HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 12 of 12  Not logged in ELOG logo
ID Date Author Category Subjectdown Text Attachments
  179   Thu Jul 1 20:35:21 2021 Andrew Nic ShahabDAQAcquisition stopped Checking if signal can be further amplified

  
  180   Thu Jul 1 20:48:58 2021 Shahab Andrew NicDAQAcquisition started15dB amplifier on 410MHz    
  36   Fri May 7 08:04:22 2021 Carlo Bruno, Desislava KalaydjievaAnalysis7:00 - 14:00 analysis shift(See
https://triumfoffice365-my.sharepoint.com/:w:/g/personal/dillmann_triumf_ca/Eb_LCp7yTx5Bgc8TO8khJmEBWeS-ycdPRnG02wQout-fgQ?rtime=3n3A3xMR2Ug
for remote shifter instructions. To be updated/corrected
 15x 
  140   Tue Jun 29 21:10:30 2021 ShahabRuns72-Ge settingthe new setting is roughly 400 khz lower in
frequency.
Previous beam time Ge was on 243.100 now
  
  220   Fri Jul 2 20:33:44 2021 YuriAccelerator70Se setting with closed scrapersWe tune back to 70Se.
The scrapers stay closed at EEXDS2HA=0 mm,
EEXDS1HG=+5 mm
  
  65   Sat May 8 01:43:23 2021 Helmut WeickAccelerator70Se settingIf gamma_t = 1.3955 Tm stays, we will need
Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be
  
  147   Wed Jun 30 08:59:37 2021 YuriAccelerator70Se settingX(9Be)=1.815 g/cm2 (adjusted in primary beam
setting)
  
  31   Fri May 7 04:26:54 2021 ShahabRuns245 MHz resonator extra 20dB gain offmade sure that the extra 20dB amplifier is
off.
  
  151   Wed Jun 30 13:04:40 2021 ShahabRuns245 Amplifier onturned on extra 20dB amplifier for the 245
Resonator around 12:32 
 amplification_on245.png 
  202   Fri Jul 2 07:31:44 2021 The remote Canadian eager beavers (Iris and Guy)Analysis00h to 05h Summed SpectraUsing the scripts I posted previously, I summed
5.5 hours of data from midnight to 5:30 July
2nd CEST. 
 245MHz-07.02.00-05h-sum_10ms.png245MHz-07.02.00-05h-sum_10ms_zoom.png410MHz-07.02.00-05h-sum_10ms.png410MHz-07.02.00-05h-sum_10ms_zoom.png 
  83   Sat May 8 21:42:51 2021 AllAccelerator Set up for 52MnDetails will follow
E(Mn) = 368.41 MeV/u
  
ELOG V3.1.5-fc6679b