HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Laser Cooling Experiment 2021, Page 4 of 5  Not logged in ELOG logo
Entry  Sun May 16 21:23:02 2021, Team, General, ESR OPEN -> preparation for Polarisation Tests 
 
Entry  Fri May 14 22:20:37 2021, Team, Accelerator, ESR Closed - BEAM #ON! 
 
Entry  Wed May 12 10:14:18 2021, Lars, Accelerator, E-Cooler 
M.Steck et al. discussed about the E-Cooler and found a possible issue. They asked for enterance to the ESR. Since nobody else was in the HKR and anyway
nothing was running because of some other issues, I told, the experiment would not be disturbed and they could enter and do things. (Sth. like putting
some repeller electrodes onto hand and other magical things).
Entry  Sat May 15 06:51:16 2021, Night Shift Sebastian/Max/Noah, General, Different Laserscantypes 
We use different scan types (manual scan) or constant laser wavelengths to check the effects of laser cooling in the Schottky diagrams (fluorescence can
not be seen in the detector), for different bunching amplitudes and frequencies:
- Scan from 1028.950 -> 1028.940, stepsize 0.001 every 10 sec
Entry  Tue May 11 16:33:31 2021, Ken Ueberholz, Detectors, Detector control manual Manual.pdf
Attached to this elog entry is a short manual for the xuv-detector control. If anything is missing or not understandable I can change anything.
Entry  Wed May 12 19:48:24 2021, Sebastian, General, DSG821 Network IMG_20210512_195329_resized_20210512_075346417.jpg
To implement the bunch Signal Generator (DSG821 inside ESR) you have to:

1. unplug the Ethernet cable
Entry  Fri May 14 06:34:45 2021, Team #Night, Analysis, DSG821 IP 
140.181.104.108
Entry  Wed May 12 22:48:25 2021, Sebastian, General, DSG Control SCPI Commands 
Open Ultra Sigma
Press LAN
Press Search, after a while the whole rigol devices are shown. Press ok
Entry  Tue May 11 16:07:59 2021, Sebastian, DAQ, DAQ Manual DAQ_Manual.pdf
Attached you'll find a short manual for operating the whole DAQ system
Entry  Sat May 15 09:57:24 2021, Dayshift, Runs, Currently on schedule  
Enhance fluorescence rate and perform 
laser bunch timing 
Entry  Thu May 13 01:21:30 2021, Sebastian, General, Current schedule ... so far 
1.) check h=2,4,6,7,8,10 .... bunching frequencies with different amplitudes (signalgenerator), Ecooler ON, Laser OFF --> record schottky and "normal" DAQ

2.) Ecooler ON, Bunching ON, Laser ON (wavelength fixed and/or scanned)
Entry  Fri May 14 09:35:20 2021, Nightshift, Runs, Coasting beam, scanning laser, ecooler on IMG-20210514-WA0018.jpg
 
Entry  Fri May 14 09:38:04 2021, Nightshift, Runs, Coasting beam, scanning laser, ecooler on IMG-20210514-WA0018.jpg
 
Entry  Fri May 14 09:38:43 2021, Nightshift, Runs, Coasting beam, ecooler on, scanning laser IMG-20210514-WA0019.jpg
 
Entry  Wed May 12 22:28:55 2021, Ken Ueberholz, General, Bunching succesfull 
Bunching with 2 and 10 bunches succesfull
Entry  Thu May 13 01:13:06 2021, Sebastian, General, Bunching frequencies 
relating to Danyals ID 25 post are the current bunching frequencies:

h=2      -->     2,5823668 MHz
Entry  Sun May 16 11:29:22 2021, Benedikt, General, Automated laser scans working 
The automated laser scans are working now.
We can now scan with the following functions: triangle, sawtooth, cosinus/sinus, arctan, min (linear scan, than stands still)
Entry  Fri May 14 06:35:55 2021, Team #Night, General, Adjustment of Laser 
we increased the height of the laser beam

TEM Settings
Entry  Sun May 16 02:28:21 2021, Team, General, #Beam ON! 
Laser specs:
pulse length -> 482ps
Entry  Fri May 14 21:43:40 2021, Sebastian, General, "problems accelerator" 
There are cooling problems of some accelerator devices
short break, hopefully :)
Laser is switched of for some rest
ELOG V3.1.5-fc6679b