|  Sat May  8 15:18:23 2021, Michael, Wolfram, Yuri, General, Beam Settings changing | 
| Beam settings are being changed back to 78Kr beam at 467 Mev/u. | 
|  Sat May  8 11:42:21 2021, Yuri, Accelerator, KPs | 
| EO1KP03 was on = -44.9 A E01KP05 was off, now is on = 3.67 A
 The beam is on the right frequency, but the width is still very broad.
 | 
|  Sat May  8 10:51:41 2021, Akash, Nic, Jelena, Zsolt, Calibration, ESR settings seem different   | 
| Settings don't look the same...so we are not yet writing files unless sure. | 
|  Sat May  8 08:44:32 2021, Akash, Nic, Jelena, Zsolt, Accelerator, No Beam! | 
| 08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet! 
 10.10am: SIS resumed operations. However, there are some issues with magnet power supplies for ESR and hence we still don't have beam. HKR member went
 | 
|  Sat May  8 08:16:08 2021, Akash, Nic, Jelena, Zsolt, Analysis, Night shift analysis 16x   | 
| (Jelena has analysed these data files) 
 E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5)  (2021.05.08.09.01.11.png)
 | 
|  Sat May  8 08:12:02 2021, Akash, Nic, Jelena, Zsolt, General, SIS, ESR time structure changes   | 
| The structure of SIS extraction seems to have changed a little...also for ESR injection. 
 In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component.
 | 
|  Sat May  8 07:34:08 2021, Akash, Nic, Jelena, Zsolt, General, Zoom has its own mind | 
| Zoom kicked us all out... we managed to get back in...screen sharing is back on. | 
|  Sat May  8 07:14:00 2021, Akash, Nic, Jelena, Zsolt, General, Morning shift entry | 
| Things look ok. No settings have been changed... 
 Analysis attempts are going on...
 | 
|  Sat May  8 03:08:57 2021, Rui-Jiu Chen, DAQ, Change reference level to -50dBm | 
| Start a new run. The data of new run is in : SC_2021-05-07_17-39-16
 IQ_2021-05-07_17-39-16
 | 
|  Sat May  8 03:05:42 2021, Rui-Jiu Chen, DAQ, Change reference level to -60dBm | 
| Start a new run. The data of new run is in : SC_2021-05-07_17-33-29
 IQ_2021-05-07_17-33-29
 | 
|  Sat May  8 01:43:23 2021, Helmut Weick, Accelerator, 70Se setting | 
| If gamma_t = 1.3955 Tm stays, we will need Brho = 6.21902 Tm for 70Se. The corresponding ESR Brho setting will be a bit shifted.
 It then requires E-SIS = 446.55 MeV/u to get 70Se to this Brho and gamma_t.
 | 
|  Sat May  8 01:33:25 2021, Helmut Weick, Simulations, frequency list for 70Se setting    | 
| EXCEL table with all possible fragments injected into ESR. The path length in ESR, gamma_t and harmonic are adjusted to the 72Ge data.
 Some lifetimes are limited but all intense lines are >30s in lab system.
 | 
|  Sat May  8 01:06:19 2021, Philipp, Marta, General, Screenshot   | 
| The signal of the transformer on the lower right panel is not really beam related. It is mostly noise. Changes are not so expected with this low beam intensity | 
|  Sat May  8 00:38:55 2021, Philipp, Marta, General, Screenshot   | 
|  | 
|  Fri May  7 23:08:44 2021, Michael, Kanika, Accelerator, Beam issues for short duration | 
| The beam was lost for a few minutes from 23:01 to 23:06. It is back now. | 
|  Fri May  7 22:48:33 2021, Chris, General, still running...    | 
| In anticipation of the imminent shift change, a snapshot of how things look. | 
|  Fri May  7 22:00:36 2021, Chris, Accelerator, brief beam loss | 
| Brief interruption in beam, ~21:42-21:51. | 
|  Fri May  7 20:34:27 2021, Kanika, Michael, Shahab, Runs, back to 15 sec recording | 
| now we are going back to 15 sec operation. Cave M (bio) operation is over | 
|  Fri May  7 20:28:32 2021, Kanika, Michael, Shahab, Analysis, Some pictures from the 410 detector 9x   | 
| some pics. | 
|  Fri May  7 19:56:10 2021, Kanika, Michael, Shahab, Runs, ZOOM session restart | 
| restart zoom session |