HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  nuclear two-photon decay, Page 10 of 11  Not logged in ELOG logo
Entry  Fri May 7 07:02:33 2021, Guy Leckenby, Analysis, Online Monitoring Plots E143_spec_1sec.png
In compliment to Liliana's plots, this is the summed spectra I calculated from 0338 to 0507.
Entry  Fri May 7 06:53:56 2021, Akash, Liliana, Analysis, Some plots 6x
Some plots of statistics up to now
Entry  Fri May 7 04:39:00 2021, Liliana, Akash, Wolfram, Helmut, Shahab, Runs, Data taking starts 
File start being recorded at 4:38 am 
Sync with the server is working. 
Entry  Fri May 7 04:26:54 2021, Shahab, Runs, 245 MHz resonator extra 20dB gain off 
made sure that the extra 20dB amplifier is off.
Entry  Fri May 7 04:01:51 2021, Shahab, Runs, Picture after scraping pic.jpg
this picture is after scraping by helmut, showing the 410 MHz detector, that is we would expect an isomer where the marker M1 is, i.e. at 2.2kHz on the
left side, which we unfortunately don’t see (yet).
Entry  Fri May 7 03:51:56 2021, Shahab, Analysis, peak frequencies New_Doc_6_1.jpgNew_Doc_6_2.jpg
a reference schematic of the peaks on 410 MHz (211th harmonic) and 245 MHz (126th harmonic)
Entry  Fri May 7 03:46:58 2021, Liliana, Akash, Wolfram, Helmut, Shahab, General, Scraper settings IMG_20210507_034213_resized_20210507_034848181.jpg
Scraper settings have been played around with to try and remove satellite lines...

Helmut has now set scraper id GE01DS_H at -45mm (in position)
Entry  Fri May 7 03:44:55 2021, Helmut Weick, Accelerator, scraper optimisation 
Opened TE4 slits again to +/-10mm.

Then we tried different scrapers:
Entry  Fri May 7 03:33:11 2021, Liliana, Akash, Wolfram, Helmut, Shahab, General, status 
At the moment we see a second peak to the left of each intense line. 
The distance between the main peak and the shadow is roughly the same for each peak.
This hints to a sharp fall in the isochronicity curve.
Entry  Fri May 7 02:01:08 2021, Liliana, Akash, Wolfram, Helmut, Shahab, Accelerator, Beam issues for short duration 
RFQ fall-out (HKR working on it...)

Beam stop time: 01.58am
Entry  Fri May 7 01:49:03 2021, Rui-Jiu Chen, DAQ, Comparison of I_Raw/Q_Raw between different reference level  20210501_NTCAPPreparation.png
This is a comparison of I_Raw/Q_Raw between different reference level. The range of NTCAP ADC is only 2^15 bit. So signals (I_Raw and Q_Raw) should 
not be outside ADC range. It is clear that there is not point outside the ADC range when using reference level -30dBm.
Entry  Fri May 7 01:47:36 2021, Ragan, Rui-Jiu, DAQ, Change reference level to -30dBm  
Reference Level: -30 dBm.

Start taking data.
Entry  Fri May 7 01:44:24 2021, Rui-Jiu Chen, DAQ, Change reference level to -40dBm 
Reference Level: -40 dBm.

Start taking data.
Entry  Fri May 7 01:07:27 2021, Helmut Weick, Analysis, maybe frequency ID frequencies.JPG
We think we see the frequency range of A/q=2.25 at 243.1 MHz.
This would correspond to L=108.2m and E=386.4 MeV/u (gamma_t = 1.3955) at h = 126.
Path length is a bit short, for L=108.4m it should be 370.6 MeV/u. 
Entry  Thu May 6 23:06:18 2021, Rui-Jiu Chen, DAQ, Change reference level to -50dBm 
Beam is secondary beam now. The intensity is lower. Change reference level to -50dBm.
Carrier frequency:245MHz
IQ rate(S/s): 20M.
Entry  Thu May 6 22:05:30 2021, Helmut, Accelerator, Beamline and ESR data sets for 72Ge setting 2021-05-06_22-07-09_SIS18_FAST_20210506_ESR_78KR32.C1.txt2021-05-06_22-07-52_ESR_EXP21_06_ISO_78Kr_05May21.C1.txt
parammodi exports, E-SIS = 441.0 MeV/u with Be-1840 mg/cm² target in, isoc. ESR, at least we see fragments
Entry  Thu May 6 21:45:30 2021, Helmut, Detectors, beam position on TE5 grids 2021-05-06_21-32-36-171.png
The two grids do not work very well, one x position is opposite to the other.
But at least a guidance for the future, this was good injection of 78Kr with a thick Be target.
Entry  Thu May 6 21:36:04 2021, Regina + Markus + Yuri, Accelerator, Cooler Curve cc_1.jpg
Final cooler curve, Isochronous 78Kr
Entry  Thu May 6 21:26:02 2021, Yuri et al., Accelerator, Energies 
gamma_t = 1.3955
Br(72Ge) corresponds to 6.79575 Tm
E (Kr) at Br(72Ge) = 392.9 MeV/u
Entry  Thu May 6 18:21:42 2021, Ragan, Rui-Jiu, DAQ, NTCAP started again IMG_20210506_182118.jpgIMG_20210506_182017.jpg
NTCAP was stopped at 17:34 for the optimisation purpose.
NTCAP started again at 18:20 with the change in Reference Level (dBm): 0
ELOG V3.1.5-fc6679b