137
|
Thu Apr 7 14:01:22 2022 |
Sebastian, Max | Detectors | Mesytec reset | The Mesytec crate was turned off and on again.
It is again possible to communicate with |
|
136
|
Thu Apr 7 11:11:31 2022 |
Max, Sebastian | Laser | dye changed, pulse energy measurements | We changed the dye at 10am.
We increased the pump power for the dye Laser |
|
135
|
Thu Apr 7 10:10:31 2022 |
Ragan, Yuri, Danyal | Accelerator | Problem in UNILAC | The power supply of the UNILAC magnet is broken.
The repair will take up to 6-7 hours. |
|
134
|
Thu Apr 7 09:58:55 2022 |
Ragan, Yuri, Danyal | Accelerator | Kicker problem solved | The kicker problem is solved and the beam
is back in the ESR. |
|
133
|
Thu Apr 7 09:23:18 2022 |
Sebastian | DAQ | DAQ1 & DAQ2 - 1kHz and delayed cs removed | Questionable 1kHz and delayed common stop
signals has been removed.
|
|
132
|
Thu Apr 7 08:43:19 2022 |
Danyal, Yuri, Ragan | Accelerator | again no injection in ESR - ESR kicker problem | we had no injections in the ESR again
it turned out that the injection kicker of |
|
131
|
Thu Apr 7 08:14:03 2022 |
Yuri & Danyal | General | 229Th89+ line in Schottky | GLOBAL calculations for the "content" of the
Th line in the Schottky spectrum
(380 MeV/u exit energy, equilibrium charge |
|
130
|
Thu Apr 7 07:40:09 2022 |
Danyal, Max, Sebastian | DAQ | No beam and DAQs crashed | since shortly after 7 AM we have no beam in
the ESR
(reason unclear)
|
|
129
|
Thu Apr 7 05:55:17 2022 |
Ken Ueberholz | Detectors | XUV-Detector Mesytec crash | When the XUV-detector has to shut down unexpectedly,
it can happen that the Mesytek power supply
crashes and can't be
|
|
128
|
Thu Apr 7 05:44:40 2022 |
Pierre-Michel, Ragan | DAQ | NTCAP settings | Carrier Frequency: 244M
IQ Rate: 10M
reference Level: -30
|
|
127
|
Thu Apr 7 05:23:50 2022 |
Patrick | DAQ | How To Start MBS for DAQ2 (Carstens DAQ) | (MBS server should be running at the LXG0155
machine. If not you will get an error message.
Then start the server - last command in console)
|
|
126
|
Thu Apr 7 04:48:58 2022 |
| | ToDo's for 07.04. | Some ToDo's for the next shift:
- Work on Laser stabilisation 2nd stage
in the ESR
|
|
125
|
Thu Apr 7 04:10:18 2022 |
Ken Ueberholz | DAQ | Corrected cabling DAQ 2 | A lot of cables were wrongly or not
connected to the DAQ 2.
|
|
124
|
Thu Apr 7 03:44:21 2022 |
Patrick | DAQ | Measurement procedure | [U][B]Measurement procedure[/B][/U]
|
|
123
|
Thu Apr 7 03:09:36 2022 |
Carsten | DAQ | NTCAP running since 02:40 | |
|
122
|
Thu Apr 7 03:06:15 2022 |
Patrick | DAQ | DAQ file sizes | The file sizes of DAQ1 (229Thor) and DAQ2
(229Th, "Carstens DAQ") are different.
During 20min of laser scanning DAQ1 saves |
|
121
|
Thu Apr 7 02:32:29 2022 |
all on shift | Runs | First Scans 322-320nm | Laser scanning from 322-320 steps 0.01nm/s
DAQ1: lxg1927:/data.local2/BeamTimeTh22/
DAQ2: lxg0155:/data.local2/E142/
|
|
120
|
Thu Apr 7 01:19:05 2022 |
Patrick | Laser | Laser scanning | We did some laser scans. The wavemeter shows
spikes during scans. This may be just while
the frequency changes. See picture. |
|
119
|
Thu Apr 7 00:36:36 2022 |
Uwe | DAQ | Threshholds and shaping Mesytec for ADC | |
|
118
|
Thu Apr 7 00:15:11 2022 |
Patrick | Laser | Laser timing adjusted | We have adjusted the laser timing using PMT-middle.