arbeitspaket[/B]|[COLOR=chocolate][B]Kommentare[/B][/COLOR]
|-
|
Fri Aug 6 10:40:54 2021, Rodolfo, DAQ, mbs in atplaser
|
The "MBS program" (data acquisition) is now located within atplaser@r4l-41, in the folder "th21":
|
Fri Aug 6 10:23:00 2021, Rodolfo, DAQ, atplaser on r4l-41
|
The user [B]atplaser[/B] is now existing on the [B]R4L-XY[/B] nodes for the ESR group.
R4 = [B]R[/B]IO[B]4[/B] Computer
|
Mon Aug 2 10:54:44 2021, Rodolfo, Laser, Quanta Ray - Water leak in the power supply
|
After fixing the broken water connector in the laser head a new water leak appeared in the Quanta-Ray power supply.
We found the leak in the water pump flow line (arrow up). We took the water connectors appart, rebuilt the teflon seeling and put the water connectors |
Wed Jul 28 13:31:22 2021, Rodolfo, General, Air filters
|
Filters (Hepa-) inside the flow boxes have been replaced. |
Mon Jul 26 17:58:52 2021, Rodolfo, Laser, Water Filters
|
The water filters (deioninzing and particle) have been replaced. |
Mon Jul 26 17:15:47 2021, Rodolfo, Laser, Quanta Ray - Water leak
|
On Thursday afternoon (22.07.2021) a water connector has broken and water has been spilled in the laser head. |