HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  nuclear two-photon decay, Page 6 of 12  Not logged in ELOG logo
ID Date Author Category Subjectdown
  62   Sat May 8 00:38:55 2021 Philipp, MartaGeneralScreenshot
Attachment 1: Screenshot_2021-05-08_at_00.32.16.png
Screenshot_2021-05-08_at_00.32.16.png
  63   Sat May 8 01:06:19 2021 Philipp, MartaGeneralScreenshot
The signal of the transformer on the lower right panel is not really beam related. It is mostly noise. Changes are not so expected with this low beam intensity
Attachment 1: Screenshot_2021-05-08_at_00.58.16.png
Screenshot_2021-05-08_at_00.58.16.png
  214   Fri Jul 2 16:14:17 2021 YuriAcceleratorScrapers 4 72Br
Starting 15:15
The scrapers are moved very much close to each other to eliminate all background particles and leaving basically single ions injected for 72Br. Do not wonder, this means that also many empty files are created.
Scrapers:
E02DS3HG -> -40 mm
EEXDS1HG -> +5 mm
EEXDS2HA -> 0.0 mm

One sees probably a decay of 100 keV isomer, see the attached figure at about 18 s
We will run a few hours with this setting
Attachment 1: 1C28A49A-5FA1-4A81-8675-3ED9660FD793.png
1C28A49A-5FA1-4A81-8675-3ED9660FD793.png
  209   Fri Jul 2 13:10:00 2021 YuriAcceleratorScrapers
12:46 moved the TOF detector scraper back to -11 mm
  28   Fri May 7 03:46:58 2021 Liliana, Akash, Wolfram, Helmut, ShahabGeneralScraper settings
Scraper settings have been played around with to try and remove satellite lines...

Helmut has now set scraper id GE01DS_H at -45mm (in position)

Image of injection structure attached... 72Ge is the isotope in focus on the RSA
Attachment 1: IMG_20210507_034213_resized_20210507_034848181.jpg
IMG_20210507_034213_resized_20210507_034848181.jpg
  158   Wed Jun 30 19:59:39 2021 ShahabRunsScraper positions
current scraper positions suggested by Sergey:

GEEXDS2HA = -11mm
GE01DS-H (innen) = -58mm
  44   Fri May 7 11:40:20 2021 Ragan, Andrew, YuriGeneralScraper is fixed - optimisation stage
Scraper is fixed, we start again. Scraper open to let everything through
  13   Thu May 6 17:02:49 2021 Ragan, Rui-JiuDAQScaler signals and parameters of NTCAP
At the moment, we record 7 signals in scaler channels and one Schottky signal (245 MHz resonance cavity) in the NTCAP with the attached information.
Attachment 1: p1.JPG
p1.JPG
Attachment 2: p2.JPG
p2.JPG
Attachment 3: p4.png
p4.png
  70   Sat May 8 08:12:02 2021 Akash, Nic, Jelena, ZsoltGeneralSIS, ESR time structure changes
The structure of SIS extraction seems to have changed a little...also for ESR injection.

In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component.
Attachment 1: Screenshot_2021-05-08_at_08.08.14.png
Screenshot_2021-05-08_at_08.08.14.png
  46   Fri May 7 14:06:02 2021 YuriAcceleratorSIS kicker failure
  160   Wed Jun 30 20:21:47 2021 Ragan, HelenaGeneralSIS intensity is back
SIS intensity is back
  101   Sun May 9 07:16:47 2021 Iris, Chris G., Jacobus, MicheleAnalysisRuns 3-4am Not_Mn52
Summed up runs on the 245 MHz detector between 3-4am (computer time).
-s 0.1 -t 8.0
Attachment 1: Not_52Mn_245MHz_May09_3-4am_s0_1_t8_0.root
Attachment 2: Not_52Mn_245MHz_May09_3-4am_s0_1_t8_0.png
Not_52Mn_245MHz_May09_3-4am_s0_1_t8_0.png
  99   Sun May 9 06:34:37 2021 Iris, Chris G., Jacobus, MicheleAnalysisRuns 2-3am Not_Mn52
Summed up runs on the 245 MHz detector between 2-3am (computer time).
One has -s 0.1 -t 8.0
the other -s 5.1 -t 0.5

Not sure if it is useful but here it is :-)
Attachment 1: Not_52Mn_245MHz_May09_2-3am_s0_1_t8_0.png
Not_52Mn_245MHz_May09_2-3am_s0_1_t8_0.png
Attachment 2: Not_52Mn_245MHz_May09_2-3am_s0_1_t8_0.root
Attachment 3: Not_52Mn_245MHz_May09_2-3am_s5_1_t0_5.png
Not_52Mn_245MHz_May09_2-3am_s5_1_t0_5.png
Attachment 4: Not_52Mn_245MHz_May09_2-3am_s5_1_t0_5.root
  129   Mon May 10 06:16:31 2021 Kanika, Alex, ShahabRunsRecording broad band spectra with 410
doing some broadband spectra recording with the 410 MHz detector, for the purpose of future confirmation of identification lines.
  155   Wed Jun 30 14:52:28 2021 OliverGeneralRe-Started data taking...
Main user is finished. We started data taking again...
  30   Fri May 7 04:01:51 2021 ShahabRunsPicture after scraping
this picture is after scraping by helmut, showing the 410 MHz detector, that is we would expect an isomer where the marker M1 is, i.e. at 2.2kHz on the left side, which we unfortunately don’t see (yet).
Attachment 1: pic.jpg
pic.jpg
  34   Fri May 7 07:02:33 2021 Guy LeckenbyAnalysisOnline Monitoring Plots
In compliment to Liliana's plots, this is the summed spectra I calculated from 0338 to 0507.
Attachment 1: E143_spec_1sec.png
E143_spec_1sec.png
  96   Sun May 9 05:56:29 2021 Iris, Chris G., Jacobus, MicheleAnalysisNot_52Mn spectra added up
Attached is a summed spectra of all files taken between 1:17am and 1:59am (on the 245 MHz detector).

python3 e143_analyzer.py -s 5.1 -t 0.5 /home/dillmann/E143/e143-scripts/sparc-daq-02.gsi.de/E143-245MHz/E143-245MHz-2021.05.09.01.* -o Not_52Mn_245MHz_May09_1-2am
(Might need to adapt the skip time and read-in time, thou... used the same as for the 72Ge runs...)
Attachment 1: Not_52Mn_245MHz_May09_1-2am.png
Not_52Mn_245MHz_May09_1-2am.png
Attachment 2: Not_52Mn_245MHz_May09_1-2am.root
  123   Mon May 10 00:51:38 2021 Kanika, Alex, RuiJiuGeneralNo beam in SIS
The beam was lost in SIS about 5 mins ago due to the failure of HF cavities. Operators are trying to solve the problem.
  72   Sat May 8 08:44:32 2021 Akash, Nic, Jelena, ZsoltAcceleratorNo Beam!
08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet!

10.10am: SIS resumed operations. However, there are some issues with magnet power supplies for ESR and hence we still don't have beam. HKR member went to look for power supply expert.

10.15am: There were some random triggers coming from ESR, which resulted in files being written. To avoid this, the scope trig (both scopes) were taken out. As soon as the beam comes in 'properly', I will reconnect the trig in to the scopes (-akash).

10.40am: They sent something to ESR but it does not make sense...so HKR has called an ESR expert (Sergey).

11.30am: Yuri is here and trying to sort out the issue- no data being written yet.
ELOG V3.1.5-fc6679b