HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  nuclear two-photon decay, Page 2 of 12  Not logged in ELOG logo
IDup Date Author Category Subject
  22   Fri May 7 01:44:24 2021 Rui-Jiu ChenDAQChange reference level to -40dBm
Reference Level: -40 dBm.

Start taking data.
SC_2021-05-07_00-06-57
IQ_2021-05-07_00-06-57
  23   Fri May 7 01:47:36 2021 Ragan, Rui-JiuDAQChange reference level to -30dBm
Reference Level: -30 dBm.

Start taking data.
SC_2021-05-07_00-11-24
IQ_2021-05-07_00-11-24
  24   Fri May 7 01:49:03 2021 Rui-Jiu ChenDAQComparison of I_Raw/Q_Raw between different reference level
This is a comparison of I_Raw/Q_Raw between different reference level. The range of NTCAP ADC is only 2^15 bit. So signals (I_Raw and Q_Raw) should 
not be outside ADC range. It is clear that there is not point outside the ADC range when using reference level -30dBm.
Attachment 1: 20210501_NTCAPPreparation.png
20210501_NTCAPPreparation.png
  25   Fri May 7 02:01:08 2021 Liliana, Akash, Wolfram, Helmut, ShahabAcceleratorBeam issues for short duration
RFQ fall-out (HKR working on it...)

Beam stop time: 01.58am

Beam resumption: 02.02am
  26   Fri May 7 03:33:11 2021 Liliana, Akash, Wolfram, Helmut, ShahabGeneralstatus
At the moment we see a second peak to the left of each intense line. 
The distance between the main peak and the shadow is roughly the same for each peak.
This hints to a sharp fall in the isochronicity curve.
Helmut now tries to remove these shadows by using different scrappers. 
  27   Fri May 7 03:44:55 2021 Helmut WeickAcceleratorscraper optimisation
Opened TE4 slits again to +/-10mm.

Then we tried different scrapers:
in south arc outside: E02DS3HG, cuts at ~ -25mm, at -15mm gone, leave at -35mm.

on straight section: EEXDS2HA cuts at ~ -25mm, leave at -25mm.

EEXDS1HA, closing it to -25mm revealed a double peak structure with distance just like the wanted isomer (-2.2MHz at h=211).
But it is present on all intense peaks at the same distance, so it must be an artefact of a strange isochronicity curve.
Closing it to -15mm even had only the smaller lower frequency line survive.
But then it must be also possible to have only the stronger line. leave at -25mm

This worked with scraper in north arc E01DS_H which can cut from both sides.
The insie can ve iused to cut the lower Brho, 
at -50mm still two peaks, at -45mm left peak almost gone, -40mm left peak gone but right still intense, leave at -40mm.

-> Lower Brho seems to be clearly related to lower frequency, higher Brho side is not so clearly related to frequency.

Measure in this setting, nice void at wanted frequency. But no isomers appear so far.
 
  28   Fri May 7 03:46:58 2021 Liliana, Akash, Wolfram, Helmut, ShahabGeneralScraper settings
Scraper settings have been played around with to try and remove satellite lines...

Helmut has now set scraper id GE01DS_H at -45mm (in position)

Image of injection structure attached... 72Ge is the isotope in focus on the RSA
Attachment 1: IMG_20210507_034213_resized_20210507_034848181.jpg
IMG_20210507_034213_resized_20210507_034848181.jpg
  29   Fri May 7 03:51:56 2021 ShahabAnalysispeak frequencies
a reference schematic of the peaks on 410 MHz (211th harmonic) and 245 MHz (126th harmonic)
Attachment 1: New_Doc_6_1.jpg
New_Doc_6_1.jpg
Attachment 2: New_Doc_6_2.jpg
New_Doc_6_2.jpg
  30   Fri May 7 04:01:51 2021 ShahabRunsPicture after scraping
this picture is after scraping by helmut, showing the 410 MHz detector, that is we would expect an isomer where the marker M1 is, i.e. at 2.2kHz on the left side, which we unfortunately don’t see (yet).
Attachment 1: pic.jpg
pic.jpg
  31   Fri May 7 04:26:54 2021 ShahabRuns245 MHz resonator extra 20dB gain off
made sure that the extra 20dB amplifier is off.
  32   Fri May 7 04:39:00 2021 Liliana, Akash, Wolfram, Helmut, ShahabRunsData taking starts
File start being recorded at 4:38 am 
Sync with the server is working. 

