ID |
Date |
Author |
Category |
Subject |
Text |
|
218
|
Fri Jul 2 19:57:12 2021 |
Shahab, Yuri, Wolfram, Liliana | Runs | stop DAQ | At 19:56 the DAQ is stopped.
The plan is to go back to the setting for
Se.
|
|
219
|
Fri Jul 2 20:01:16 2021 |
Liliana | Runs | Some plots from the Br setting | |
6x |
11
|
Thu May 6 14:30:23 2021 |
W. Korten | General | Target thickness | Thickness of the Carbon target in the TE line
has been measured by centering the primary
78Kr beam in the ESR:
|
|
14
|
Thu May 6 17:48:48 2021 |
W. Korten, Helmut | General | ESR setting for 72Ge ions with primary beam | Setting the 78Kr (after the target) to the
Brho of the 72Ge beam at 368.4 MeV/u (gamma=1.3955),
i.e. 6.79575 Tm, which leads to an energy |
|
26
|
Fri May 7 03:33:11 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | General | status | At the moment we see a second peak to the
left of each intense line.
The distance between the main peak and the |
|
28
|
Fri May 7 03:46:58 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | General | Scraper settings | Scraper settings have been played around with
to try and remove satellite lines...
|
|
35
|
Fri May 7 07:52:12 2021 |
Ragan, Andrew | General | To change trigger position | Xiangcheng suggested to change the trigger
position in order to start the file with
the injection. Nothing is changed at the |
|
37
|
Fri May 7 08:55:33 2021 |
Ragan, Andrew, Yuri | General | Trigger changed | Trigger for both the spectrum analyzers is
changed from 50% to 1% by Yuri.
For this, the ESR pattern was stopped at |
|
38
|
Fri May 7 09:36:32 2021 |
Ragan, Andrew, Yuri | General | Beam stop at 0928, adjust scope | It was requested from the SIS to stop the
beam at 09:28
Yuri is adjusting the scope in order to avoid |
|
44
|
Fri May 7 11:40:20 2021 |
Ragan, Andrew, Yuri | General | Scraper is fixed - optimisation stage | Scraper is fixed, we start again. Scraper
open to let everything through |
|
45
|
Fri May 7 12:37:35 2021 |
Ragan, Andrew, Yuri, Alex | General | Back with beam | We are back with the beam in the ESR since
12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
|
|
47
|
Fri May 7 14:33:23 2021 |
Andrew Ragan Yuri | General | Beam is back | |
|
60
|
Fri May 7 22:48:33 2021 |
Chris | General | still running... | In anticipation of the imminent shift change,
a snapshot of how things look. |
|
62
|
Sat May 8 00:38:55 2021 |
Philipp, Marta | General | Screenshot | |
|
63
|
Sat May 8 01:06:19 2021 |
Philipp, Marta | General | Screenshot | The signal of the transformer on the lower
right panel is not really beam related. It
is mostly noise. Changes are not so expected |
|
68
|
Sat May 8 07:14:00 2021 |
Akash, Nic, Jelena, Zsolt | General | Morning shift entry | Things look ok. No settings have been changed...
Analysis attempts are going on... |
|
69
|
Sat May 8 07:34:08 2021 |
Akash, Nic, Jelena, Zsolt | General | Zoom has its own mind | Zoom kicked us all out... we managed to get
back in...screen sharing is back on. |
|
70
|
Sat May 8 08:12:02 2021 |
Akash, Nic, Jelena, Zsolt | General | SIS, ESR time structure changes | The structure of SIS extraction seems to have
changed a little...also for ESR injection.
|
|
75
|
Sat May 8 15:18:23 2021 |
Michael, Wolfram, Yuri | General | Beam Settings changing | Beam settings are being changed back to 78Kr
beam at 467 Mev/u. |
|
100
|
Sun May 9 06:53:20 2021 |
Iris, Chris G., Jacobus, Michele | General | Summary night shift | The tune last night was unfortunately not
to 52Mn. The two "isomers" that were identified