HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Laser Cooling Experiment 2021, Page 1 of 5  Not logged in ELOG logo
Entry  Thu May 13 00:58:53 2021, Danyal, DAQ, unbunched ion beam not_bunched_-_signal.jpgnot_bunched_-_Schottky.jpg
 
Entry  Fri May 14 01:34:44 2021, Team, General, strange XUV Anode signal Screenshot_(68).png
We see a strange behavior of the anode signal when we bunch the ion beam and electron cooler is on.

peak structure... ---> we play now with the bunching amplitude 
Entry  Wed May 12 13:11:58 2021, Danyal, Accelerator, short break between 13:30 and 15:30 
There will be a short break (2 hours) this afternoon. Between 13:30 and 15:30. 
The so-calles "super lense" in the UNILAC needs to be cleaned (rinsed). 
After that operation should continue as usual. 
Entry  Tue May 11 15:49:30 2021, Danyal, General, setting up ESR 
The operators are still busy extracting the beam from the SIS18 towards the ESR and injecting it into the ESR. 
Entry  Thu May 13 01:05:45 2021, Danyal, DAQ, more stability by bunching 
Because the C3+ part of the ion beam is properly bunched, it is no longer so sensitive to the drifts caused by the e-cooler. 
In the O4+ part of the ion beam these drifts can still be seen. 
Entry  Wed May 12 02:34:29 2021, Danyal, General, instabilities in ion frequency fluctuations.jpg
The ion beam moves around, pretty arbitrary. See picture. 
ESR crew believes that it is not due to fluctuations in the HV of the E-Cooler. 
    Reply  Wed May 12 08:10:17 2021, Lars, General, instabilities in ion frequency 
looks like the E-Cooler is responsible for this. If one turns off the electron current, the beam stays stable. 
M.Steck is informed.
Entry  Wed May 12 15:36:04 2021, Danyal, Accelerator, general power failure in ESR! (everything is off) 
The power in the ESR is off. 
(also on the gas-target area on top of ESR)
Electrical engineers are trying to find and fix the problem. 
Entry  Wed May 12 22:35:33 2021, Danyal, General, frev and fb 
Schottky frequency (189th harmonic) = 244.033662 MHz

revolution frequency  frev = 1.2911834 MHz
Entry  Wed May 12 08:32:04 2021, Sebastian, Analysis, fluorescence & energetic overlap Screenshot_(154).png
During the night shift we saw several rises of the fluorescence (see another entry) and also energetic overlap in coasting beam modus.
Here the laser wavelength was stabilized @ 1028,967nm and electron cooler was switched off because of some fluctuations which we saw in the schottky.
Left part of the schottky picture shows the c3+ beam, the right part is the o4+ contamination.
Entry  Tue May 11 18:29:35 2021, Danyal, General, first ions in the ESR first_ions_are_injected.jpg
 
Entry  Fri May 14 07:33:42 2021, Team #Night, General, ecooler central frequency shifted relative to bunch central frequency 
 
Entry  Thu May 13 01:01:27 2021, Danyal, DAQ, bunched ion beam bunched_-_signal.jpgbunched_-_Schottky.jpgzoom_bunched_-_Schottky.jpg
 
Entry  Tue May 11 20:14:43 2021, Danyal, General, bad ESR vacuum 
I just heard that the ESR vacuum is quite bad. 
There was a small vacuum problem a while ago, it was sealed, but apparently the pressure is not as low as usual.
Entry  Sat May 15 03:39:16 2021, Team, General, actual revolution frequency 
frev = 1,2912735 MHz
Entry  Fri May 14 07:20:18 2021, Team #Night, General, actual bunching frequency 
25,82556 MHz
h = 20
Entry  Tue May 31 07:29:11 2022, Ken, Detectors, XUV-Detektor 
Rate was very low: ~ 100Hz
Adjusted Walk level and Threshold, new rate: 5kHz
Additionally, parameters of the detector were varied for optimization but were returned to default afterwards.
Entry  Thu May 13 23:42:37 2021, Ken Ueberholz, General, What was done Schottky1.jpegSchottky2.jpegSchottky3.jpegSchottky4.jpeg
In this shift a number of successful Schottky measurements were done:
With fixed laser wavelength, while varying the wavelength, with different bunching and more (see logfile 1 for more info: line 53 to at least 107).
The detector software sometimes files to change the current of the power supplies, if this happens a simple restart of the GUI fixes the problem.
Entry  Thu May 13 18:34:54 2021, Ken Ueberholz, General, What happened scince shift change at 4pm 
Ion frequency shifts with laser, both manually and scanned, without bunches: successful
Bunching with 7 and 20 bunches: successful
Tried laser scans with bunches: unsuccessful
Entry  Wed May 12 23:36:18 2021, Ken Ueberholz, DAQ, VI change 
carbon main vi - kopie is now in operation

here, in keysight.vi the input settings for the new impedence for the multimeter are now hopefully correct --> THIS SHOULD BE CHECKED IF THE RING IS OPEN
ELOG V3.1.5-fc6679b