Be aware that the timestamp of the files is 1h behind with respect to real time
  33   Fri May 7 06:53:56 2021 Akash, LilianaAnalysisSome plots
Some plots of statistics up to now
Attachment 1: time1sec.png
time1sec.png
Attachment 2: time0.5sec.png
time0.5sec.png
Attachment 3: time2sec.png
time2sec.png
Attachment 4: 0.5seg.png
0.5seg.png
Attachment 5: 1sec.png
1sec.png
Attachment 6: 2sec.png
2sec.png
  34   Fri May 7 07:02:33 2021 Guy LeckenbyAnalysisOnline Monitoring Plots
In compliment to Liliana's plots, this is the summed spectra I calculated from 0338 to 0507.
Attachment 1: E143_spec_1sec.png
E143_spec_1sec.png
  35   Fri May 7 07:52:12 2021 Ragan, AndrewGeneralTo change trigger position
Xiangcheng suggested to change the trigger position in order to start the file with the injection. Nothing is changed at the moment. Maybe Shahab or Yuri can do it when they arrive.
  36   Fri May 7 08:04:22 2021 Carlo Bruno, Desislava KalaydjievaAnalysis7:00 - 14:00 analysis shift
(See
https://triumfoffice365-my.sharepoint.com/:w:/g/personal/dillmann_triumf_ca/Eb_LCp7yTx5Bgc8TO8khJmEBWeS-ycdPRnG02wQout-fgQ?rtime=3n3A3xMR2Ug
for remote shifter instructions. To be updated/corrected by the experts)

08:00 Analysed data from 6 am to 7 am  (Note file names are one hour behind).
Using e143_analyzer.py -t 0.5 E143-245MHz-2021.05.07.05.*
See attachments 1,2,3

08:17 Analysed data from 7am to 8am (Note file names are still one hour behind)
As above.
See attachments 4,5,6

Analysed data from 8am to 9am (Note file names are still one hour behind)
As above.
See attachment 7

At 8:50 Yury changes trigger on scope from 50% to 1% (minimum value).
We should now have the beginning of the injection as well, and isomers should appear at 0.1 s

9:35 Lost beam from SIS

09:45 Analysed data from 9am to 9:30 am (Note file names are still one hour behind)
These are the first data with the new trigger settings
As above
See attachment 8

11:50 Beam is back, scraper being optimised.
12:30 Scraper optimisation complete.

13:00 Analysed data from 12:30 to 12:45 roughly.
Attach 9 - default code. -t 0.5
Attach 10 - new untested code with skip function. See Slack#analysis. -t 0.5 -s 0.2
Attach 11 - as 10, log scale on the y

13:48 Analysed data from to 12:30 to 13:35
-t 0.5 Attach 12
-t 1 Attach 13 (log y) 

14:05 Lost beam in ESR

14:30 Analysed data from 13:00 to 14:00 before we lost beam.
-t 0.2 -s 0.1
Attach 13 & 14

14:35 Beam is back 

15:00 Shift handed over to AG and CJC
Attachment 1: 210507_6am.png
210507_6am.png
Attachment 2: 210507_6am_zoom.png
210507_6am_zoom.png
Attachment 3: 210507_6am_log.png
210507_6am_log.png
Attachment 4: 210507_7am.png
210507_7am.png
Attachment 5: 210507_7am_zoom.png
210507_7am_zoom.png
Attachment 6: 210507_7am_log.png
210507_7am_log.png
Attachment 7: 210507_8am_log.png
210507_8am_log.png
Attachment 8: 210507_9-9.30am_log.png
210507_9-9.30am_log.png
Attachment 9: 11.30_11.45_t0.5.png
11.30_11.45_t0.5.png
Attachment 10: 12am_t0.5_s0.2.png
12am_t0.5_s0.2.png
Attachment 11: 12am_t0.5_s0.2_log.png
12am_t0.5_s0.2_log.png
Attachment 12: 11.23_12.30.png
11.23_12.30.png
Attachment 13: 1_11.23_12.30_log.png
1_11.23_12.30_log.png
Attachment 14: 1pm_0.2_0.1png.PNG
1pm_0.2_0.1png.PNG
Attachment 15: 1pm_0.2_0.1_zoom.PNG
1pm_0.2_0.1_zoom.PNG
  37   Fri May 7 08:55:33 2021 Ragan, Andrew, YuriGeneralTrigger changed
Trigger for both the spectrum analyzers is changed from 50% to 1% by Yuri.
For this, the ESR pattern was stopped at 08:50 and was started back at 08:53.
Attachment 1: photo_2021-05-07_08-58-58.jpg
photo_2021-05-07_08-58-58.jpg
  38   Fri May 7 09:36:32 2021 Ragan, Andrew, YuriGeneralBeam stop at 0928, adjust scope
It was requested from the SIS to stop the beam at 09:28 
Yuri is adjusting the scope in order to avoid UFO (unidentified frequency object)
  40   Fri May 7 09:56:43 2021 YuriCalibrationIdentification Verification
With closed scrapers there are only a few weak lines.
Open temporarily all scrapers in the ESR to write down the frequencies. 
  41   Fri May 7 09:58:04 2021 YuriAcceleratorSetting up KO extraction for Caves
SIS optimisation requires us to stop. Only sporadic shots.
  42   Fri May 7 10:05:06 2021 YuriAcceleratorE02DS3HG does not drive
E02DS3HG stays at -35 mm and does not react
ELOG V3.1.5-fc6679b