HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 9 of 11  Not logged in ELOG logo
Entry  Fri May 7 18:43:13 2021, Kanika, Michael, Shahab, Runs, cave M experiment needs more spills rep.jpg
our pattern causes beam loss while scanning the biological probes in the Cave M bio experiment. They loose every other spill due to high request rate from
ESR.
Entry  Fri May 7 18:08:35 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, going back to the original energy 
going back to the original energy 441 MeV/u

last filenames with the previous energy:
Entry  Fri May 7 17:35:22 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, Energy change +6 MeV/u 
We will now go up in energy to 447 MeV (+6 MeV) from the original energy

last file name with previous energy:
Entry  Fri May 7 17:12:52 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, trigger time back to 50% 
changed trigger time back to 50%

last file with 1% trigger: 
Entry  Fri May 7 17:12:14 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, Energy change -6 MeV/u 
changed the energy down to 435 MeV/u
Entry  Fri May 7 17:02:51 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, new sextupole setting 2 
There is new sextupole settings, but the scrapers remain like last night (Helmut setting last night.)
Entry  Fri May 7 16:17:21 2021, Sergey, Yuri, Wolfram, Shahab, Runs, new sextupole setting 
new sextupole setting, isomer not visible yet.
Entry  Fri May 7 16:09:50 2021, Yuri, Accelerator, Stop, change of sextuple settings 
 
Entry  Fri May 7 14:33:23 2021, Andrew Ragan Yuri , General, Beam is back 
 
Entry  Fri May 7 14:06:02 2021, Yuri, Accelerator, SIS kicker failure 
 
Entry  Fri May 7 12:37:35 2021, Ragan, Andrew, Yuri, Alex, General, Back with beam  
We are back with the beam in the ESR since 12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
E02DS3HG = - 35 mm
Entry  Fri May 7 11:40:20 2021, Ragan, Andrew, Yuri, General, Scraper is fixed - optimisation stage 
Scraper is fixed, we start again. Scraper open to let everything through
Entry  Fri May 7 10:46:40 2021, Yuri, Accelerator, GE02DS3HG 
The scraper is blocked at -10 mm and -unfortunately- blocks the beam in the ESR. Uli Popp is taking care.
Entry  Fri May 7 10:05:06 2021, Yuri, Accelerator, E02DS3HG does not drive 
E02DS3HG stays at -35 mm and does not react
Entry  Fri May 7 09:58:04 2021, Yuri, Accelerator, Setting up KO extraction for Caves 
SIS optimisation requires us to stop. Only sporadic shots.
Entry  Fri May 7 09:56:43 2021, Yuri, Calibration, Identification Verification 
With closed scrapers there are only a few weak lines.
Open temporarily all scrapers in the ESR to write down the frequencies. 
Entry  Fri May 7 09:36:32 2021, Ragan, Andrew, Yuri, General, Beam stop at 0928, adjust scope 
It was requested from the SIS to stop the beam at 09:28 
Yuri is adjusting the scope in order to avoid UFO (unidentified frequency object)
Entry  Fri May 7 08:55:33 2021, Ragan, Andrew, Yuri, General, Trigger changed photo_2021-05-07_08-58-58.jpg
Trigger for both the spectrum analyzers is changed from 50% to 1% by Yuri.
For this, the ESR pattern was stopped at 08:50 and was started back at 08:53.
Entry  Fri May 7 08:04:22 2021, Carlo Bruno, Desislava Kalaydjieva, Analysis, 7:00 - 14:00 analysis shift 15x
(See
https://triumfoffice365-my.sharepoint.com/:w:/g/personal/dillmann_triumf_ca/Eb_LCp7yTx5Bgc8TO8khJmEBWeS-ycdPRnG02wQout-fgQ?rtime=3n3A3xMR2Ug
for remote shifter instructions. To be updated/corrected by the experts)
Entry  Fri May 7 07:52:12 2021, Ragan, Andrew, General, To change trigger position 
Xiangcheng suggested to change the trigger position in order to start the file with the injection. Nothing is changed at the moment. Maybe Shahab or Yuri
can do it when they arrive.
ELOG V3.1.5-fc6679b