Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
2
Mon Sep 30 11:04:15 2019
Cristina
leak check
Cryo collimator 11-1-18-8
24.09.2019
DONE
Accepted
25.09.2019
Customised
25.09.2019
Accepted
26.09.2019
L. Bozyk
3
Mon Sep 30 11:11:26 2019
Cristina
test with bakeout
Laser chamber -Winters
Beginning 2019
Delayed
16.08.2019
DONE
Accepted
30.08.2019
Customised
12.02.2020
Accepted
KW10
D.Winters
The measurement was stopped because of the
wrong heating jackets
4
Mon Sep 30 11:15:47 2019
Cristina
test with bakeout
Detector Recoil chamber ESR
2.09.2019
DONE
Accepted
9.09.2019
Customised
29.10.2019
Cond. Accep.
1.11.19
Hillenbrand
The chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
5
Mon Sep 30 14:00:51 2019
Cristina
pumping speed
800 l/s Agilent
20.09.2019
DONE
Accepted
1Test:7.10.2019; 2Test: 14.11.2019
Fischer-Mommsen
1.11.19
Cond. Accep.
Sent back to Agilent
Pumping Speed measured a bit lower than stated
6
Mon Sep 30 14:04:43 2019
Cristina
pumping speed
Combi pump DN40
09.08.2019
DONE
Accepted
20.08.2019
Fischer-Mommsen
20.09.2019
Accepted
Sent back to Agilent
7
Mon Sep 30 14:06:07 2019
Cristina
pumping speed
Slim SIP 150
9.08.2019
DONE
Accepted
07.02.2020
Fischer-Mommsen
06.03.2020
Accepted
8
Wed Oct 9 07:55:47 2019
Phe
leak check
All metal gate valve (Bender)
08.10.2019
DONE
Accepted
21.10.2019
Customised
24.10.2019
Accepted
24.10.2019
M.Bender
Leak check required by Markus Bender for a
"all metal gate valve". The gate valve was
received on the 08.10.2019. No deadline.
9
Wed Oct 9 07:57:44 2019
Phe
test with bakeout
Cryring Detector Tube
09.10.2019
DONE
Accepted
10.10.2019
Setup 1
22.10.2019
Accepted
24.10.2019
Spillmann
Detector tube has been received from Grossmontage
(given to Andreas Kraemer). This Detector
tube is for Cryring - measurement request
10
Wed Oct 9 08:01:51 2019
Phe
test with bakeout
Macor Samples from Tino Giacomini
02.10.2019
DONE
Accepted
10.10.2019
Mobile 2
6.11.19
Accepted
8.11.19
Giacomini
Macor samples have been received from Tino
Giacomini on the 02.10.2019. These Macor
samples will be used for IPM chamber. The
11
Wed Oct 9 14:19:09 2019
Phe
test with bakeout
Scrapper for ESR (for Markus Steck)
09.10.2019
DONE
Accepted
14.10.2019
Setup 2
18.10.2019
Accepted
24.10.2019
Schwarz
Measurements asked as "urgent" for ESR. This
piece was already measured in 2014, and then
stored in an unkwon place.
12
Mon Oct 14 10:08:14 2019
Cristina
leak check
Dipole chamber SIS100 First charge
10.10.2019
DONE
Accepted
11.10.2019
Customised
29.11.2019
Accepted
Stored in the TH
6 dipole received on the KW41. Integral leak
check and 1 test without bakeout
After the
vacuum test the chambers must be inserted
13
Mon Oct 14 10:09:36 2019
Cristina
leak check
Roughing CWT 3 charge
10.10.2019
DONE
Accepted
14.10.2019
Customised
14.11.19
Accepted
Stored in Weiterstadt
Integral leak check to be done for all CWT.
DONE:
07-51-23-0; 07-51-26-1; 07-51-30-8;
07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6
14
Wed Oct 16 08:24:29 2019
Toni
leak check
Kryokollimator
June 2019
Delayed
August
from September 2019
DONE
Not Needed
02.09.2019
Customised
09.12.2020
Accepted
Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01;
11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9;
11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4;
15
Mon Oct 21 10:24:59 2019
Cristina
Other
Tube Heidelberg
17.10.2019
DONE
Accepted
First Test: 24.10.2019; Second Test:30.01.20
Horizontal Coating Setup
29.10.2019: Refused; Second Test: 05.02.2020
Accepted
11.02.2020
C.Schröter
Tube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
Draft
Thu Oct 24 14:55:28 2019
Toni
Draft
Thu Oct 24 14:58:25 2019
Toni
18
Fri Nov 1 10:41:45 2019
Cristina
test with bakeout
IPM Chamber
4.09.2019
DONE
Refused
Refused
1.11.19
Angelo
Bellows to short
19
Fri Nov 8 10:52:43 2019
Cristina
test with bakeout
Macor 2 for IPM
8.11.19
DONE
Accepted
11.11.2019
Mobile 2
18.11.2019
Accepted
04.12.19
T. Giacomini
20
Mon Nov 11 08:06:09 2019
Phe
test without bakeout
Ref. Chamber for Beam Diagnostic Manipulator (Hackhalle)
unknown
DONE
Accepted
11.11.2019; 10:15 am, stopped 12.11.2019
Customised
Refused
Broken gauge (cold cathode gauge).
21
Thu Nov 14 14:00:28 2019
Phe
test without bakeout
Ref. Chamber for Beam Diagnostic Manipulator
unknown
DONE
Accepted
14.11.2019; 10:30 am
Customised
22.11.2019
Cond. Accep.
N/A
N/A
Wide range gauge is now installed on the chamber.
The previous test with cold cathode gauge
failed due to broken gauge.
Another
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All