HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  nuclear two-photon decay, Page 6 of 12  Not logged in ELOG logo
Entry  Sat May 8 00:38:55 2021, Philipp, Marta, General, Screenshot Screenshot_2021-05-08_at_00.32.16.png
 
Entry  Sat May 8 01:06:19 2021, Philipp, Marta, General, Screenshot Screenshot_2021-05-08_at_00.58.16.png
The signal of the transformer on the lower right panel is not really beam related. It is mostly noise. Changes are not so expected with this low beam intensity
Entry  Fri Jul 2 16:14:17 2021, Yuri, Accelerator, Scrapers 4 72Br 1C28A49A-5FA1-4A81-8675-3ED9660FD793.png
Starting 15:15
The scrapers are moved very much close to each other to eliminate all background particles and leaving basically single ions injected for 72Br. Do not
wonder, this means that also many empty files are created.
Entry  Fri Jul 2 13:10:00 2021, Yuri, Accelerator, Scrapers 
12:46 moved the TOF detector scraper back to -11 mm
Entry  Fri May 7 03:46:58 2021, Liliana, Akash, Wolfram, Helmut, Shahab, General, Scraper settings IMG_20210507_034213_resized_20210507_034848181.jpg
Scraper settings have been played around with to try and remove satellite lines...

Helmut has now set scraper id GE01DS_H at -45mm (in position)
Entry  Wed Jun 30 19:59:39 2021, Shahab, Runs, Scraper positions 
current scraper positions suggested by Sergey:

GEEXDS2HA = -11mm
Entry  Fri May 7 11:40:20 2021, Ragan, Andrew, Yuri, General, Scraper is fixed - optimisation stage 
Scraper is fixed, we start again. Scraper open to let everything through
Entry  Thu May 6 17:02:49 2021, Ragan, Rui-Jiu, DAQ, Scaler signals and parameters of NTCAP p1.JPGp2.JPGp4.png
At the moment, we record 7 signals in scaler channels and one Schottky signal (245 MHz resonance cavity) in the NTCAP with the attached information.
Entry  Sat May 8 08:12:02 2021, Akash, Nic, Jelena, Zsolt, General, SIS, ESR time structure changes Screenshot_2021-05-08_at_08.08.14.png
The structure of SIS extraction seems to have changed a little...also for ESR injection.

In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component.
Entry  Fri May 7 14:06:02 2021, Yuri, Accelerator, SIS kicker failure 
 
    Reply  Wed Jun 30 20:21:47 2021, Ragan, Helena, General, SIS intensity is back 
SIS intensity is back
    Reply  Sun May 9 07:16:47 2021, Iris, Chris G., Jacobus, Michele, Analysis, Runs 3-4am Not_Mn52 Not_52Mn_245MHz_May09_3-4am_s0_1_t8_0.rootNot_52Mn_245MHz_May09_3-4am_s0_1_t8_0.png
Summed up runs on the 245 MHz detector between 3-4am (computer time).
-s 0.1 -t 8.0
Entry  Sun May 9 06:34:37 2021, Iris, Chris G., Jacobus, Michele, Analysis, Runs 2-3am Not_Mn52 Not_52Mn_245MHz_May09_2-3am_s0_1_t8_0.pngNot_52Mn_245MHz_May09_2-3am_s0_1_t8_0.rootNot_52Mn_245MHz_May09_2-3am_s5_1_t0_5.pngNot_52Mn_245MHz_May09_2-3am_s5_1_t0_5.root
Summed up runs on the 245 MHz detector between 2-3am (computer time).
One has -s 0.1 -t 8.0
the other -s 5.1 -t 0.5
Entry  Mon May 10 06:16:31 2021, Kanika, Alex, Shahab, Runs, Recording broad band spectra with 410 
doing some broadband spectra recording with the 410 MHz detector, for the purpose of future confirmation of identification lines.
Entry  Wed Jun 30 14:52:28 2021, Oliver, General, Re-Started data taking... 
Main user is finished. We started data taking again...
Entry  Fri May 7 04:01:51 2021, Shahab, Runs, Picture after scraping pic.jpg
this picture is after scraping by helmut, showing the 410 MHz detector, that is we would expect an isomer where the marker M1 is, i.e. at 2.2kHz on the
left side, which we unfortunately don’t see (yet).
Entry  Fri May 7 07:02:33 2021, Guy Leckenby, Analysis, Online Monitoring Plots E143_spec_1sec.png
In compliment to Liliana's plots, this is the summed spectra I calculated from 0338 to 0507.
Entry  Sun May 9 05:56:29 2021, Iris, Chris G., Jacobus, Michele, Analysis, Not_52Mn spectra added up Not_52Mn_245MHz_May09_1-2am.pngNot_52Mn_245MHz_May09_1-2am.root
Attached is a summed spectra of all files taken between 1:17am and 1:59am (on the 245 MHz detector).

python3 e143_analyzer.py -s 5.1 -t 0.5 /home/dillmann/E143/e143-scripts/sparc-daq-02.gsi.de/E143-245MHz/E143-245MHz-2021.05.09.01.* -o Not_52Mn_245MHz_May09_1-2am
Entry  Mon May 10 00:51:38 2021, Kanika, Alex, RuiJiu, General, No beam in SIS 
The beam was lost in SIS about 5 mins ago due to the failure of HF cavities. Operators are trying to solve the problem.
Entry  Sat May 8 08:44:32 2021, Akash, Nic, Jelena, Zsolt, Accelerator, No Beam! 
08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet!

10.10am: SIS resumed operations. However, there are some issues with magnet power supplies for ESR and hence we still don't have beam. HKR member went
ELOG V3.1.5-fc6679b