| ID | Date | Author  | Category | Subject | Text |  | 
| 235 | Fri Apr 15 20:43:18 2022 | Konstantin | Laser | Dye changed | Dye of the laser system has been changed. UV laser power increased from ~8 mJ to 11
 mJ pulse energy.
 |  | 
| 67 | Sat Apr  2 17:47:16 2022 | Ken Ueberholz |  | Telefon, Gästehaus | My guesthouse phone number: 06159-71-2957 |  | 
| 73 | Sun Apr  3 00:41:45 2022 | Ken Ueberholz |  | Xuv-Detektor Signale | The Xuv-detector cabel channels seem to be 
 wrongly labeled in the Messhütte (see
 |   | 
| 81 | Sun Apr  3 15:34:34 2022 | Ken Ueberholz |  | Xuv-Detektor CFD-treshhold | I co controlled all detector signals and adjusted the threshold to be just above
 the noise. I will double check this when
 |  | 
| 115 | Wed Apr  6 19:39:08 2022 | Ken Ueberholz | Detectors | LED installed | The UV-LED of Münster was connected over channel 8 to the Messhütte. 6V are
 supplied by the power supply (picture 2).
 |    | 
| 116 | Wed Apr  6 21:03:25 2022 | Ken Ueberholz | Detectors | Xuv-Detektor, further information | Some further information regarding the xuv-detector and its components.
 |   | 
| 84 | Mon Mar 24 06:22:21 104 | Ken Ueberholz | Detectors | XUV-Detector Rates | Count rates were measured for the XUV- detector for a full circle:
 Cathode: -5V, shields: 0V, main coil 8A,
 |     | 
| 37 | Tue Mar 29 12:47:26 2022 | Ken Ueberholz |  | Parameter setting for XUV and copper mirror detector | Some Default Settings for the XUV Detector. The copper
 mirror should always move fully in.
 |  | 
| 85 | Mon Apr  4 00:19:16 2022 | Ken Ueberholz | DAQ | FirstTests | New measurement: Start: About 00:12
 Stop: About 00:43
 |    | 
| 125 | Thu Apr  7 04:10:18 2022 | Ken Ueberholz | DAQ | Corrected cabling DAQ 2 | A lot of cables were wrongly or not connected to the DAQ 2.
 
 |   | 
| 129 | Thu Apr  7 05:55:17 2022 | Ken Ueberholz | Detectors | XUV-Detector Mesytec crash | When the XUV-detector has to shut down unexpectedly, it can happen that the Mesytek power supply
 crashes and can't be
 |  | 
| 146 | Fri Apr  8 01:18:51 2022 | Ken Ueberholz | DAQ | TODO: DAQ improvements | For somebody who knows the DAQ1 code: Go4 resets the histograms with each laser step.
 Can there be additional histograms where
 |  | 
| 41 | Thu Mar 31 13:28:17 2022 | Jan Glorius | DAQ | DAQ-2 cabling docu | newest version V2 - valid since Mo 04.April 2022
 |     | 
| 62 | Sat Apr  2 01:27:25 2022 | Jan Glorius | Runs | test runs 02.04.2022 | Beam settings: primary beam
 copper stripper
 |   | 
| 90 | Mon Apr  4 17:26:48 2022 | Jan Glorius | DAQ | MSCF shaper settings | attached are the current shaper settings. 
 list of currently connected channels:
 |   | 
| 15 | Thu Mar 10 15:20:26 2022 | Jan | DAQ | analog branch signal patches to Messhütte | The additional signals from PMTs and XUV detector needed for spectroscopic analysis in the
 second DAQ are patched to AP Messhütte (MH)
 |       | 
| 27 | Mon Mar 21 21:48:46 2022 | Jan | DAQ | MesyTec Shaper Control | The MesyTec Shaper & Constant Fraction (MSCF) is used to process the PMT/det signals for
 the ADC in the second DAQ.
 |  | 
| 156 | Fri Apr  8 09:33:52 2022 | Dayshift 1 8.4.2022 |  | Reference Measurements | DAQ1: lxg1297:/data.local2/BeamTimeTh22/ DAQ2: lxg0155:/data.local2/E142/
 LMD file name DAQ1:229Thor
 |  | 
| 132 | Thu Apr  7 08:43:19 2022 | Danyal, Yuri, Ragan | Accelerator | again no injection in ESR - ESR kicker problem | we had no injections in the ESR again 
 it turned out that the injection kicker of
 |  | 
| 130 | Thu Apr  7 07:40:09 2022 | Danyal, Max, Sebastian | DAQ | No beam and DAQs crashed | since shortly after 7 AM we have no beam in the ESR
 (reason unclear)
 |  |