| ID | Date | Author | Category  | Subject | Text |  | 
| 218 | Fri Jul  2 19:57:12 2021 | Shahab, Yuri, Wolfram, Liliana | Runs | stop DAQ | At 19:56 the DAQ is stopped. The plan is to go back to the setting for
 Se.
 |  | 
| 219 | Fri Jul  2 20:01:16 2021 | Liliana | Runs | Some plots from the Br setting |  | 6x   | 
| 11 | Thu May  6 14:30:23 2021 | W. Korten | General | Target thickness | Thickness of the Carbon target in the TE line has been measured by centering the primary
 78Kr beam in the ESR:
 |  | 
| 14 | Thu May  6 17:48:48 2021 | W. Korten, Helmut | General | ESR setting for 72Ge ions with primary beam | Setting the 78Kr (after the target) to the Brho of the 72Ge beam at 368.4 MeV/u (gamma=1.3955),
 i.e. 6.79575 Tm, which leads to an energy
 |  | 
| 26 | Fri May  7 03:33:11 2021 | Liliana, Akash, Wolfram, Helmut, Shahab | General | status | At the moment we see a second peak to the left of each intense line.
 The distance between the main peak and the
 |  | 
| 28 | Fri May  7 03:46:58 2021 | Liliana, Akash, Wolfram, Helmut, Shahab | General | Scraper settings | Scraper settings have been played around with to try and remove satellite lines...
 
 |   | 
| 35 | Fri May  7 07:52:12 2021 | Ragan, Andrew | General | To change trigger position | Xiangcheng suggested to change the trigger position in order to start the file with
 the injection. Nothing is changed at the
 |  | 
| 37 | Fri May  7 08:55:33 2021 | Ragan, Andrew, Yuri | General | Trigger changed | Trigger for both the spectrum analyzers is changed from 50% to 1% by Yuri.
 For this, the ESR pattern was stopped at
 |   | 
| 38 | Fri May  7 09:36:32 2021 | Ragan, Andrew, Yuri | General | Beam stop at 0928, adjust scope | It was requested from the SIS to stop the beam at 09:28
 Yuri is adjusting the scope in order to avoid
 |  | 
| 44 | Fri May  7 11:40:20 2021 | Ragan, Andrew, Yuri | General | Scraper is fixed - optimisation stage | Scraper is fixed, we start again. Scraper open to let everything through
 |  | 
| 45 | Fri May  7 12:37:35 2021 | Ragan, Andrew, Yuri, Alex | General | Back with beam | We are back with the beam in the ESR since 12:30
 ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
 |  | 
| 47 | Fri May  7 14:33:23 2021 | Andrew Ragan Yuri | General | Beam is back |  |  | 
| 60 | Fri May  7 22:48:33 2021 | Chris | General | still running... | In anticipation of the imminent shift change, a snapshot of how things look.
 |    | 
| 62 | Sat May  8 00:38:55 2021 | Philipp, Marta | General | Screenshot |  |   | 
| 63 | Sat May  8 01:06:19 2021 | Philipp, Marta | General | Screenshot | The signal of the transformer on the lower right panel is not really beam related. It
 is mostly noise. Changes are not so expected
 |   | 
| 68 | Sat May  8 07:14:00 2021 | Akash, Nic, Jelena, Zsolt | General | Morning shift entry | Things look ok. No settings have been changed... 
 Analysis attempts are going on...
 |  | 
| 69 | Sat May  8 07:34:08 2021 | Akash, Nic, Jelena, Zsolt | General | Zoom has its own mind | Zoom kicked us all out... we managed to get back in...screen sharing is back on.
 |  | 
| 70 | Sat May  8 08:12:02 2021 | Akash, Nic, Jelena, Zsolt | General | SIS, ESR time structure changes | The structure of SIS extraction seems to have changed a little...also for ESR injection.
 
 |   | 
| 75 | Sat May  8 15:18:23 2021 | Michael, Wolfram, Yuri | General | Beam Settings changing | Beam settings are being changed back to 78Kr beam at 467 Mev/u.
 |  | 
| 100 | Sun May  9 06:53:20 2021 | Iris, Chris G., Jacobus, Michele | General | Summary night shift | The tune last night was unfortunately not to 52Mn. The two "isomers" that were identified
 are instead 45Sc and 75Br. But separation
 |  |