HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 4 of 12  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Categorydown Subject Text Attachments
  218   Fri Jul 2 19:57:12 2021 Shahab, Yuri, Wolfram, LilianaRunsstop DAQ At 19:56 the DAQ is stopped. 
The plan is to go back to the setting for
Se. 
  
  219   Fri Jul 2 20:01:16 2021 LilianaRunsSome plots from the Br setting   6x 
  11   Thu May 6 14:30:23 2021 W. KortenGeneralTarget thicknessThickness of the Carbon target in the TE line
has been measured by centering the primary
78Kr beam in the ESR:
  
  14   Thu May 6 17:48:48 2021 W. Korten, HelmutGeneralESR setting for 72Ge ions with primary beam Setting the 78Kr (after the target) to the
Brho of the 72Ge beam at 368.4 MeV/u (gamma=1.3955),
i.e. 6.79575 Tm, which leads to an energy
  
  26   Fri May 7 03:33:11 2021 Liliana, Akash, Wolfram, Helmut, ShahabGeneralstatusAt the moment we see a second peak to the
left of each intense line. 
The distance between the main peak and the
  
  28   Fri May 7 03:46:58 2021 Liliana, Akash, Wolfram, Helmut, ShahabGeneralScraper settingsScraper settings have been played around with
to try and remove satellite lines...
 IMG_20210507_034213_resized_20210507_034848181.jpg 
  35   Fri May 7 07:52:12 2021 Ragan, AndrewGeneralTo change trigger positionXiangcheng suggested to change the trigger
position in order to start the file with
the injection. Nothing is changed at the
  
  37   Fri May 7 08:55:33 2021 Ragan, Andrew, YuriGeneralTrigger changedTrigger for both the spectrum analyzers is
changed from 50% to 1% by Yuri.
For this, the ESR pattern was stopped at
 photo_2021-05-07_08-58-58.jpg 
  38   Fri May 7 09:36:32 2021 Ragan, Andrew, YuriGeneralBeam stop at 0928, adjust scopeIt was requested from the SIS to stop the
beam at 09:28 
Yuri is adjusting the scope in order to avoid
  
  44   Fri May 7 11:40:20 2021 Ragan, Andrew, YuriGeneralScraper is fixed - optimisation stageScraper is fixed, we start again. Scraper
open to let everything through
  
  45   Fri May 7 12:37:35 2021 Ragan, Andrew, Yuri, AlexGeneralBack with beam We are back with the beam in the ESR since
12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
  
  47   Fri May 7 14:33:23 2021 Andrew Ragan Yuri GeneralBeam is back    
  60   Fri May 7 22:48:33 2021 ChrisGeneralstill running...In anticipation of the imminent shift change,
a snapshot of how things look.
 E143-245MHz-2021.05.07.21.46.10.889.tiq.pngZoom_screenshot.PNG 
  62   Sat May 8 00:38:55 2021 Philipp, MartaGeneralScreenshot   Screenshot_2021-05-08_at_00.32.16.png 
  63   Sat May 8 01:06:19 2021 Philipp, MartaGeneralScreenshotThe signal of the transformer on the lower
right panel is not really beam related. It
is mostly noise. Changes are not so expected
 Screenshot_2021-05-08_at_00.58.16.png 
  68   Sat May 8 07:14:00 2021 Akash, Nic, Jelena, ZsoltGeneralMorning shift entryThings look ok. No settings have been changed...

Analysis attempts are going on...
  
  69   Sat May 8 07:34:08 2021 Akash, Nic, Jelena, ZsoltGeneralZoom has its own mindZoom kicked us all out... we managed to get
back in...screen sharing is back on.
  
  70   Sat May 8 08:12:02 2021 Akash, Nic, Jelena, ZsoltGeneralSIS, ESR time structure changesThe structure of SIS extraction seems to have
changed a little...also for ESR injection.
 Screenshot_2021-05-08_at_08.08.14.png 
  75   Sat May 8 15:18:23 2021 Michael, Wolfram, YuriGeneralBeam Settings changingBeam settings are being changed back to 78Kr
beam at 467 Mev/u. 
  
  100   Sun May 9 06:53:20 2021 Iris, Chris G., Jacobus, MicheleGeneralSummary night shiftThe tune last night was unfortunately not
to 52Mn. The two "isomers" that were identified
are instead 45Sc and 75Br. But separation
  
ELOG V3.1.5-fc6679b