43
|
Fri May 7 10:46:40 2021 |
Yuri | Accelerator | GE02DS3HG |
The scraper is blocked at -10 mm and -unfortunately- blocks the beam in the ESR. Uli Popp is taking care. |
44
|
Fri May 7 11:40:20 2021 |
Ragan, Andrew, Yuri | General | Scraper is fixed - optimisation stage |
Scraper is fixed, we start again. Scraper open to let everything through |
45
|
Fri May 7 12:37:35 2021 |
Ragan, Andrew, Yuri, Alex | General | Back with beam |
We are back with the beam in the ESR since 12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
E02DS3HG = - 35 mm
EEXDS2HA = - 25 mm
EEXDS1HA = - 25 mm
E01DS_H = - 40 mm
For E02DS3HG a reset in the control system needed to be done. |
46
|
Fri May 7 14:06:02 2021 |
Yuri | Accelerator | SIS kicker failure |
|
47
|
Fri May 7 14:33:23 2021 |
Andrew Ragan Yuri | General | Beam is back |
|
48
|
Fri May 7 16:09:50 2021 |
Yuri | Accelerator | Stop, change of sextuple settings |
|
49
|
Fri May 7 16:17:21 2021 |
Sergey, Yuri, Wolfram, Shahab | Runs | new sextupole setting |
new sextupole setting, isomer not visible yet. |
50
|
Fri May 7 17:02:51 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | new sextupole setting 2 |
There is new sextupole settings, but the scrapers remain like last night (Helmut setting last night.) |
51
|
Fri May 7 17:12:14 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | Energy change -6 MeV/u |
changed the energy down to 435 MeV/u |
52
|
Fri May 7 17:12:52 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | trigger time back to 50% |
changed trigger time back to 50%
last file with 1% trigger:
245 MHZ 2021.05.07.16.07.03.493
410 MHz 2021.05.07.17.07.21.104
p.s. remember the 245 Analyzer has a 1 hour offset in time stamp because of daylight saving time in win10 setting |
53
|
Fri May 7 17:35:22 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | Energy change +6 MeV/u |
We will now go up in energy to 447 MeV (+6 MeV) from the original energy
last file name with previous energy:
245: 2021.05.07.16.33.47.178
410: 2021.07.05.17.34.04.780 |
54
|
Fri May 7 18:08:35 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | going back to the original energy |
going back to the original energy 441 MeV/u
last filenames with the previous energy:
245: 2021.05.07.17.07.00.543
410: 2021.05.07.18.07.18.037 |
55
|
Fri May 7 18:43:13 2021 |
Kanika, Michael, Shahab | Runs | cave M experiment needs more spills |
our pattern causes beam loss while scanning the biological probes in the Cave M bio experiment. They loose every other spill due to high request rate from ESR.
For the next 2 hours, the operators have changed the spill pattern that as long as they are scanning , we get only every 1 minute, otherwise we get our 15 seconds as usual.
after two hours this situation should be tuned back to the original spill pattern. |
Attachment 1: rep.jpg
|
|
56
|
Fri May 7 19:56:10 2021 |
Kanika, Michael, Shahab | Runs | ZOOM session restart |
restart zoom session |
57
|
Fri May 7 20:28:32 2021 |
Kanika, Michael, Shahab | Analysis | Some pictures from the 410 detector |
some pics. |
Attachment 1: E143-410MHz-2021.05.07.20.21.32.783.tiq.png
|
|
Attachment 2: E143-410MHz-2021.05.07.20.21.44.827.tiq.png
|
|
Attachment 3: E143-410MHz-2021.05.07.20.21.56.869.tiq.png
|
|
Attachment 4: E143-410MHz-2021.05.07.20.22.08.911.tiq.png
|
|
Attachment 5: E143-410MHz-2021.05.07.20.22.20.952.tiq.png
|
|
Attachment 6: E143-410MHz-2021.05.07.20.22.32.993.tiq.png
|
|
Attachment 7: E143-410MHz-2021.05.07.20.22.45.037.tiq.png
|
|
Attachment 8: E143-410MHz-2021.05.07.20.22.59.920.tiq.png
|
|
Attachment 9: E143-410MHz-2021.05.07.20.23.17.103.tiq.png
|
|
58
|
Fri May 7 20:34:27 2021 |
Kanika, Michael, Shahab | Runs | back to 15 sec recording |
now we are going back to 15 sec operation. Cave M (bio) operation is over |
59
|
Fri May 7 22:00:36 2021 |
Chris | Accelerator | brief beam loss |
Brief interruption in beam, ~21:42-21:51. |
60
|
Fri May 7 22:48:33 2021 |
Chris | General | still running... |
In anticipation of the imminent shift change, a snapshot of how things look. |
Attachment 1: E143-245MHz-2021.05.07.21.46.10.889.tiq.png
|
|
Attachment 2: Zoom_screenshot.PNG
|
|
61
|
Fri May 7 23:08:44 2021 |
Michael, Kanika | Accelerator | Beam issues for short duration |
The beam was lost for a few minutes from 23:01 to 23:06. It is back now. |
62
|
Sat May 8 00:38:55 2021 |
Philipp, Marta | General | Screenshot |
|
Attachment 1: Screenshot_2021-05-08_at_00.32.16.png
|
|