HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 4 of 12  Not logged in ELOG logo
Entry  Fri Jul 2 19:57:12 2021, Shahab, Yuri, Wolfram, Liliana, Runs, stop DAQ  
At 19:56 the DAQ is stopped. 
The plan is to go back to the setting for Se. 
Last files for the Br setting:
Entry  Fri Jul 2 20:01:16 2021, Liliana, Runs, Some plots from the Br setting 6x
 
Entry  Thu May 6 14:30:23 2021, W. Korten, General, Target thickness 
Thickness of the Carbon target in the TE line has been measured by centering the primary 78Kr beam in the ESR:
Beam energy 370 MeV/u, with thin stripper, ESR energy 368.65 MeV
Adjust beam with "thick" target to keep ESR energy at 368.65 MeV/u -> Beam energy 445 MeV/u
Entry  Thu May 6 17:48:48 2021, W. Korten, Helmut, General, ESR setting for 72Ge ions with primary beam  
Setting the 78Kr (after the target) to the Brho of the 72Ge beam at 368.4 MeV/u (gamma=1.3955), i.e. 6.79575 Tm, which leads to an energy of 392.93 (of
78Kr). 
With the 10mm Be target the beam energy should then be 467.8 MeV/u .
Entry  Fri May 7 03:33:11 2021, Liliana, Akash, Wolfram, Helmut, Shahab, General, status 
At the moment we see a second peak to the left of each intense line. 
The distance between the main peak and the shadow is roughly the same for each peak.
This hints to a sharp fall in the isochronicity curve.
Entry  Fri May 7 03:46:58 2021, Liliana, Akash, Wolfram, Helmut, Shahab, General, Scraper settings IMG_20210507_034213_resized_20210507_034848181.jpg
Scraper settings have been played around with to try and remove satellite lines...

Helmut has now set scraper id GE01DS_H at -45mm (in position)
Entry  Fri May 7 07:52:12 2021, Ragan, Andrew, General, To change trigger position 
Xiangcheng suggested to change the trigger position in order to start the file with the injection. Nothing is changed at the moment. Maybe Shahab or Yuri
can do it when they arrive.
Entry  Fri May 7 08:55:33 2021, Ragan, Andrew, Yuri, General, Trigger changed photo_2021-05-07_08-58-58.jpg
Trigger for both the spectrum analyzers is changed from 50% to 1% by Yuri.
For this, the ESR pattern was stopped at 08:50 and was started back at 08:53.
Entry  Fri May 7 09:36:32 2021, Ragan, Andrew, Yuri, General, Beam stop at 0928, adjust scope 
It was requested from the SIS to stop the beam at 09:28 
Yuri is adjusting the scope in order to avoid UFO (unidentified frequency object)
Entry  Fri May 7 11:40:20 2021, Ragan, Andrew, Yuri, General, Scraper is fixed - optimisation stage 
Scraper is fixed, we start again. Scraper open to let everything through
Entry  Fri May 7 12:37:35 2021, Ragan, Andrew, Yuri, Alex, General, Back with beam  
We are back with the beam in the ESR since 12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
E02DS3HG = - 35 mm
Entry  Fri May 7 14:33:23 2021, Andrew Ragan Yuri , General, Beam is back 
 
Entry  Fri May 7 22:48:33 2021, Chris, General, still running... E143-245MHz-2021.05.07.21.46.10.889.tiq.pngZoom_screenshot.PNG
In anticipation of the imminent shift change, a snapshot of how things look.
Entry  Sat May 8 00:38:55 2021, Philipp, Marta, General, Screenshot Screenshot_2021-05-08_at_00.32.16.png
 
Entry  Sat May 8 01:06:19 2021, Philipp, Marta, General, Screenshot Screenshot_2021-05-08_at_00.58.16.png
The signal of the transformer on the lower right panel is not really beam related. It is mostly noise. Changes are not so expected with this low beam intensity
Entry  Sat May 8 07:14:00 2021, Akash, Nic, Jelena, Zsolt, General, Morning shift entry 
Things look ok. No settings have been changed...

Analysis attempts are going on...
Entry  Sat May 8 07:34:08 2021, Akash, Nic, Jelena, Zsolt, General, Zoom has its own mind 
Zoom kicked us all out... we managed to get back in...screen sharing is back on.
Entry  Sat May 8 08:12:02 2021, Akash, Nic, Jelena, Zsolt, General, SIS, ESR time structure changes Screenshot_2021-05-08_at_08.08.14.png
The structure of SIS extraction seems to have changed a little...also for ESR injection.

In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component.
Entry  Sat May 8 15:18:23 2021, Michael, Wolfram, Yuri, General, Beam Settings changing 
Beam settings are being changed back to 78Kr beam at 467 Mev/u. 
Entry  Sun May 9 06:53:20 2021, Iris, Chris G., Jacobus, Michele, General, Summary night shift 
The tune last night was unfortunately not to 52Mn. The two "isomers" that were identified are instead 45Sc and 75Br. But separation looks okay. ESR morning
shift should try to tune to 52Mn to identify the 21-min isomer at 378 keV.
ELOG V3.1.5-fc6679b