HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  nuclear two-photon decay, Page 11 of 12  Not logged in ELOG logo
Entry  Wed Jun 30 12:35:53 2021, Rui-Jiu Chen, Analysis, Change reference level to -20dBm. Turn of amplifier. 
SC_2021-06-30_12_35_52
IQ_2021-06-30_12_35_43
Reference level=-20dBm
Entry  Sat May 8 18:35:25 2021, Rui-Jiu Chen, DAQ, Change reference level to -10dBm 
The beam in ESR is 78Kr36+@476 MeV/u.
Start a new run:
SC_2021-05-08_18-25-52
IQ_2021-05-08_18-25-52
Entry  Fri Jul 2 14:18:04 2021, Pavlos, Alexandre, Runs, Change of the measurment to 72Br 
Both resonators will now be retuned to look for the isomeric state in 72Br.

Last files for 70Se are:
245MHz-2021.07.02.14.17.14.507.tiq
410MHz-2021.07.02.14.16.48.528.tiq
Entry  Fri Jul 2 13:37:00 2021, Pavlos, Alexandre, DAQ, Change of the measurement time from 10s to 20s 
Last files with the measurement time of 10s for the two resonators are:

245MHz-2021.07.02.13.36.00.674.tiq
410MHz-2021.07.02.13.35.34.758.tiq
Entry  Thu Jul 1 23:38:55 2021, IK, KK, Runs, Change of gas bottle 
The gas bottle has been changed and the beam is back.
Entry  Sun May 9 13:53:07 2021, Yuri, Wolfram, Andrew, Liliana, Calibration, Change of energy: Back as before Screenshot_2021-05-09_13-59-36.png
After looking at the spectrum it was concluded that the same isotopes, and no more, could be identified. 
Now we change the energy back to 441.7 MeV/u and will open the scrappers to see if Mn comes in. 

The picture shows the effect of going back to the previous energy and then the effect of opening the scrappers
Entry  Thu May 6 22:05:30 2021, Helmut, Accelerator, Beamline and ESR data sets for 72Ge setting 2021-05-06_22-07-09_SIS18_FAST_20210506_ESR_78KR32.C1.txt2021-05-06_22-07-52_ESR_EXP21_06_ISO_78Kr_05May21.C1.txt
parammodi exports, E-SIS = 441.0 MeV/u with Be-1840 mg/cm² target in, isoc. ESR, at least we see fragments
Entry  Fri May 7 09:36:32 2021, Ragan, Andrew, Yuri, General, Beam stop at 0928, adjust scope 
It was requested from the SIS to stop the beam at 09:28 
Yuri is adjusting the scope in order to avoid UFO (unidentified frequency object)
Entry  Sat Jul 3 08:12:22 2021, Dima, Yuri, General, Beam stop 
We stopped the beam at 08:10

The latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000778
 p:\E143\iq\IQ_2021-06-30_23-27-34\0003806
2. The rest space on the drive "p:\" : 20,0 TByte
Entry  Fri May 7 02:01:08 2021, Liliana, Akash, Wolfram, Helmut, Shahab, Accelerator, Beam issues for short duration 
RFQ fall-out (HKR working on it...)

Beam stop time: 01.58am

Beam resumption: 02.02am
Entry  Fri May 7 23:08:44 2021, Michael, Kanika, Accelerator, Beam issues for short duration 
The beam was lost for a few minutes from 23:01 to 23:06. It is back now.
Entry  Sun May 9 04:15:50 2021, Michele, Jacobus, Shahab, Runs, Beam issues for short duration 
ESR warning (colour red in the panel)

Operator intervention required. 

Runs affected by this issue: 

-from E143-245MHz-2021.05.09.02.49.48.521 (03:50) 
-to E143-245MHz-2021.05.09.02.54.54.239 (03:54) .  



  
Entry  Fri May 7 14:33:23 2021, Andrew Ragan Yuri , General, Beam is back 
 
Entry  Mon May 10 01:01:59 2021, Kanika, Alex, RuiJiu, General, Beam is back 
The issue has been resolved and the beam is back since 00:56.
Entry  Thu Jul 1 04:15:54 2021, David, Liliana, General, Beam intensity 
From 4:05 to 4:15 beam intensity was 1/2 as before. 
Entry  Thu Jul 1 07:28:55 2021, Jan, Akash, Accelerator, Beam intensity 
Intensity went up from 5e8 to 1e9 extracted particles from SIS.
Entry  Sat May 8 15:18:23 2021, Michael, Wolfram, Yuri, General, Beam Settings changing 
Beam settings are being changed back to 78Kr beam at 467 Mev/u. 
Entry  Thu May 6 14:28:32 2021, Helmut Weick, Calibration, Be target thickness calibration -> 1839 mg/cm^2 
Injection was optimized before with Cu-40 mg/cm^2 stripper.
This reduces energy of 78Kr from 370 MeV/u -> 386.52 MeV/u.
To keep the same ESR injetion the SIS energy was raised with Be 10mm tatget.
For exactly 1850 mg/cm^2 a SIS-energy of 445.46 MeV/u would be needed. A scan of SIS energy resulted in 445.0 MeV/u as optimal.
This means target thickness is close to 1850 mg/cm^2, we can call it 1839 mg/cm^2.
Entry  Fri May 7 12:37:35 2021, Ragan, Andrew, Yuri, Alex, General, Back with beam  
We are back with the beam in the ESR since 12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
E02DS3HG = - 35 mm
EEXDS2HA = - 25 mm
EEXDS1HA = - 25 mm
E01DS_H = - 40 mm

For E02DS3HG a reset in the control system needed to be done.
Entry  Sun May 9 12:53:01 2021, Desislava Kalaydjieva, Taka Yamaguchi, Analysis, Analysis, Morning shift, 9 May 9x
For the whole morning shift there were no significant changes in the spectra.

Some of the obtained histograms are attached below. 
The python code was used and the histogram was plotted in ROOT with log y scale. 
The time, the used code options and the data type are marked in the filenames or in the description below. 

Attachment 1-4: 245MHz, options used " -s 5.1 -t 0.5 ", time marked in the filename (time as in the title of the files on the server (-1h of the real time)).

Attachment 5: 410MHz, with the same options for the python code, real time names. It is different from 245MHz histogram.
Attachment 6: Comparison between 245MHz histogram and 410MHz histogram for real time 10:00 - 11:00.
Note: This difference is observed in the histograms from the early morning hours too (checked up to 4 o'clock).

Attachment 7: 245MHz data, with options "-s 5.0 (Red) / -s 5.05 (Green) / -5.1 (Blue) -t 0.5" (real time 08:00 - 09:00)
Attachment 8: 245MHz data, with options "-s 5.0 (Red) / -s 5.05 (Green) / -5.1 (Blue) -t 0.1" (real time 08:00 - 09:00)
Attachment 9: 410MHz data, with options "-s 5.0 (Red) / -s 5.05 (Green) / -5.1 (Blue) -t 0.5" (real time 08:00 - 09:00)
ELOG V3.1.5-fc6679b