HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+, Page 12 of 12  Not logged in ELOG logo
Entry  Sat Apr 2 01:02:39 2022, Carsten, , Test measurements with two DAQs 
We do two measurements:

One measurement using the 
Entry  Sat Apr 2 17:47:16 2022, Ken Ueberholz , , Telefon, Gästehaus 
My guesthouse phone number: 06159-71-2957
Entry  Sat Apr 2 22:43:36 2022, Carsten, , Ring set-up for 229/89+, scraped and bunched, Iel=500mA at injection and 100mA during measurment 
The ring SIS/ESR were set up for 229/89+. Pölease note that this not only 1e- Th but ponteially also the isobars of Ac (0e-1)/Pa(2e-, strongest) and U(3e-).
SIS eenrgy plus 3.5 MeV/u w.r.t. to the 238U92+ settings. We nearly don't see any of the primary beam in the ring
Cooling energy is 208998 KeV (read from the ESR multimeter).
Entry  Sat Apr 2 23:16:55 2022, Carsten, , Cu mirror and CsI moved in and out of the ring 
Ken tested the Cu-mirror and CsI disk Detector. They move without a problem and don't scrape the ion beam.
Entry  Sun Apr 3 00:41:45 2022, Ken Ueberholz , , Xuv-Detektor Signale  20220403_004944.jpg
The Xuv-detector cabel channels seem to be 
wrongly labeled in the Messhütte (see 
picture) and are propably also wrongly 
Entry  Sun Apr 3 15:34:34 2022, Ken Ueberholz , , Xuv-Detektor CFD-treshhold 
I co controlled all detector signals and 
adjusted the threshold to be just above 
the noise. I will double check this when 
Entry  Thu Apr 7 04:48:58 2022, , , ToDo's for 07.04. 
Some ToDo's for the next shift:
- Work on  Laser stabilisation 2nd stage in the ESR
- Mesytec power supply of the xuv-detector crashed and needs to be restarted in the ESR. Simply turning it the crate off and on again)!!
Entry  Thu Apr 7 22:18:06 2022, Night shift 7.4-8.4, , Next scans 
DAQ1: lxg1927:/data.local2/BeamTimeTh22/
DAQ2: lxg0155:/data.local2/E142/
LMD file name DAQ1:229Thor
Entry  Fri Apr 8 09:33:52 2022, Dayshift 1 8.4.2022, , Reference Measurements 
DAQ1: lxg1297:/data.local2/BeamTimeTh22/
DAQ2: lxg0155:/data.local2/E142/
LMD file name DAQ1:229Thor
Entry  Fri Apr 8 11:02:04 2022, DW, YL, RSS, SL, , Change h=2 to h=1 
After changing to h=1
The frequency manipulation #5: f=242.021487MHz (124th harmonic) [no bunching]
Manipulation #7: f=242.021812 MHz [with bunching]
Entry  Fri Apr 8 15:45:24 2022, YL, , Spectrum manipulation 5 IMG_3027.JPG
See attached
Entry  Sat Apr 9 04:01:35 2022, Carsten, , 2nd DAQ 
Switched the CAEN TDC back on and changed the threshoolds for the ADC to: 

unsigned short caen_V785AH_threshold_mod0 [32] = 
Entry  Sat Apr 9 19:50:40 2022, Carsten, , New thresholds for ADC of DAQ2 (starting with file0117) 
unsigned short caen_V785AH_threshold_mod0 [32] = 
                {0x0100 , 0x0004 , 0x0003 , 0x0004 , 0x0005 , 0x0004 , 0x0006 , 0x0005 ,
                 0x0006 , 0x0005 , 0x0100 , 0x0100 , 0x0100 , 0x0100 , 0x0100 , 0x0100 ,
ELOG V3.1.5-fc6679b